Metros Tenders

11 Bidders for Mumbai Metro Line-12 Kalyan – Taloja’s Civil Work

[ad_1]


11 firms have submitted a total of 19 bids for the construction work of Mumbai Metro’s 20.75 km Line-12 (Orange Line) which will connect Kalyan – Dombivali – Taloja through 17 stations.

Mumbai’s Line-12 by Mumbai Metropolitan Region Development Authority (MMRDA) will be built as a 20.75 km southern elevated extension of the partially under construction 24.95 km Line-5 (Thane – Bhiwandi – Kalyan) at an estimated cost of Rs 4,132 crore.

MMRDA had invited tenders for its construction through 2 civil packages (CA-185 and CA-186) in February 2023 with a 30 month deadline.

Bidders

  • Afcons Infrastructure Ltd.
  • Gawar Construction Ltd.
  • G R Infraprojects Ltd.
  • J Kumar Infraprojects Ltd.
  • Kalpataru Power Transmission Ltd.
  • KEC International Ltd.
  • Larsen and Toubro Ltd.
  • NCC Ltd. – CA-185 only
  • SAM India Builtwell Pvt. Ltd. – CA-186 only
  • SP Singla Constructions Pvt. Ltd.
  • Tata Projects Ltd. – CA-185 only

Package CA-185 (Kalyan – Kolegaon)

Estimate: Rs. 783 crore

Brief Scope: Part design and construction of elevated viaduct (chainage -13.383 m to +10043.275 m) and 9 elevated stations viz. Ganesh Nagar, Pisavali Gaon, Golvali, Dombivli MIDC, Sagaon, Sonarpada, Manpada, Hedutane, Kolegaon of Line 12 [Kalyan-Taloja] of Mumbai Metro Rail Project

Package CA-186 (Kolegaon – Taloja)

Estimate: Rs. 738.80 crore

Brief Scope: Part design and construction of elevated viaduct (chainage +10043.275 m to +20400 m) and 08 elevated stations viz. Nilje Gaon, Vadavli (Khu), Bale, Waklan, Turbhe, Pisarve Depot, Pisarve, Taloja including connecting line to depot from main line (chainage 0+000 [main line reference chainage 12+543] to 1+393) from Vadavli (Khu) to Depot of Line 12 [Kalyan – Taloja] of Mumbai Metro Rail project.

17 stations are planned to be built at Ganesh Nagar, Pisvali Gaon, Golavali, Dombivli MIDC, Sagaon, Sonarpada, Manpada, Hedutane, Kolegaon, Nilaje Gaon, Vadavali, Bale, Waklan, Turbhe, Pisarve Depot, Pisarve, Taloja.

Indicative alignment of Mumbai Metro’s Line-12 (Kalyan – Dombivli MIDC – Nilje Gaon – Waklan – Taloja) – view Mumbai Metro Orange Line information

The bids have now been sent for technical evaluation which should take a couple months to complete. When that is done, the financial bids of the technically qualified bidders will be opened to reveal who’s the lowest bidder and most likely contractor for each package.

As shared in the past – looking at CA-186’s scope, it appears that this line’s depot will now come up at Vadavali instead of at Pisarve as originally planned.

Back in December 2022, SYSTRA MVA Consulting – DB Engineering & Consulting JV was awarded Line-10 and Line-12’s General Consultant contract. In March 2023, MMRDA received 6 bids for Line-12’s Detailed Design Consultant (DDC) contract. Technical bid evaluation is currently underway.

A list of all Line-12 packages and their status can be viewed here.

For more updates, check out the Mumbai section or my Home Page! Sign up for free instant email notifications on new posts over here. Like this post? Get early-access to updates and support the site over here.

– TMRG



[ad_2]

Source link