National Capital Region Transport Corporation (NCRTC) last week invited bids for conducting geotechnical soil investigation work for a new alignment of the 164 km Delhi – Alwar RRTS (RapidX) line through Gurugram (Gurgaon).

This new semi high-speed line in its first phase (stage) was earlier going to connect Delhi’s Sarai Kale Khan with SNB (Shahjahanpur – Neemrana – Behrod) in Rajasthan. Per NCRTC’s tender document, the line its first phase will now instead terminate at Dharuhera within Haryana, covering a distance of 70.72 km with 13 stations.

The line was earlier going to pass through old Gurgaon with stations at Udyog Vihar, Gurgaon Sector 17 and Rajiv Chowk. It will now run along the national highway 48 (NH-48) with stations at Cyber City (underground), IFFCO Chowk (elevated), Rajiv Chowk (underground) and Hero Honda Chowk (underground).

The purpose of this geotechnical investigation contract is to study the soil’s profile along the line’s revised alignment between Aerocity and Kherki Daula and at the site of its train maintenance depot at Dharuhera.

The results will be included within the civil construction tender documents to help infrastructure companies make more informed financial bids and use appropriate machinery, methods & technology during construction.

  • Tender No: DA/GT/COR-OF/030
  • Duration: 180 Days
  • Bid Submission Deadline: February 2, 2024 at 3 PM
  • Bid Opening Date: February 3, 2024 at 3 PM

NCRTC’s Brief Scope: Detailed Geotechnical Investigation work for underground and elevated section on revised alignment between Aerocity to Kherkidaula and Dharuhera Depot of SKK (Sarai Kale Khan) – Dharuhera of Regional Rapid Transit System (RRTS) corridor.

Alignment of Delhi – SNB RRTS Line – view Delhi – Alwar RRTS information & full route map

I always felt NCRTC was missing a trick by skipping Cyber City and the eastern / newish parts of Gurgaon where a larger percentage of potential users can afford RapidX fares, so this realignment comes as a welcome change.

Per the tender document, 48.35 km of the line’s route falls in Haryana & 22.37 km in Delhi. While almost the entire route length in Delhi is underground, the route length in Haryana will mostly be elevated except 16.28 km underground.

In Haryana, the line will run elevated along NH-48 from Sector 25 to Rajiv Chowk, Kherki Daula to Manesar, and Panchgaon to Dharuhera. I’ve mapped the line’s indicative route and location of stations over here.

Here’s the revised list of stations on Delhi – Dharuhera RRTS line shared in the tender document (this table is best viewed on a Desktop):

Station Name Type Chainage Km)
Sarai Kale Khan Elevated (-)0.48
INA Underground 7.37
Munirka Underground 12.00
Aerocity Underground 17.58
Cyber City Underground 24.15
IFFCO Chowk Elevated 27.58
Rajiv Chowk Underground 32.72
Hero Honda Chowk Underground 35.15
Kherki Daula Underground 39.04
Manesar Underground 46.07
Panchgaon Elevated 52.84
Bilaspur Chowk Elevated 58.29
Dharuhera Elevated 70.00

This is NCRTC’s 5th geotechnical investigation contract for this line. Here’s a list of past contracts awarded, which I’ve covered on the Delhi – Alwar RRTS information page.

Geotechnical Scope Contractor
Sarai Kale Khan to IDPL Complex in Gurgaon CEG Test House and Research Centre Pvt Ltd.
Rajiv Chowk to Kherki Daula Shree Balalji Test House Pvt. Ltd.
IDPL Complex in Gurgaon to Dharuhera CEG Test House and Research Centre Pvt. Ltd.
Dharuhera to SNB RITES

Back in June 2022, SYSTRA – Egis Rail – Consulting Engineers Group JV emerged as the preferred bidder for this line’s General Consultant (GC) service. NCRTC has already engaged at least two Detailed Design Consultants (DDC) for the Haryana section – L&T Infrastructure Engineering Ltd. (IDPL Ramp to Rajiv Chowk) and SYSTRA – AECOM JV (Panchgaon to SNB and Dharuhera Depot)