SSC JE CIVIL Previous Year Question Paper 2024 Exam Date 05/06/2024 Morning Shift general

SSC JE CIVIL Previous Year Question Paper 2024 exciting Quiz for Exam Date 05/06/2024 Morning Shift general

Dear Aspirants of Government Jobs for Junior Engineer and Assistant Engineer, here is the Detailed Quiz or mock Test for SSC JE CIVIL Previous Year Question Paper 2024 Exam Date 05/06/2024 Morning Shift, general, Paper 1 technical and Non Technical.

How to attend the Quiz/MCQ for the SSC JE Civil Previous Year Question Paper

If you want to test your preparation, here is the Quiz, well structured with a timer, it contains Non-technical as well as Technical questions. There are 200 questions, and the time is 2 hours according to the syllabus and exam pattern. Let’s start the Quiz. Here is the Link below

You can get Updates about SSC Vacancies and the Exam from the Official website

For Engineering Jobs, click here

Graduate Engineer Trainee Jobs in Noida 2025: BSL Scaffolding Hiring Freshers

Graduate Engineer Trainee Jobs in Noida 2025: Exciting BSL Scaffolding Hiring Freshers

Graduate Engineer Trainee Jobs with BSL Scaffolding Ltd.

Are you a fresher with a BE / B.Tech in Mechanical or Civil Engineering looking for a graduate engineer trainee jobs in Noida? BSL Scaffolding Ltd. is hiring energetic and driven Graduate Engineer Trainees for a dynamic techno-commercial role! If you’ve got strong communication and technical skills, this is your chance to kickstart your career in Noida, Uttar Pradesh. Let’s dive into the details and see how you can apply today!

Job Opening: Graduate Engineer Trainee

Position Details

DetailDescription
PositionGraduate Engineer Trainee
EligibilityFreshers – BE / B.Tech in Mechanical or Civil Engineering
LocationNoida, Uttar Pradesh

Key Responsibilities

  • Techno-commercial role (Sales / Business Development)
  • Tender sourcing & proposal generation
  • Technical assessment, estimation & bid preparation
  • Offer generation
  • Handling qualification documentation
  • Coordination with plant for production
  • After-sales support & client servicing

Why Join BSL Scaffolding?

BSL Scaffolding Ltd. is a reputed name in the industry, offering freshers a fantastic opportunity to grow in a techno-commercial role. You’ll gain hands-on experience in sales, business development, and technical operations while working in Noida—a hub for career growth. If you’re ready to learn, contribute, and build a strong foundation for your engineering career, BSL Scaffolding is the place to start!

How to Apply

Ready to take the first step? Send your updated resume now:

  • Email: tanwar.ashutosh@bslscaffolding.com
  • Call/WhatsApp: +91 81830 99437
Tunnel Engineering Jobs in Mizoram 2025: TUMAS India HiringClick Here
Exciting Career Opportunities at MKC Infrastructure LtdClick Here
KEC International Ltd Exciting Jobs April 2025| For Engineer/Officer – SafetyClick Here
Service Engineer and Sales Jobs in Odisha 2025: Noble Enterprises HiringClick Here
Solar PV Engineer Jobs Pan India 2025: Zuvay Technologies HiringClick Here
Site Engineer Jobs in Fire Fighting Projects Pan India 2025: KBM Engineering HiringClick Here
Construction and Design Jobs in Goa, Vizag, Remote 2025: Saanvi Sri Architects HiringClick Here
Join Us on WhatsAppClick Here
Free Telegram ChannelClick Here
Join Us on Linked InClick Here
Join Us on FacebookClick Here
Follow Us On TwitterClick Here

Engineering Jobs in Signal, Telecom, Civil 2025: PEMS Engineering Hiring

Engineering Jobs in Signal, Telecom, Civil 2025: PEMS Engineering Hiring

Join PEMS Engineering Consultants

We’re hiring for various engineering roles at PEMS Engineering Consultants! Check out the open positions below:

Sector Expert (Signal)

DetailDescription
QualificationGraduate in Electronics/Electrical Engineering
Experience3 years in the construction industry (Graduate) or 6 years in the construction of signaling works (Diploma)

Site Engineer (Signal)

DetailDescription
QualificationGraduate or Diploma in Electrical/Electronic Engineering
Experience2 years in execution of signaling projects (Graduate) or 4 years with project management consultant experience (Diploma)

Site Engineer (Telecom)

DetailDescription
QualificationGraduate or Diploma in Electrical/Electronic Engineering
Experience2 years in telecom projects (Graduate) or 4 years with project management experience (Diploma)

Sector Expert (Design S&T)

DetailDescription
QualificationGraduate in Electronics/Electrical Engineering
Experience3 years in construction industry (Graduate) or 6 years in design/drawing of signal & telecom works (Diploma)

Site Engineer (Civil)

DetailDescription
QualificationGraduate or Diploma in Civil Engineering
Experience2 years in earth work/tower building projects (Graduate) or 4 years with project management consultant experience (Diploma)

Site Engineer (Electrical)

DetailDescription
QualificationGraduate or Diploma in Electrical/Electronic Engineering
Experience2 years in electrical works for building/sub-station (Graduate) or 4 years with maintenance experience (Diploma)

How to Apply

Ready to join us? Here’s how:

Atlast PMC Pvt Ltd Exciting Job 2025| For Diploma & Bachelor’s Engineering PassClick Here
Exciting Career Opportunities at MKC Infrastructure LtdClick Here
KEC International Ltd Exciting Jobs April 2025| For Engineer/Officer – SafetyClick Here
KMV Projects Ltd Exciting Jobs: Vacancy For Building ProjectsClick Here
Aparna Construction HiringClick Here
Ani Integrated Services Ltd Exciting Job| For Commercial & Institutional Construction ProjectsClick Here
Cabcon India Pvt Ltd: Exciting Recruitment Drive 2025 | For Graduate, Diploma and Degree – Civil & Electrical EngineerClick Here
Join Us on WhatsAppClick Here
Free Telegram ChannelClick Here
Join Us on Linked InClick Here
Join Us on FacebookClick Here
Follow Us On TwitterClick Here

Engineering Vacancies at M/S Kanhaiya Lal Agrawal 2025

Engineering Vacancies at M/S Kanhaiya Lal Agrawal

Current Engineering Vacancies at M/S Kanhaiya Lal Agrawal

PositionVacancyQualificationExperienceLocation
Sr. Billing & Planning Engineer1BE/B-Tech Civil12+ yearsJabalpur Site
Billing & Planning Engineer1BE/B-Tech Civil7+ yearsMungeli/Bilaspur
Highway Engineer2BE/B-Tech Civil5+ yearsNaya Raipur
Chief Surveyor1BE/Diploma Civil10+ yearsNaya Raipur
Mechanic3ITI/12th Pass8+ yearsRaipur/Balod/Kodagaon
Sr. Mechanical Engineer1Diploma Mechanical10+ yearsRaipur
Tender Engineer2BE/Diploma Civil7+ yearsRaipur
Store Officer3Any Graduate7+ yearsRaipur/Balod/Kodagaon
Computer Operator5Any Graduate2+ yearsRaipur

Key Details of Engineering Vacancies at M/S Kanhaiya Lal Agrawal

  • Locations: Raipur, Jabalpur, Mungeli, Bilaspur, Naya Raipur, Balod, Kodagaon
  • Salary: Industry-best packages (negotiable based on experience)
  • Benefits: Professional growth opportunities, stable projects

How to Apply for Engineering Vacancies at M/S Kanhaiya Lal Agrawal

Send your resume to: hrdklaraipur@gmail.com
Subject Line: “Application for [Position Name] – [Your Experience] years experience”

Important Notes

  • Mention the preferred location in your email
  • Attach relevant certificates with your application
  • Only shortlisted candidates will be contacted

Last Date: Applications are accepted until positions are filled

Exciting Job Opportunities at Hexatron Industries Limited! Click Here
Exciting Career Opportunities at MKC Infrastructure LtdClick Here
Exciting Career Opportunities at HG Infra Engineering Ltd.Click Here
Exciting Job Openings at ANI Integrated ServicesClick Here
Aparna Construction HiringClick Here
Exciting Career Opportunities at Keller: Apply Now PostionsClick Here
Career Opportunities at HN Safal For AhmedabadClick Here
Latest JobsClick Here
Free Telegram ChannelClick Here
Join Us on Linked InClick Here
Join Us on FacebookClick Here
Follow Us On TwitterClick Here

Adani Power is Hiring – Walk-in Recruitment Drive for Thermal Power Projects!

