Metros Tenders

6 Bidders for Delhi Metro Phase 4’s Consultant Work

[ad_1]


6 consortia have submitted Expression of Interest (EOI) applications to provide consultancy services (contract DCS-1B) for implementing Delhi Metro’s Phase 4 project.

This 65.1 km project is well under construction and includes 1 new line (23.62 km Silver Line: Aerocity-Tughlakabad) and the extension of the Magenta Line (28.92 km Janakpuri West – R.K.Ashram) and Pink Line (12.58 km Mukundpur – Maujpur).

Delhi Metro Rail Corporation (DMRC) had invited bids for this service in May-end with an unknown estimate and 1620 day contractual period.

If someone is aware of all members in each consortia, then please drop a comment below or send me a message using the contact page.

Bidders (lead bidders only):

  • AYESA Ingenieria y Arquitectura, S.A.U
  • DB Engineering and Consulting GmbH
  • Egis Rail
  • MM S.p.A
  • Rina Consulting
  • SYSTRA

Update: Here’s an unconfirmed consortia list:

  • AYESA – BARSYL JV
  • DB Engineering and Consulting GmbH
  • Egis Rail – Padeco – Mott Macdonald JV
  • MM S.p.A – SMEC – Hill JV
  • Rina Consulting – TYPSA – Yuksel – Artelia JV
  • SYSTRA – Nippon Koei – OCG – RITES JV

Name of EOI: Short Listing of Consultants for Consultancy Services for implementation of Delhi MRTS Project Phase-IV

Silver Line’s route connecting Aerocity – Saket – Tughlakabad – view Delhi Metro Phase 4 route map and information

Details from the tender document:

Scope

The role of the Consultant is mainly advisory capacity to DMRC in various areas for successful commissioning of complete MRTS-IV Project.

  • Consultancy services shall be provided through expatriates and local experts. In certain areas, consultancy services shall be provided through local experts only.
  • Field of services shall be Project Planning, Programming and monitoring, Civil Engineering, Design & Structure, Quality assurance in construction, signalling, Telecommunication, Automatic Fare Collection System, Track, Ventilation, Air Conditioning, BMS, Rolling Stock and Safety, Health & Environment.
  • Entire consulting team shall be headed by a Team Leader. The general responsibility of Team Leader and Scope in other areas will be provided to the Shortlisted Consultants.

Method of Selection

  • Contract DCS-1B shall be Quality and Cost Based Selection (QCBS) wherein Quality Cost ratio shall be 80:20.
  • Financial proposals shall be opened of the consultants whose Technical Proposals are determined to be responsive to the key aspects of the RFP.
  • 80% weightage for technical score obtained and 20% weightage for financial score shall be taken for evaluation.

For more updates, check out the Delhi Metro section or my Home Page!

– TMRG



[ad_2]

Source link