ETA Wins Delhi Metro Silver Line’s E&M, ECS & TVS Contract DE-11

SHARING HELPS OTHERS



ETA Engineering Pvt. Ltd. earlier this month was declared as the lowest bidder to install the electrical and mechanical system, environment control system and tunnel ventilation system at 4 underground stations of Delhi Metro’s 23.622 km Silver Line (Line-10).

This mostly underground line of Delhi Metro’s Phase 4 project in South Delhi will connect Aerocity – Tughalakabad via 16 stations. 12 of those stations will be underground and are being constructed through civil packages DC-07 (Afcons Infrastructure), DC-08 (J Kumar Infraprojects) and DC-09 (Larsen & Toubro).

The package’s brief scope doesn’t name the 4 stations, but I hear they’re Aerocity, Mahipalpur, Vasant Kunj and Kishangarh. If someone can confirm, then drop a comment below.

DMRC had invited tenders for this contract DE-11, funded by Japan International Cooperation Agency (JICA) in July 2022 with a 2.95 year deadline and unknown estimate. Technical bids were opened in October 2022 to reveal 7 bidders.

Financial Bid Values

Firm Bid (Rs. Crore)
ETA Engineering 183.61
Universal MEP Projects & Engineering Services 212.11
Efkon India 217.36
Sudhir Power 221.03
Blue Star 221.15
Larsen & Toubro (L&T) 240.07
Sterling And Wilson (SWPL) 259.18

DMRC’s Brief Scope: Design verification, Detail engineering, SITC of Electrical and Mechanical system, DG set, Environment control system, Tunnel ventilation system and Building Management System for 4 underground stations of line-10 of Phase-IV of Delhi MRTS.

ETA Wins Delhi Metro Silver Line’s E&M, ECS & TVS Contract DE-11
Silver Line’s route connecting Aerocity – Saket – Tughlakabad – view Delhi Metro Phase 4 route map and information

DMRC’s budgeted estimate remains unknown to me, so I can’t provide an assessment on the chances of a contract getting awarded. We’ll have to wait and watch to see how this plays out.

The line has another similar but larger system package (DE-11) that includes 7 underground and 4 elevated stations between Chhatarpur and Tughlakabad. Technical bid evaluation for that is currently underway since October 2022.

A list of all Delhi Metro Phase 4 packages, their contractors and status can be viewed here.

For more updates, check out the Delhi Metro section or my Home Page! Sign up for free instant email notifications on new posts over here. Like this post? Get early-access to updates and support the site over here.

– TMRG





Source link


SHARING HELPS OTHERS