Adani Power Walk-in-Interview Details

Adani Power Exciting Opportunity – Walk-in Recruitment Drive for Thermal Power Projects!

Are you an experienced professional looking for a career in the power sector? Adani Power Limited, India’s leading energy company, is conducting a walk-in recruitment drive for Project Professionals in Thermal Power Plants. Suppose you have 4-15 years of experience in construction & project execution of subcritical & supercritical thermal power plants. In that case, this is your opportunity to work with one of the top power companies.

Walk-in-Interview Details

Date: 6th March 2025
Location: Varanasi, U.P.
Apply Before: 19th February 2025

Eligibility Criteria

Experience Required: 4-15 years in subcritical & supercritical thermal power plants
Minimum Qualification: B.E./B.Tech. (Regular) in:

Mechanical Engineering

Electrical Engineering

Civil Engineering

Instrumentation Engineering

Why Join Adani Power?

> Be part of India’s leading power generation company
> Work on high-impact thermal power projects
> Competitive salary, perks, and career growth
> A chance to contribute to India’s energy sector

How to Apply?

Adani Power (Scan To Apply)

Apply via QR Code before 19th February 2025 (Scan the code in the image above).

Do you know someone perfect for this role? Tag them or share this opportunity! Let’s power the future together!

Exciting Job Opportunities at Hexatron Industries Limited! Click Here
Exciting Career Opportunities at MKC Infrastructure LtdClick Here
Exciting Career Opportunities at HG Infra Engineering Ltd.Click Here
Exciting Job Openings at ANI Integrated ServicesClick Here
Aparna Construction HiringClick Here
Exciting Career Opportunities at Keller: Apply Now PostionsClick Here
Career Opportunities at HN Safal For AhmedabadClick Here
Latest JobsClick Here
Free Telegram ChannelClick Here
Join Us on Linked InClick Here
Join Us on FacebookClick Here
Follow Us On TwitterClick Here

Steel Weight Calculator for Construction

Steel Weight Calculator in Construction For Structures

Steel Weight Calculator in Construction For Structures Like Buildings Bridges, House

Hi, Here is an amazing Tool With this You Can Calculate the Weight of Steel In Construction easily, The Steel Weight Calculation is Easy to calculate with this tool, and the Quantity of Steel can Be Calculated After Putting the DATA From BBS (Bar Bending Schedule

Steel Weight Calculator

Steel Bar Weight Calculator

Here You Can Find More Useful tools For Calculating The Material Quantities in Construction Click here

Latest JobsClick Here
Free Telegram ChannelClick Here
Join Us on Linked InClick Here
Join Us on FacebookClick Here
Follow Us On TwitterClick Here

Aparna Construction Hiring For Experienced Engineering Proffessionals and Tranees

Aparna Construction Hiring January 2025

Aparna Construction Hiring For Experienced Engineering Professionals and Trainees

Aparna Construction Hiring January 2025
Aparna Construction Hiring January 2025

How To Apply

If You are Interested Then You Can Send your updated CV on The Below Mail ID

 Email Your Profile to: basanthihr@aparnaconstructions.com

Career Opportunity at Shapoorji Pallonji Construction CompanyClick Here
Exciting Career Opportunities at MKC Infrastructure LtdClick Here
Multiple Jobs at Raj Corporation Ltd. for Highway ProjectsClick Here
DP Jain and Company Infrastructure Pvt Ltd Job VacancyClick Here
ANI Integrated Services Limited HiringClick Here
Nikhil Group is Hiring Multiple PostionsClick Here
PERFECT ENGINEER AND RESOURCES PVT LTDClick Here
Latest JobsClick Here
Free Telegram ChannelClick Here
Join Us on Linked InClick Here
Join Us on FacebookClick Here
Company Official WebsiteClick Here

Samsung Galaxy S22 Ultra vs Samsung Galaxy S24 Ultra

Samsung Galaxy S22 Ultra vs Samsung Galaxy S24

Introduction

They both have different features and also in different price ranges we will discuss all these things in this post Samsung Galaxy S22 Ultra vs Samsung Galaxy S24 Ultra, after reading this full article you will be able to decide which phone is better for you so please read this full post I will keep it interesting for you guys.

Who should read this article?

If You are Looking For a New Phone with an Above average Price Range Then You Should Read the Full Article. After reading this article you will come to know which phone will be good for you and what are the features of both the phones and your hand you will also get to know many things.

Table of Contents


Overview of Both Models (Samsung Galaxy S22 Ultra vs Samsung Galaxy S24)

So here both the current phones are from one brand, If you talk about both, Samsung (Samsung Galaxy S22 Ultra vs Samsung Galaxy S24) has been okay for them till now, Galaxy S22 Ultra 5G was announced a few years back, maybe on February 09, 2022, and then the phone duo was officially launched as well, on 2022 February 25. While Samsung Galaxy S24 launch and release date is 18 January 2024 → 30 January 2024. Both phones are amazing.

Samsung Galaxy S22 Ultra 5G

Launched in February 2022, the Samsung Galaxy S22 Ultra 5G has gained a lot of popularity among mobile lovers around the world during its time and has acted a lot, this phone is both a Tablet and a Smartphone. It is also available with S Pen.

(Image Credit Samsung.com)


>6.8-inch Dynamic and AMOLED display and refresh rate is 120 Hz.

>Quad-camera setup led by a 108MP primary sensor.

>Exynos 2200 (global) or Snapdragon 8 Gen 1 (USA) chipset.

>5,000mAh battery with 45W fast charging.

Samsung Galaxy S24 Ultra

Galaxy S24 Ultra is the Samsung brand for the year 2024, with huge upgrades and all the phones that came this year 2024. The joy upgrades of this phone continue making it more interesting and improved than other phones such as:-

Samsung Galaxy S22 Ultra vs Samsung Galaxy S24
(Image Credit Samsung.com)

A new more efficient Snapdragon 8 Gen 3 processor.

>A more efficient Snapdragon 8 Gen 3 chip.

>200MP camera sensor with advanced AI-powered photography features.

>Brighter and more energy-efficient AMOLED display.

>Support for faster 65W charging and better battery optimization.

These upgrades promise a significant leap in performance, but are they worth the additional cost?

Specification Comparison (Samsung Galaxy S22 Ultra vs Samsung Galaxy S24)

A Side-by-Side Specification Table (Samsung Galaxy S22 Ultra vs Samsung Galaxy S24)

FeatureSamsung  Galaxy S22 Ultra 5G
Samsung Galaxy S24 Ultra
ProcessorExynos 2200 / Snapdragon 8 Gen 1Snapdragon 8 Gen 3
Display6.8″ AMOLED, 120Hz, QHD+ 6.8″AMOLED, 120Hz, brighter QHD+
Rear Camera108MP + 12MP + 10MP + 10MP200MP + 12MP + 10MP + 10MP
Battery5,000mAh, 45W charging5,000mAh, 65W charging
StorageUp to 1TBUp to 1TB
SoftwareAndroid 12 (upgradable)Android 14 with One UI 6.1
Weight (g)228 g / 229 g232g
Price Check Price on Amazon ClickCheck Price on Amazon Click

Design and Build Quality (Samsung Galaxy S22 Ultra vs Samsung Galaxy S24)

Samsung Galaxy S22 Ultra Design

The S22 Ultra 5G has a sleek glass-and-metal construction with curved edges and a large, sleek design that reminds of the Samsung Note series. It weighs 229 grams and its dimensions of 163.3 x 77.9 x 8.9 mm give it a premium, sturdy feel. Available in Phantom Black, Phantom White, Burgundy, and Green, it looks modern even in 2024.

