Metros Tenders

Ahmedabad Metro: Narmada Canal Extradosed Bridge’s 1st Segment Launched

[ad_1]


Besides the 810m Sabarmati River Bridge, the 28.254 km Ahmedabad Metro Phase 2 project’s viaduct also includes the construction of a 303m long extradosed bridge over Narmada Canal.

Afcons Infrastructure 2 weeks ago celebrated launching their first of 105 precast box segments for its construction, north of Ahmedabad city. This bridge of Phase 2 project’s 14.36 km Package C1 consists of 6 piers. The 2 main completed pylons (P4-14 and P4-15) are 36.5 meters tall and in the future will comprise of 9 stay cables each.

Gujarat’s Chief Minister recently visited the bridge’s construction site located between Narmada Canal Station and Koba Circle Station (view on Google Maps). Here are a couple design schematics from a video shared by DeshGujarat highlighting the visit:

Gujarat Metro Rail Corporation (GMRC) had awarded Afcons with 14.36 km Package C1’s construction contract in Q4 2020. Their scope includes the line’s 8.124 km elevated section from Motera Stadium to GNLU with 8 stations at Koteshwar Road, Vishwakarma College, Tapovan Circle, Narmada Canal, Koba Circle, Juna Koba, Koba Gam, and GNLU.

It also includes the 5.42 km section from GNLU to GIFT City with a bridge over Sabarmati River and 2 stations at Pandit Deendayal Petroleum University (PDPU) and Gujarat International Finance Tec-City (GIFT City).

Indicative route from Motera Stadium to Mahatma Mandir & GIFT City – view Ahmedabad Metro Phase 2 info & route map
Photo by Biswabhusan Nayak
Photo by Souvik Biswas
Photo by Gujarat_Com

For more updates, check out the Ahmedabad section or my Home Page! Sign up for free instant email notifications on new posts over here. Like this post? Get early-access to updates and support the site over here.

– TMRG



[ad_2]

Source link