Metros Tenders

KEC JV Wins Ahmedabad Metro Phase 2’s Track Work Contract

[ad_1]


Per an industry source, VNC – KEC – Emrail JV in June was declared as the lowest bidder to supply and install standard gauge rails for the Ahmedabad Metro Phase 2 project.

This new 28.254 km phase will see Ahmedabad’s north-south Red Line getting extended by 22.838 km from Motera Stadium to Mahatma Mandir via 20 new stations with a 5.416 km spur from GNLU to GIFT City which includes 2 new stations.

Gujarat Metro Rail Corporation (GMRC) had invited tenders for this systems contract in January 2022 financed by Agence Française de Développement (AFD) with an unknown estimate.

I don’t have bid values for all qualified bidders at this time, but hear Larsen & Toubro (L&T) was the 2nd lowest bidder. If someone has bid values, then leave a comment below or shoot me a message via the Contact page. I’d like to add it in here for record keeping.

Scope: Design, Supply, Installation, Testing and Commissioning of Ballastless track from Motera to Mahatma Mandir and GNLU to GIFT City in elevated section including connecting lines to Depot along with ballasted/ ballastless / embedded standard gauge track, Ahmedabad Metro Rail Project, Phase II

Indicative route from Motera Stadium to Mahatma Mandir & GIFT City – view Ahmedabad Metro Phase 2 info & route map

Currently 2 out of 3 civil packages of the Phase 2 project are under construction with both contractors commencing U-girder launching activity in Q4 2021:

Package Contractor
C1: Motera to GNLU (8.124 km) and GNLU to GIFT City (5.420 km) with 10 stations Afcons Infrastructure
C2: GNLU to Gandhinagar Sector-1 (6.478 km) with 5 stations Ranjit Buildcon
C3: Sector-1 to Mahatma Mandir (7.553 km) with 7 stations 10 Bids Received in May 2022

A list of all Phase 2 packages (consultant, civil, system) and their contractors can be viewed here.

For more updates, check out the Ahmedabad section or my Home Page! Sign up for free instant email notifications on new posts over here. Like this post? See how you can get early-access to updates and support the site over here.

– TMRG



[ad_2]

Source link