Samsung Galaxy S24 Ultra Design

With sharp edges and narrow bezels, the Samsung Galaxy S24 Ultra has very appealing aesthetics. It weighs a bit less, at 228 grams, and comes in new colours — Graphite, Blue, and Beige. A more durable Armor Aluminum frame along with Gorilla Glass Victus 3 makes it less fragile, so it feels sturdier.

Samsung Galaxy S22 Ultra vs Samsung Galaxy S24
image credit Samsung.com


Display Quality (Samsung Galaxy S22 Ultra vs Samsung Galaxy S24)

When it comes to the display, Samsung has always been a market leader, and both the Phones Samsung Galaxy S22 Ultra vs Samsung Galaxy S24 Ultra show this expertise of Samsung on the Manufacturing Level.

Samsung Galaxy S22 Ultra Display

The Galaxy S22 Ultra 5g sports a 6.8-inch Dynamic AMOLED 2X display with a pixel resolution of 1440 x 3088 and a refresh potential of 120HZ. It provides beautiful visual quality with highly saturated colour and deep blacks, making it perfect for watching videos, gaming, and browsing. You’re also getting HDR10 support for better contrast and up to 1750 nits peak brightness making it usable outdoors.

Samsung Galaxy S22 Ultra vs Samsung Galaxy S24
image Credit Samsung.com

Samsung Galaxy S24 Ultra Display

Samsung S24 Ultra builds on this foundation with modern technology and features an advanced 6.8-inch AMOLED LTPO 3.0 display. While maintaining the same resolution and refresh rate across the screen, the new panel achieves a maximum brightness of 2500 nits, giving the phone no loss of brightness and full visibility even in broad daylight, what’s more, Samsung claims that this phone consumes minimum battery and energy even during maximum use.

Despite all these features, Vision Booster Pro is also included in the Samsung Galaxy Ultra S24.  Which is equipped with modern technology and powered by Artificial Intelligence.  The advantage of this technology is that the brightness and contrast of the display of S24 works according to the light of the surrounding environment.

Finally, if we talk about the results then S24 Ultra is ahead of S22 with better brightness and energy.  But even after this, I will write about both the phones, because both the phones give good and attractive visuals which the users like a lot.

Performance and Processing Power(Samsung Galaxy S22 Ultra vs Samsung Galaxy S24)

Performance is one of the main areas in which it becomes clear that generations differ from each other, and so it is with the Samsung Galaxy S22 Ultra vs Samsung Galaxy S24.

Samsung Galaxy S22 Ultra Performance

With the Exynos 2200 (global variant) or Snapdragon 8 Gen 1 (US variant) powering the show, the Galaxy S22 Ultra offers phenomenal performance for everyday tasks, gaming, and multitasking alike. However, the Exynos model can fall short of the Snapdragon version in demanding situations.

Given the up to 12GB RAM and UFS 3.1 storage on the S22 Ultra that maxed out with its major parts here, SoCs also give in to punishment in apps and games, and when newer chipsets come in, especially where the kick-oll is the chip.

Samsung Galaxy S24 Ultra Performance

The Snapdragon 8 Gen 3 processor powers the Galaxy S24 Ultra, a 3nm chip that offers much higher performance and improved power efficiency compared to the SoC in the S22 Ultra. Amp up that with LPDDR5X RAM and UFS 4.0 storage, and you’re looking at surreal performance, allowing for butter-smooth multitasking and gaming even in the most demanding of 3D titles like Genshin Impact or Call of Duty Mobile.

Benchmarks show up to a 20% boost in CPU performance and 25% in GPU efficiency for the S24 Ultra over its predecessor.

Samsung Galaxy S22 Ultra vs Samsung Galaxy S24
image credit samsung.com

Conclusion:- The S24 Ultra is the undisputed champion if you need the best of the best, particularly when it comes to gaming and performance-heavy tasks.

Camera Performance (Samsung Galaxy S22 Ultra vs Samsung Galaxy S24)

Samsung has an excellent camera system with its Ultra lineup, and this comparison shows it.

Rear Camera Comparison

The S22 Ultra boasts a primary sensor of 108MP along with 12MP ultrawide and two 10MP telephoto lenses with optical zoom at 3x and 10x. It takes sharp, vibrant pictures with very good detail, particularly in good light. Its Nightography tech makes it quite good for night photography as well.

However, the S24 Ultra brings a 200MP primary sensor into the mix for truly unparalleled detail and clarity. This helps to improve low-light photography further, as it helps to deliver cleaner and more vivid images in low-light conditions. The new telephoto lenses were also significantly improved in zoom quality, allowing more detail in images at high levels of magnification.

Front Camera Comparison

While both smartphones boast a 40MP front camera, the S24 Ultra adds AI-powered elements into the mix, delivering more lifelike selfies with proper skin tones.

Verdict: The camera on the S22 Ultra is still very capable if you’re a casual user. But if you’re a photography enthusiast, the improvements found in the S24 Ultra, especially in low-light, and zoom photography make it a better pick.

Battery Life and Charging Speed (Samsung Galaxy S22 Ultra vs Samsung Galaxy S24)

Samsung Galaxy S22 Ultra Battery

Battery life is respectable on the S22 Ultra, thanks to a 5,000mAh pack, which will get you through the day with moderate use. It can also handle 45W wired charging (though you have to buy that adapter separately), 15W wireless charging, and reverse wireless charging for accessories such as Galaxy Buds.

Samsung Galaxy S24 Ultra Battery

The S24 Ultra’s battery carries over the 5,000mAh capacity but adds 65W fast charging, so it gets fully charged in 30 minutes. Battery optimization is improved, which contributes to increased battery longevity and better power consumption.

Conclusion: The battery life for both phones is strong, though the S24 Ultra’s improvements in charging speed and optimization give it a slight edge.

Software and Updates (Samsung Galaxy S22 Ultra vs Samsung Galaxy S24)

Samsung Galaxy S22 Ultra Software

The S22 Ultra debuted with Android 12 and Samsung’s One UI 4.1, and has been regularly updated since. It runs Android 14 as of 2024, but you may see important updates become constrained as Samsung shifts attention to more recent devices.

Samsung Galaxy S24 Ultra Software

The S24 Ultra is powered by Android 14 and One UI 6.1 out-of-the-box with a cleaner UI, greater customization options, and enhancements for AI. Samsung offers four years of major upgrades and five years of security, so good software support for a long time.

Conclusion:- The S24 Ultra will provide better longevity with software updates, making it a more future-proof option.

Additional Features (Samsung Galaxy S22 Ultra vs Samsung Galaxy S24)

In particular, the Samsung Galaxy S22 Ultra and S24 Ultra come loaded with extra features that are sure to impress productivity fans, creative souls, and general tech lovers alike.

Samsung Galaxy S22 Ultra Features

S Pen Functionality:- The S22 Ultra reintroduced the S Pen to the Galaxy family for accurate writing and drawing with a 9ms latency. These were groundbreaking figures for fans of the Galaxy Note series.

IP68 water and dust resistance: Survive up to 1.5 meters of water for 30 minutes.

DeX Mode — desktop interface when paired with a monitor or television, great for productivity.

Reverse wireless charging: Enables users to charge other devices wirelessly by laying them on the rear of the phone.

Samsung Galaxy S24 Ultra Features

The S24 Ultra carries over the best features of the S22 Ultra but adds a few upgrades.

Improved S Pen:-The S24 Ultra’s S Pen gets Bluetooth 6.0 support. It enhances precision in controls and adds even more gesture controls.

Advanced Biometrics:- Equipped with the improved ultrasonic fingerprint scanner and face recognition for even faster and more secure unlock.

Satellite Connectivity:- Recent addition for emergencies, Now users can send SOS messages even when not in a mobile network range.

Enhanced DeX Mode:- Enables multi-window functionality wirelessly, providing users with seamless multitasking capabilities across multiple screens.

