Widening to 4 Lane & Paved Shoulder from km. 111.5 to 148.088 on NH 69(Old NH 206) Honnarar-chittoor Section in State of Karnataka on EPC Mode
https://www.engineeratsite.com/ |
https://www.engineeratsite.com/ |
https://www.engineeratsite.com/ |
Delhi Mumbai Expressway |
About The Project- Delhi-Vadodara Expressway Is Going To Be The Longest Expressway In India After Completion Of It’s Construction Work, It Will Connect To Mumbai The Commercial Capital Of India Also That’s Why It is Named As Delhi-Mumbai Expressway as well,
Foundation Stone Was Laid By Union Ministers Sushma Swaraj , Arun Jaitely And Nitin GadKari On 8th March 2019,
This Expressway Will Be Constructed In 8 Lanes With Median Separator As per NHAI Requirements, It Will Reduce The Travel Time Between Delhi To Mumbai By 24 Hours To 12 Hours,
Delhi-Mumbai Expressway Project Is Divided Into 34 Stretches ( Packages) For Construction To Reduce The Construction Time And Budget,
Mumbai Vadodara Expressway
Delhi Jaipur Expressway
Locations Of Project- Delhi-Vadodara Expressway Or Delhi-Mumbai Is Going Through The Major Backward Areas Of Delhi , Haryana , Rajsthan , Madhya Pradesh ,Gujrat And Maharastra,
Total Cost Of Project- The Estimated Construction Cost Of Delhi -Vadodara(Delhi -Vadodar-Mumbai) Expressway Project Is 90000 Crore,
Delhi-Vadodara Expressway Is being Constructed In Many Packages The Reduce Its Construction Time And To Minimize The cost, Package 22 Is The Part of Delhi – Vadodara Expressway,
Starting Point- Kandarwasa (Ratlam district)
End Point- Bawadi Village- Near Shivgarh (Ratlam district)
Total Length- 25 kilometers,
Total Cost- 1022 Crore,
Bid Submission Date- 29-01-2020,
Bid Opening Date- 08-05-2020,
All Companies Filled The Tender Form- Many Companies Has Shown It’s Interest For Construction Of Delhi-Vadodara Expressway, List Of Few Companies With There Bidding Amount Are As Below,
Delhi Vadodara Expressway Contractors ?,
Larsen and Toubro Limited- 993.007 Crore (L-1)
GHV- 999.22 Crore,
Ashoka- 1008 Crore,
JIANGXI- 1033.60 Crore,
Tata – 1047 Crore,
NCC- 1080 Crore,
GR Infra – 1087.77 Crore,
Dilip Buildcon -1120.05 Crore,
Sadbhav – 1152 crore,
Gayatri – 1172 Crore,
MonteCarlo – 1172.2 Crore,
DRA – 1377.41 Crore,
CREC- VARAHA JV- Disqualified,
GGHB- Disqualified,
Lowest Bidder Company- The Lowest Bidder Company For Delhi- Vadodara Expressway Pkg 22 Is Larsen And Toubro Limited, The Tender Value Filled By Larsen And Toubro Limited Is 993.007 Crore, Second Lowest Bidder For Pkg 22 Is GHV With 999.22 Crore Tender Value,
About The L-1 Company- Larsen And Toubro Limited Is An Indian Multinational Company, L&T Is One Of The Major Engineering , Construction, Technology ,Manufacturing , And Financial Services Conglomerate With Global operations , It Is Engaged Over 30 Countries Worldwide In Construction, Engineering , Manufacturing And Other Operations, It’s Revenue Is Over 21 billion USD,
Click Here For More Results,
Click Here For Current Govt Jobs