ASPHALT, ASPHALT CONCRETE, BITUMINOUS CONCRETE LAYERS
Bituminous Concrete layer |
ASPHALT, ASPHALT CONCRETE, BITUMINOUS CONCRETE LAYERS
What is ASPHALT CONCRETE ?:➤
What is the difference between bituminous concrete and asphalt?
What is BM and BC?
INTRODUCTION ➤
ACTIVITIES IN ASPHALT CONCRETE WORK ➤
What is DBM and BC?
What is BC layer in road construction?
MATERIALS IN ASPHALT CONCRETE ➤
PAVING OPERATION in ASPHALT CONCRETE ➤
CHECKS BEFORE PAVING(PRE-PAVING ACTIVITY)➱
➤Paver Level Sensor To be Set For Required Level Given Of String Wire Or Average Beams,
CHECKS DURING PAVING ➱
➤Total Area Should Be covered With Tack Coat,
➤Start The Unloading Of the Truck into the paver, After checking The Temperature Of Mix,
➤Loose Thickness Should Be Checked With a Thickness Gauge Regularly in some Interval of Time, and Length,
➤Check The Camber with line rope, taper.
➤If any Segregated area is Found spread the fines with shovels prior to rolling,
➤Check for Rolling Should Be done As per the Rolling pattern,
SURFACE FINISH ➤
➤The tolerance in level should be in between +/- 6 mm,
➤The Core Density should be 92 % of Lab GMM.
➤Road Unevenness index shall be less than 2000 mm per kilometre for road works,
➤The Mix Binder Content shall be +/- .3% of Designed OBC,
➤Surface Regularity DBM, BC shall be +/- 6 mm , +/- 3 mm,
TRANSVERSE JOINT MATCHING➤
LONGITUDINAL JOINTS MATCHING➤
PLANT OPERATIONS For ASPHALT CONCRETE➤
CHECKS DURING PRODUCTION➤
➤Maintain The Bitumen Temperature at 150 degrees Celsius,
➤Maintain the aggregate Temperature at 160 to 170 degree Celsius,
➤Ensure The Mix temperature should be Between 140 to 150 degree Celsius,
➤Clean the Vehicles Neatly,
➤Load The mix onto Trucks and Cover it with Tarpaulins and Haul to site,
➤ Check The temperature at plant, and site and record it,
ROLLING PATTERN➤
➱The Rolling process should start 12 to 15 inches from the lower unsupported edge as the un-compacted edge provides the initial confinement during the first pass, thus minimizing lateral movement of the mix. ⇩
➱Succeeding pass should move to the edge once the central portion of the spread is compacted to some degree because the mix will support the roller and allow the edge to be compacted without lateral movement,
REQUIRED MACHINES For ASPHALT CONCRETE➤
Some important machines are required for the Laying of Asphalt concrete, Bituminous Concrete Layer ,
1➮Paver machine
Paver machine |
2➮Tendem Rollers
Tandem Roller |
3➮Pneumatic Tyre Rollers
PNEUMATIC TYRE ROLLER➤
What is a pneumatic tyre roller?
➤The Pneumatic tyre roller(PTR) is tire mounted roller with having smooth tyre surface,
➤It’s Weight can be adjusted according to the requirement(Generally 16 to 18 mt for bituminous layers rolling is used),
➤It is used for Compaction and kneading action,
➤Longitudinal movement of the mix doesn’t take place unless the dia. is very low,
➤Horizontal forces are minimized with the use of larger diameters.
➤The movement of the mix under the tyre tends to be lateral,
➤The humps created during breakdown are of no significance and can be cleared in subsequent passes,
➤Under normal conditions, when the roller is on top of a firm mat it has no horizontal thrust as the tire flattens on the bottom which permits a 100 % vertical force,
PTR |
CONDITIONS FOR PNEUMATIC TYRE ROLLERS TO BE EFFECTIVE➤
SUMMARY TABLE OF INFLUENCES OF COMPACTION➤
ITEMS | EFFECTS | CORRECTIONS |
AGGREGATE
|
||
➮Smooth Surfaced
➮Rough Surfaced ➮Absorptive |
➮Low inter-particle friction
➮High inter-particle friction |
➮Use light rollers, Low mix Temperature, ➮Use Heavy Rollers ➮Use Sound Aggregates, Use pneumatic rollers, ➮Increase asphalt in mix |
ASPHALT
|
||
Viscosity
|
||
➮High
➮Low |
➮Particles Movement Restricted ➮Particles moves easily during compaction |
➮Use heavy rollers, Increase temperature, ➮Use light rollers |
QUALITY
|
||
➮High
➮Low |
➮Unstable and plastic under roller ➮Reduce Lubrication – difficult compaction |
➮Decrease asphalt in mix
➮Increase asphalt in mix,Use heavy rollers |
MIX
|
||
➮Excess Coarse aggregate
➮Over-sanded ➮Too much filler ➮Too light filler |
➮Harsh mix – difficult to compact ➮Too workable – difficult to compact ➮Stiffens Mix-difficult to compact ➮Low cohesion – mix may come apart |
➮Reduce coarse aggregate,Use heavy rollers ➮Reduce sand in mix,Use light rollers, ➮Reduce filler in mix,Use heavy rollers ➮Increase filler in mix |
MIX TEMPERATURE
|
||
➮High
➮Low |
➮Difficult to compact-mix lacks cohesion ➮Difficult to compact-mix to stiff |
➮Decrease mixing temperature ➮Increase mixing temperature |
COURSE THICKNESS
|
||
➮Thick lifts
➮Thin lifts |
➮Hold heat – more time to compact ➮Lose heat – Less time to compact |
➮Roll normally
➮Roll before mix cools, Increase mix temperature |
WEATHER CONDITIONS
|
||
➮Low air temperature ➮Low surface temperature ➮Wind |
➮Cools mix rapidly ➮Cools mix rapidly ➮Cools mix-crusts surface |
➮Roll before mix cools ➮Increase mix temperature ➮Increase lift thickness |