Conclusion:-  The S22 Ultra paved the way for features such as the introduction of the S Pen and this time the S24 Ultra improves on the initial experience with more advanced tools and modern connectivity options.

Pricing and Value for Money (Samsung Galaxy S22 Ultra vs Samsung Galaxy S24)

Samsung Galaxy S22 Ultra Pricing

The Galaxy S22 Ultra in base configuration launched for 63999 INR, but in 2024 you can find this phone at a much lower price. Now, you can get it for about 63999 INR(Check Actual Price On Amazon Click here), which is a friendlier flagship price.

You Can Check Actual Price On Amazon Click here

Samsung Galaxy S24 Ultra Pricing

Its flagship sibling, the Galaxy S24 Ultra, is brand new and begins at 121000 INR (Check Actual Price On Amazon Click here)  for the entry-level configuration. This price is quite precious and likely quite attractive for those who want these ambitious specs, but it might be better used for users who want future-proofing where possible.

You Can Check Actual Price On Amazon Click here

Conclusion:-  If you’re on a bit of a budget and still want a high-performance flagship phone, then the S22 Ultra has great value. But if you want the best that Samsung has to offer and you’re willing to fork out for it, the S24 Ultra is absolutely worth your spend.

Pros and Cons of Each Phone (Samsung Galaxy S22 Ultra vs Samsung Galaxy S24)

Samsung Galaxy S22 Ultra Pros and Cons

Pros:

>Gorgeous screen, and bright colours.

>Great camera system, especially for zoom shooting.

>Affordable pricing in 2024.

>Ideal for work with S Pen, DeX mode.

Cons:

>Outdated processor in comparison to newer flagships

>Lower charging speeds (45W instead of 65W on the S24 Ultra).

>Fewer future software upgrade guarantees.

Samsung Galaxy S24 Ultra Pros and Cons


Pros:

>Snapdragon 8 Gen 3 chipset which is an industry-leading.

>Most advanced 200MP camera with AI enhancements.

>Indeed, battery optimization and faster charging.

>Long-term software and security updates.

Cons:

>Higher price point.

>Progressive advancements for everyday users.

Final Verdict (Samsung Galaxy S22 Ultra vs Samsung Galaxy S24)

Both the Galaxy S22 Ultra and Galaxy S24 Ultra are stellar devices with their own merits.

Go with the Galaxy S22 Ultra if:

>You want a premium flagship, for less.

>You don’t necessarily need the latest hardware.

>Get the Galaxy S24 Ultra if:

>You want the latest and greatest performance, the best camera quality, and the features that are going to be relevant for years to come.

>You’re ready to shell out for the newest tech.

In the end, it’s up to your budget and your needs. If you care about price vs performance, the S22 Ultra is still a great choice right now in 2024. But if you’re a spec enthusiast or you want the best Samsung experience you can get, the S24 Ultra is an upgrade well worth making.

 FAQs (Frequently Asked Questions)

Should you upgrade to Samsung Galaxy S24 Ultra from S22 Ultra?

If you prioritize better performance, better cameras, and long-term software support, the `S24 Ultra’ is a good upgrade. The S22 Ultra is still overkill for most people, though.

Is the Galaxy S24 Ultra capable of faster charging than the S22 Ultra?

Yes, the S24 Ultra has 65W fast charging, as opposed to the 45W fast charging on the S22 Ultra.

Is the S22 Ultra good for gaming compared to the S24 Ultra?

Though the S22 Ultra exceeded expectations by firing up games, the Snapdragon 8 Gen 3 chipset in the S24 Ultra is better equipped to handle demanding titles, offering improved frame rates and power efficiency.

Which phone is more future-proof? (Samsung Galaxy S22 Ultra vs Samsung Galaxy S24)

For longevity, though, the Galaxy S24 Ultra wins out, thanks to its newer processor, higher potential software support, and long-term features such as satellite connectivity.

Conclusion (Samsung Galaxy S22 Ultra vs Samsung Galaxy S24)

Both the Samsung Galaxy S22 Ultra vs Samsung Galaxy S24 are strong performing in their aspects. Your choice will depend, of course, on your budget and your requirements — do you need an affordable buy with the S22 Ultra or cutting-edge innovation with the S24 Ultra?

You Can Read This Article also Click Here



















































New Job opportuinity For Civil Engineering and Safety Professionals at TECHNICAL ENTREPRENEUR AGILE MANAGEMENT Company (PMC) at Gujrat Location.

TECHNICAL ENTREPRENEUR AGILE MANAGEMENT(PMC) Company

TECHNICAL ENTREPRENEUR AGILE MANAGEMENT Company (PMC) is Hiring For Multiple Positions as Mentioned Below. For Building Projects. Job Location will be In Gujrat.

TECHNICAL ENTREPRENEUR AGILE MANAGEMENT Company (PMC)

Senior Project Manager

Qualification Required:- M. Tech / B.E. Civil

Experience Required:- 15+ years

Job Location:- Ahmedabad/ Gandhinagar

Remarks:-Responsible for overall Project management. major includes construction management, design management, cost management, planning and procurement and quality management.Soft skills – MS Office, AutoCAD, MSP and communication

Project Engineer Interior and Finishing Works

Qualification Required:- B.E. / Diploma Civil

Experience Required:- 5+ years

Job Location:- Ahmedabad

Remarks:- Civil finishing and interior work experience are preferable.

Project Coordinator at TECHNICAL ENTREPRENEUR AGILE MANAGEMENT Company (PMC)

Qualification Required:- M.Tech / B.E. Civil

Experience Required:- 8+ years

Job Location:- Head Office

Remarks:- Quantity take-off, scheduling in MS projects, and tendering experience is preferable.

Project Engineer For MEP

Qualification Required:- B.E. / Diploma Civil

Experience Required:- 5+ years

Job Location:- Ahmedabad

Remarks: Knowledge of shell and core, finishes, and execution MEP experience are preferred. Soft skills, such as MS Office, Autocad, MSP, and communication work experience, are also desirable.

Quality Engineer at TECHNICAL ENTREPRENEUR AGILE MANAGEMENT Company (PMC)

Qualification Required:- B.E. / Diploma Civil

Experience Required:- 5+ years

Job Location:- Ahmedabad/ Gandhinagar

Remarks: Responsible for attending/Monitoring/Conducting/Witnessing/Supervising all tests.QA/QC documents, closure of Non-conformance and site instruction. Soft skills – MS Office, Autocad, MSP and Communication and communication work experience, are also desirable.

Billing Engineer

Qualification Required:- B.E. / Diploma Civil

Experience Required:- 8+ years

Job Location:- Head Office

Remarks: Quantity Take Off, Bill checking and Procurement of Vendors

Safety Engineer

Qualification Required:- Diploma in Safety & EnvironmentManagement

Experience Required:- 8+ years

Job Location:- Ahmedabad/ Gandhinagar

Remarks: Responsible for ensuring the safety of workers and occupants during the design. construction, and use of a structure.identifying potential hazards and developing strategies to reduce them.

Supervisor

Qualification Required:- ITI Graduate / B. Com

Experience Required:- 5+ years

Job Location:- Ahmedabad/ Gandhinagar

Remarks: Knowledge of site execution and quality checks at different stages of construction.

How to Apply at TECHNICAL ENTREPRENEUR AGILE MANAGEMENT Company (PMC)

If You Are Interested in Fulfilling the Required Eligibility Criteria then You Can Send Your Updated Cv to The Below Mail ID of the TECHNICAL ENTREPRENEUR AGILE MANAGEMENT Company (PMC) Mentioning The Post For Which You Are Applying.

Apply nowMail Idscontact.teampmc@gmail.com ,   hrteampmc@gmail.com
Career Opportunity at Shapoorji Pallonji Construction CompanyClick Here
Exciting Career Opportunities at MKC Infrastructure LtdClick Here
Multiple Jobs at Raj Corporation Ltd. for Highway ProjectsClick Here
DP Jain and Company Infrastructure Pvt Ltd Job VacancyClick Here
Latest JobsClick Here
Free Telegram ChannelClick Here
Join Us on Linked InClick Here
Join Us on FacebookClick Here

Walk-in-Interview at Ducon Consultants Pvt Ltd For Structural Engineers, MEP Engineers, Architects and Draftsman for Building Projects

Ducon Consultants Pvt Ltd

Ducon Consultants Pvt Ltd is Hiring For Multiple Jobs For Its Building Projects, For Ahmedabad, Gujrat Location.

Walk-in-Interview at For Building Projects

Open Positions Ducon Consultants Pvt Ltd

Junior Structural Engineer

Experience Required:-  2-5 years

Structural Engineer 

 Experience Required:-3-5 years

Junior Structural Draftsman 

 Experience Required:-2-5 years

Structural Draftsman 

Experience Required:-5-10 years

MEP Engineer 

Experience Required:-5-10 years

Senior Architect 

Experience Required:-7-10 years

Senior Project Manager 

Experience Required:-10+ years in Industrial Design

How To Apply

Interested candidates send your resume to media.duconconsultants@gmail.com

Date and Interview Location

4th January 2025

10:00 AM – 6:00 PM

Ducon Consultants Pvt Ltd A3 – A4, Third floor, Safal Profitaire, Corporate Road, Prahlad Nagar, Ahmedabad, Gujarat 380015

Latest JobsClick Here
Free Telegram ChannelClick Here
Join Us on Linked InClick Here
Join Us on FacebookClick Here

Career Opportunity at Shapoorji Pallonji Construction Company January 2024 || Hiring For Project Incharges, Planning and Billing Engineers, For North India Locations

Career Opportunity at Shapoorji Pallonji Construction Company January 2024

We at Shapoorji Pallonji Construction Company are looking for qualified, experienced, target-conscious, and result-oriented construction professionals for our ongoing and upcoming projects across Northern India.

Career Opportunity at Shapoorji Pallonji Construction Company January 2024

We are seeking qualified and experienced professionals from the construction industry, specializing in:- 

👉High-Rise Residential & Commercial Buildings

👉Institutional Buildings

👉Industrial Construction Projects

Project Incharges

Qualification:- B.E. / B. Tech(Civil)

Experience:- 15-25 years

Job Location:- Delhi NCR, Uttar Pradesh, Bihar, Jharkhand

Engineer / Sr. Engineer – Planning

Qualification:- B.E. / B. Tech (Civil), PGDCM(Preferred)

Experience:- 5-15 years

Job Location:- Delhi NCR, Uttar Pradesh, Bihar, Jharkhand

Engineer / Sr. Engineer – Billing

Qualification:- Diploma / B.E. / B.Tech (Civil)

Experience:- 5-10 years

Job Location:- Delhi NCR, Uttar Pradesh, Bihar, Jharkhand

Engineer / Sr. Engineer – Contract Administration

Qualification:- B.E. / B. Tech(Civil)

Experience:- 5-10 years

Job Location:- Delhi NCR, Uttar Pradesh, Bihar, Jharkhand

PositionQualificationExperienceRequiredLocation
Project InchargesB.E. / B. Tech(Civil)15-25 yearsDelhi NCR, Uttar Pradesh, Bihar, Jharkhand
Engineer / Sr.Engineer – PlanningB.E. / B. Tech (Civil), PGDCM(Preferred)5-15 yearsDelhi NCR, Uttar Pradesh, Bihar, Jharkhand
Engineer / Sr.Engineer – BillingDiploma / B.E. / B.Tech (Civil)5-10 yearsDelhi NCR, Uttar Pradesh, Bihar, Jharkhand
Engineer / Sr.Engineer – ContractAdministration
B.E. / B. Tech(Civil)
5-10 yearsDelhi NCR, Uttar Pradesh, Bihar, Jharkhand

How to Apply at Shapoorji Pallonji Construction Company

If You Are Eligible and Interested then You Can Send Your Updated CV To the Below Mentioned Email ID of Shapoorji Pallonji Construction Company

Send your CV to del.hrd@shapoorji.com

Email IDdel.hrd@shapoorji.com

Note: Only shortlisted candidates will be contacted for in-person interviews at Shapoorji Pallonji Construction Company

Interview Dates and Venue

Noida:- 9th Jan 2025

Gurgaon:- 11th Jan 2025

Remarks: Candidates should have worked with reputed construction contracting companies and be experienced in the construction of High-Rise Commercial and Residential Buildings, Institutional Buildings and Industrial construction projects. The candidates must be able to demonstrate core experience and capabilities in managing and delivering similar projects with stringent requirements of timelines, safety, quality, budget and compliance.

Latest JobsClick Here
Free Telegram ChannelClick Here
Join Us on Linked InClick Here
Join Us on FacebookClick Here

Exciting Career Opportunities at MKC Infrastructure Ltd Gujrat

MKC Infrastructure Ltd Gujrat

MKC Infrastructure Ltd Gujrat is excited to announce that our 𝐇𝐞𝐚𝐝 𝐎𝐟𝐟𝐢𝐜𝐞, 𝐆𝐚𝐧𝐝𝐡𝐢𝐧𝐚𝐠𝐚𝐫 is currently hiring for multiple positions, and we want you to be a part of our growing team!

𝐖𝐡𝐲 to  𝐂𝐡𝐨𝐨𝐬𝐞 MKC Infrastructure Ltd Gujrat

Here at MKC Infrastructure Ltd Gujrat, You will  Work with a leading company in infrastructure development and You will have access to professional growth and career advancement opportunities, You Will Be part of a dynamic, innovative team driving impactful projects that shape the future

 At MKC, we’re committed to excellence, and we’re looking for talented individuals to help us reach new heights. Whether you’re ready to take the next step in your career or know someone who is, we encourage you to apply or refer a qualified candidate today!

Position Details are as Below

👉Deputy Manager – Direct – Indirect Tax

👉Sr. IT Engineer (Audit)

👉Deputy Manager – Legal

👉Manager/Sr. Manager Project Audit (Store/Purchase)

👉Executive – Purchase

👉Engineer – P&M

👉Sr. Content Writer/Social Media Executive – IT

👉Sr. Executive – Store

👉Sr. Executive – Admin

𝐇𝐨𝐰 𝐭𝐨 𝐀𝐩𝐩𝐥𝐲 MKC Infrastructure Ltd Gujrat 

Send your resume to 𝐡𝐫𝐦𝐢𝐬@𝐦𝐤𝐜𝐢𝐧𝐟𝐫𝐚𝐬𝐭𝐫𝐮𝐜𝐭𝐮𝐫𝐞𝐥𝐭𝐝.𝐜𝐨𝐦 or share this opportunity with your network.

Email Id 𝐡𝐫𝐦𝐢𝐬@𝐦𝐤𝐜𝐢𝐧𝐟𝐫𝐚𝐬𝐭𝐫𝐮𝐜𝐭𝐮𝐫𝐞𝐥𝐭𝐝.𝐜𝐨𝐦
Latest JobsClick Here
Free Telegram ChannelClick Here
Join Us on Linked InClick Here
Join Us on FacebookClick Here

LN Malviya Infrastructure ltd Vacancy

LN Malviya Infrastructure Ltd Vacancy

LN Malviya Infrastructure Ltd Vacancy

LN Malviya Infrastructure Ltd Vacancy
LN Malviya Infrastructure Ltd Vacancy

Are you a talented and tenured engineer who dreams of the ultimate new job in 2024? Urgent Hiring for an L M Infrastructure Ltd. Dynamic Team We need hard-core professionals to immediately takeup the our mission of Expansion by filling up the following positions across Maharashtra. Make sure to join our upcoming infrastructure firm and benefit from the early hiring if you are qualified for it!

Open Positions:

1. Junior Engineer (Civil)

Vacancies: 3

Address: Karad, Dist-Satara, Maharashtra

Role: The Junior Civil Engineer plays a crucial role, overseeing construction projects which involves monitoring site operations and making sure that procedures are being executed effectively to fulfil the client’s quality requirements.

2. Junior Engineer (Pipeline)

Vacancies: 3

Place: Karad, Dist-Satara,Maharashtra

Role Overview: The Junior Pipeline Engineer will be responsible for the execution of new and existing pipeline projects to facilitate project schedules, reduce DSO,and meet industry standards.

3. Civil Engineer

Vacancies: 2

Job Location: Nagpur Office, Maharashtra

Job Purpose: The Civil Engineer will work as sports director from the NAGPUR Office. Perform site visits (primarily in the Atlanta, GA area) of production homes and verify compliance with builder construction specifications

Salary:

Competitive & In Line with Industry Someone like L M Infrastructure Ltd values its employees and also pays them as per industry benchmarks.

How to Apply:

All interested candidates should send their updated CVs to the email below Be sure to also emphasize your relevant experience and qualifications on that stand-out application.

Email: Iminfra26@gmail.com

Hurry Up, This is Immediate Hiring. Apply Fast To Secure Your Place This is your chance to take you career on the leading infrastructure company!

Why Choose L M Infrastructure Ltd?

LM Infrastructure Ltd aims to achieve excellence in infrastructure. When you become a member of our team, not only do you join an exciting company with big ideas and ambitions but also one that invests in your career through training, and development plans. If you are passionate about civil engineering and up for a challenge that will also provide an enormous sense of reward, please apply today!

For More Updates Please Click here

Click here to visit the Company Website

8 BEST LAPTOPS FOR ENGINEERING STUDENTS

BEST LAPTOPS FOR ENGINEERING STUDENTS

8 BEST LAPTOPS FOR ENGINEERING STUDENTS

BEST LAPTOPS FOR ENGINEERING STUDENTS

It is hard to choose the best laptop for engineering students. Engineering students generally need extremely powerful software, heavily multitasking from various applications and academic computer capabilities to carry on the go. Those components are great, but there is a lot more to consider when looking for the best engineering laptop including display quality (since you will be staring at it all day) and durability so that your computer can easily withstand moving in or out of classes along with daily wear.

Okay, guys Today’s blog post is dedicated to the best laptops for engineering students in 2024, and we will further discuss this context with respect to its performance over power consumption at a low budget. If you are doing CAD modelling, coding, 3D simulation and the like. A perfect laptop can make your work easier and less hectic whether you are writing a program, or analyzing data. We will also look at trade-offs like graphics capability, and portability and focus on being budget-friendly so when you set out to buy a laptop it has the best bang for your buck without lacking in any feature required during your studies.

Because engineering students are frequently forced to strike a balance between their coursework, projects, and activities other than studies — at such times a faster-performing laptop would be necessary rather than a luxury. The top choices listed here will help you in making up your mind, and guaranteeing that whatever laptop model or brand at the end of this list is best capable for college-level challenges and provides convenience to employ it as a portable media player/enabler on optional days.

Laptop NameBrandRating By Amazon
(0 to 5)
Price
Cyborg 15 A12VE-071INMSI4.4 Check Price
(On Amazon)
ROG Zephyrus G14Asus5Check Price
(On Amazon)
Dell XPS 16 9640Dell4Check Price
(On Amazon)
Samsung Galaxy Book4Samsung4Check Price
(On Amazon)
Microsoft Surface Laptop 4Microsoft3.7Check Price
(On amazon)
AlienwareDell3.3Check Price
(On Amazon)

Dell XPS 9720
Dell5Check Price
(On amazon)
Thinkpad E14 Gen5Lenovo4Check Price
(On Amazon)
BEST LAPTOPS FOR ENGINEERING STUDENTS

1-MSI Cyborg 15

The MSI Cyborg 15 is one of the Best Laptops for Engineering Students. It is a powerful and affordable laptop designed for engineering students who need reliable performance without overspending, and overheating issues. It has specifications like a well-established combination of an Intel Core i7 processor and NVIDIA GeForce RTX 4050 GPU, It Makes it well reliable and supported to handle the most used and high Configurational Engineering Software like Autocad, Revit, Civil 3D, MS Projects, Primavera P6, MX road, and Rendering Softwares.

MSI Cyborg 15

MSi Cyborg 15 has a 15.6-inch Full HD Bigger Display. Its Clear Visuals and screen helps the Engineering Students work on Engineering Designs and Drawing of higher Resolution.

After all due to having Slim and Lightweight Built Up it is very Much Convenient to carry and Move, This Laptop also has a well-optimized Cooling System. It Ensures Consistent Performance During Long Working Hours on Large Projects. This Laptop may be the Better Choice For Engineering Students who are looking for high performance with Affordable price.

Specifications

DescriptionSpecifications
BrandMSI
Model NameCyborg 15 A12VE-071IN
Display15.6-inch FHD (1920×1080)
CPUIntel Core I5
GPUNVIDIA GeForce RTX 4050
RAM16 GB.
Storage512 GB
Weight1.98 kg
Processor Speed4.4 GHz
Product Dimensions‎35.9 x 25 x 2.3 cm; 1.98 kg
Operating SystemWindows 11 Home
Graphics Card Description‎Dedicated
Graphics Card Ram Size6 GB
Connectivity TypeWiFi
Lithium Battery Energy Content‎53.5 Watt Hours
BEST LAPTOPS FOR ENGINEERING STUDENTS

Why To Buy This Laptop:- 

1- Affordable Price

2- Slim and Lightweight Profile

3- bigger screen size

Why Not To Buy:-

1- Get Heated sooner

2- Less Repairing support in the local market

You Can Check Price On Amazon By Clicking Here

2-Asus ROG Zephyrus G14

The Asus ROG Zephyrus G14 may be one of the choices for Engineering Students, who are Searching for a Balanced Combination of Power and Portability. This Laptop is Known for its Compact Design and Attractive Look, This is Portable, and Easy to Carry and Move Around the Campus, Class and Office Area.

Asus ROG Zephyrus G14

This Laptop is Too Lightweight but It Doesn’t Affect the Performance of Laptops and Students Can Easily work on heavy-duty work and Engineering software.

What sets the Asus ROG Zephyrus G14 apart is its reliable longer and Efficient battery life, which is essential for long study sessions or projects. 

With an attractive display that delivers vibrant visuals, it enhances the user experience, making complex graphics and detailed designs more accessible. This laptop is particularly a Better Choice for students who need a dependable, stylish, and efficient device that handles multitasking Works Easily,

Specifications 

DescriptionSpecifications
BrandASUS
Model NameROG Zephyrus G14
Display14.0″ Full HD (1920×1080)
CPUAMD Ryzen 7
GPU‎NVIDIA GeForce GTX 1650
RAM4 GB.
Storage‎1 TB
Weight1.65 kg
Processor Speed3.2 GHz
Product Dimensions32.51 x 22.1 x 1.78 cm;
Operating System‎Windows 10 Home, Windows 10
Graphics Card Description‎Integrated, Dedicated
Graphics Card Ram Size4 GB
Connectivity TypeBluetooth, Wi-Fi
Lithium Battery Energy Content‎‎75 Watt Hours
BEST LAPTOPS FOR ENGINEERING STUDENTS

Why To Buy This Laptop:- 

1- Light Weight

2- Slim and Smaller in Size

3-  Typing Experience

4- Powerful performance

Why Not To Buy:-

1- Price Range is Higher

2- Smaller Screen Size

You Can Check Price On Amazon By Clicking Here

3- Dell XPS 16 9640

The Dell XPS 16 is an affordable choice for engineering students who need a powerful and stylish laptop. This Laptop is  Known for its stunning design and high-quality built-up, This Laptop Contains a Higher Configuration with top-tier performance, making it useful for handling intensive engineering Softworks and software. 

Dell XPS 16 9640

Its Slim and Lightweight Design makes it Professional As well as easy to Carry and Move Easily, 

One of the major Good Qualities of this Laptop is its Attractive display. The large screen and Display give excellent colour accuracy and Better resolution, making it a great option and Choice for students who work with detailed CAD designs and other Engineering Designs and Drawings, complex Calculations, or Heavy Graphic projects. It provides a comfortable viewing experience, reducing stress on the eyes during long hours of work or study.

Furthermore, the Dell XPS 16 Executes the multitasking works, allowing students to run multiple applications smoothly without any hangover or Delays. Its long-lasting battery ensures students are Active through full lectures, study sessions, and project work without constantly worrying about charging issues. Its Battery is able to Run the Laptop longer Than 10 hours in single Charge.

Specifications 

DescriptionSpecifications
BrandDell
Model NameDell XPS 16 9640
Display16.3″ UHD OLED
CPUCore i7
GPUNVIDIA GeForce RTX 4060
RAM32 GB.
Storage‎1 TB
Weight4.26 kg
Processor Speed4.8 GHz
Product Dimensions11.2 x 36.8 x 46.7 cm
Operating System‎Windows 11 Home
Graphics Card DescriptionDedicated
Graphics Card Ram Size8 GB
Connectivity TypeBluetooth,
Lithium Battery Energy Content‎99.5 Watt Hours
BEST LAPTOPS FOR ENGINEERING STUDENTS

Why To Buy This Laptop:- 

1- Heavy Works

2- Longer Hours of Battery Life

3- Speakers

4- Powerful performance

Why Not To Buy:-

1- Higher Price

2- Heavy in Weight

You Can Check Price On Amazon By Clicking Here

4-Samsung Galaxy Book 4 Ultra

The Samsung Galaxy Book 4 Ultra is the Summarized Better Option of Samsung’s Galaxy Book all Products Line, and that makes it the best Samsung laptop for engineering students because it has a small CPU and powerful and Highly Configured Nvidia GeForce RTX discrete laptop GPU.

Samsung Galaxy Book 4 Ultra

This is a Premium Choice for engineering students Because it has a balance of sleek design and impressive performance. Known for its lightweight and slim profile, the Galaxy Book 4 Ultra is a perfect option for students who need a portable and powerful laptop. Its attractive Design and Lightweight and smaller in size make it easy to carry between classes and study sessions, while still being durable enough to handle everyday use.

One of the most attractive features of the Galaxy Book 4 Ultra is its attractive display, providing clear and Seamless visuals. This is particularly beneficial for students who work on design projects or require precise visual output. The laptop’s screen makes reading diagrams, reviewing blueprints, and engaging in video tutorials a comfortable and immersive experience.

Specifications 

DescriptionSpecifications
BrandSamsung
Model NameSamsung Galaxy Book4
Display15.6″ Inch (39.6cm) Full HD, (1920 x 1080) Resolution
CPUCore i7
GPU‎Intel Iris Xe Graphics
RAM32 GB.
Storage‎512 GB SSD
Weight1.55 kg
Processor Speed5.4 GHz
Product Dimensions50.5 x 29.8 x 6.7 cm
Operating System‎Windows 11 Home
Graphics Card DescriptionIntegrated
Graphics Card Ram Size8 GB
Connectivity Type‎Bluetooth, Wi-Fi
Lithium Battery Energy Content‎54 Watt Hours
BEST LAPTOPS FOR ENGINEERING STUDENTS

Why To Buy This Laptop:- 

1- Light Weight

2- less Electricity Consumption

3- Smaller in Size

4- Attractive and Smooth Keyboard

Why Not To Buy:-

1- Higher Price range

2- Limites Graphics Performance

3- Software Compatibility Issue

You Can Check Price On Amazon By Clicking Here

5-Microsoft Surface Laptop 4

Microsoft Surface Laptop 4 is beautiful with its premium design and build, This is a very slim and lightweight laptop which makes it easy to carry around, making this one the best laptops for engineering students who have to lug their laptops from lecture hall to group study session all over campus. The Surface Laptop 4 has the type of comfortable and responsive keyboard you want for taking notes in classes or working on long-term assignments.

Microsoft Surface Laptop 4

The standout feature of the Surface Laptop 4 is its vibrant PixelSense touchscreen display with sharp visuals. It is great for reading those engineering spec sheets and even plotting out designs however with the Surface Pen (Sold Separately) It is featured with Great battery life too, throughout an entire day of class or studying without having to pull out that charger.

The device will come in different configurations, made with either AMD or Intel chips for students who want it tailored to their performance demands. It might not be as powerful as some of the top-end gaming laptops, but it offers a great combination of performance and portability that also happens to lend itself to most engineering software and tasks. Being closely integrated with Microsoft’s ecosystem can also provide productivity increases — both as a user creating documents or just from easier use of cloud-based tools.

Specifications 

DescriptionSpecifications
BrandMicrosoft
Model NameMicrosoft Surface Laptop 4
Display15 inch 2296 x 1664 PixelSense display
CPUAMD Ryzen™ 7
GPU‎AMD Radeon RX Vega 11 Graphics
RAM8 GB.
Storage256 GB SSD
Weight1.54 kg
Processor Speed2 GHz
Product Dimensions34 x 24.4 x 1.5 cm;
Operating System‎‎Windows 10 Home
Graphics Card Description‎Integrated
Graphics Card Ram Size8 GB
Connectivity Type‎Wi-Fi
Lithium Battery Energy Content‎‎2 Watt Hours
BEST LAPTOPS FOR ENGINEERING STUDENTS

Why To Buy This Laptop:- 

1- Light Weight

2- less Electricity Consumption

3- Smaller in Size

4- Attractive and Smooth Keyboard

Why Not To Buy:-

1- Higher Price range for Most of Students

2- Limites Graphics Performance

3- Software Compatibility Issue

4 -Storage Capacity

You Can Check Price On Amazon By Clicking Here

6- Dell Alienware m18

Dell Alienware M18 is a highly affordable laptop for people who also look for high performance alongside the portability factor. The Alienware M18 also features its hot and futuristic design language that sets it apart from competing designs which tend to get boring after some time. So, this laptop is suitable for engineering students who need high computing power to perform their college work like 3D modelling Simulations or any other resource-hogging software. The big 18-inch screen offers a generous and rich display that calls between open windows for splayed outperform areas.

Dell Alienware m18

In addition to the gaming performance, the Alienware M18 has a cooling system that helps keep it cool even after hours of intense gaming. It offers a pleasant typing experience. While it is one of the heavier laptops, being a desktop replacement model due to its size and components, this laptop can certainly hold up for what a serious engineer needs when they are investing in both time and money.

Specifications 

DescriptionSpecifications
BrandDell
Model NameAlienware
Display18.0″ QHD+ CompfortView
CPUCore i9
GPU‎NVIDIA GeForce RTX 4080
RAM32 GB.
Storage‎1 TB SSD
Weight3 kg
Processor Speed3.9GHz
Product Dimensions59.7 x 8.2 x 59.7 cm
Operating System‎‎‎Windows 11 Home
Graphics Card Description‎Dedicated
Graphics Card Ram Size12 GB
Connectivity Type‎‎Bluetooth, Wi-Fi
Lithium Battery Energy Content‎15 Watts
BEST LAPTOPS FOR ENGINEERING STUDENTS

Why To Buy This Laptop:- 

1- Light Weight

2- less Electricity Consumption

3- Smaller in Size

4- High configuration of Graphics

5- bigger screen

Why Not To Buy:-

1- Higher Price range for Most of Students

2- New Brand and reliability

3- Software Compatibility Issue

4 -Storage Capacity

You Can Check Price On Amazon By Clicking Here

7-Dell XPS 9730

This is Also One of the Best Laptops for Engineering Students who are Window Users and Looking for a Better Balance of Power, Battery and Portability.

Dell XPS 9730

This Laptop (Dell XPS 17) Has a stunning and Adjustable 4K UHD display with thin bezels and Display, It makes a better choice for Multitasking and Heavy Visual Work. With the latest Intel Core I7 processor and NVIDIA GeForce RTX 4060 GPU, It Can Easily work on engineering applications effortlessly, from 3D modelling to heavy Designing and Estimation Software.

Specifications

DescriptionSpecifications
BrandDell
Model NameDell XPS 9720
Display17 inches.(with ‎3840 x 2400 screen Resolution)
Nvidia.Intel Core Ultra 7(Core I7).
GPUNvidia .
RAM32GB.
Storage1TB SSD
Weight2.44 KG
Processor Speed5GHz
Product Dimensions48.6 x 14.4 x 48.6 cm; 2.44 kg
Operating SystemWindows 11 Home
Graphics Card Description‎Dedicated
Graphics Card Ram Size8 GB
Connectivity TypeWiFi
Lithium Battery Energy Content‎55 Watt Hours
BEST LAPTOPS FOR ENGINEERING STUDENTS

Why To Buy This Laptop:- 

1- 4k High-Resolution Screen

2- 17 inches(Bigger Display to work on Designing and other Softwares)

3- thinner size

Why Not To Buy:-

I think it’s more Costly and not Affordable for most students.

You Can Check Price On Amazon By Clicking Here

8- Lenovo ThinkPad E14

Lenovo ThinkPad E14: Best Budget-Friendly For Engineering Students The E14 is a Lenovo ThinkPad growing out of the company’s legendary line of business laptops, featuring durable construction and professional appearance. Students who are always on the go will appreciate that ThinkPad E14 is slim and light enough to carry across campus.

Lenovo ThinkPad E14

One of the strong points in favour of this ThinkPad E14 already started to appear here: its keyboard, designed for people who are going to spend a good number of hours writing code or preparing reports. The laptop also has excellent battery life, meaning you can study all day without having to worry about constantly finding a power outlet. It has a number of ports that allow it to be easily plugged into other devices, making this an excellent projection tool for several different projects. While it may lack the high-end graphics of a pricier machine, you still get solid – and more than ample – performance on most engineering tasks with ThinkPad E14.

Specifications

DescriptionSpecifications
BrandLenovo
Model NameThinkpad E14 Gen5
Display14-inch (35.56 cm) screen with (1920X1200) WUXGA IPS 300 Nits Antiglare Display
CPUCore i7
GPUIntel
RAM16 GB.
Storage1TB SSD
Weight1.41 KG
Processor Speed1.7 GHz
Product Dimensions‎44.7 x 30.4 x 7.9 cm
Operating SystemWindows 11 Home
Graphics Card Description‎‎Integrated
Graphics Card Ram SizeShared
Connectivity TypeWiFi
Lithium Battery Energy Content‎‎47 Watt Hours
BEST LAPTOPS FOR ENGINEERING STUDENTS

Why To Buy This Laptop:- 

1- Lightweight

2- Small thin Size to Carry 

3- Storage As compared to Ram and Price

Why Not To Buy:-

1- Smaller Display.

2- Slow Processor

You Can Check Price On Amazon By Clicking Here

For More Updates Please Click here

Career Opportunity For R&D Engineer

Career Opportunity For R&D Engineer

Exciting Career Opportunity For R&D Engineer 🎶

Are you passionate about creating cutting-edge audio products and love to innovate? If yes, then this is the perfect opportunity for you! We are looking for a dynamic and skilled R&D Engineer to join our team in Mumbai, where you will play a pivotal role in shaping the future of audio technology.

R&D Engineer Job

Roles and Responsibilities-

You will be Responsible For:-

1-Design, implement, and test innovative audio products, ensuring they meet the highest quality standards.

2-Work on refining and improving development processes to boost efficiency and innovation.

3-Collaborate with cross-functional teams to deliver superior audio technology solutions.

4-Generate and evaluate concepts for new technologies, pushing the boundaries of what’s possible.

5-Modify processes to enhance both output and quality, ensuring continuous improvement in production.

This role is not just about following the standard procedures. You’ll have the chance to lead innovation in a fast-paced environment, where every idea and improvement can lead to the next breakthrough in the audio industry!

Eligibility Criteria:-

>A B.E./B.Tech or Diploma in Electronics, with a strong foundation in analog and digital technology.

>4-5 years of R&D experience in the electronics industry (or 6-7 years if you have a Diploma).

>Excellent communication skills in English and the ability to work effectively under pressure.

If you’re someone who thrives in a challenging yet rewarding environment and is eager to develop and implement new technologies, this could be your next big move!

Salary Range:-

>Be a part of something bigger– Work on groundbreaking projects that will define the future of audio technology.

>Grow with us-Opportunities for professional development and growth.

>Competitive salary– We offer a salary package of up to 4-5 Lakhs.

How to Apply

We’re looking for candidates who are not only skilled but also passionate about innovation. If this sounds like you, don’t hesitate to reach out!

Send your resume to Maaz@Shamrockvalue.com and become a part of a team that’s shaping the future of audio technology!

For More Update Please Click here


Concrete cube Failure -Acceptance Criteria and Is Code

Concrete cube Failure -Acceptance Criteria and Is Code
Concrete Cubes

Concrete cube Failure

The Word “Concrete cube Failure” is too difficult to hear for a civil engineer and quality engineer at construction sites,

It is too difficult to get approval of any structure if the cube fails in strength test,

Many times the Concrete cube failure leads to the demolition of the Structure or Rework,

Rework is not profitable for any construction project.

What happens if a concrete cube fails?

Why do concrete cubes fail?

Concrete Cube Acceptance Criteria➱

Before going to acceptance standards immediately, we’ll go step-by-step in the direction of it,

In order that we will additionally be in a position to establish the basic causes and does concrete actually failed in the compressive strength check.

First, we ought to be properly privy to the right way to sampling and cube casting exercises,

If this goes fallacious your result would possibly point out knowledge that might be concluded.

Now you probably did the appropriate sampling and dice-casting exercise, let’s transfer to the testing half.

You know we did numbering on the Concrete cube and cube number one,2 &Three represents pattern number one, cube quantities 4,5&6 represent sample no 2 and so forth.

Why we numb and we should take cubes for testing in accordance with pattern?

In statistical evaluation and discovering root causes of failure, it helps quite a bit.

Concrete cube Failure -Acceptance Criteria and Is Code
Concrete cube failure

Acceptance Criteria

As per IS 456, the person’s cube strength shouldn’t have variation greater than + / – 15% of the common of the three cubes.

Why concrete cube test is carried out?

In case you get extra variation in any check end result, how one can find the basic explanation for it.

Say you’re testing Three cubes and the numbers written on it are in serial and represent a pattern.
Say you’ve got a cube numbered 4,5 & 6 – by numbers I can say it’s a pattern no 2 and brought after x cum of concrete.

If you’ve got Concrete cube numbers like 3,5&7 taken for testing – it gained’t characterizes a single pattern,

As a result it’s a mix of a number of patterns.

What is the concrete cube test?

Always do confirm cubes taken for testing at any age are from identical pattern.

Now you’ve got Concrete cubes which characterize single patterns and identical workmen who stuffed it.

What is quality of cement and how to check

Suppose you bought outcomes like 15, 20 and 25 mpa.

What it’ll point out – it’ll point out that, there may be a subject in cube casting and you may discard these outcomes simply.

So this will provide you with an influence to have higher Quality management as a result of you recognize the rationale of failure and the place to take motion.

Concrete cube Failure -Acceptance Criteria and Is Code
Concrete cube testing

One single pattern of three cubes cast by a single individual and numbered accurately,

Won’t ever present variation in outcomes and you’ll all the time get outcomes with lesser variation than +/- 15%.

When it’s greater than this, it signifies Concrete cube casting accomplished improperly otherwise you took pattern cubes incorrectly for testing.

Hope you’ll by no means see flowery outcomes like the above instance after implementing it and might catch the root causes of failure simply by eliminating the risk of cube sampling and casting challenge.

So transfer on to acceptance standards,

IS 456, specifies the acceptance standards for compressive in addition to flexure power.

As flexure is 0.7 of sq. root of compressive strength, it is very important get handed in compressive power outcomes.
When we do cube testing, we write its leads to cube check register with serial numbers, say 1 is xyz date concrete from abc location,

What are the Properties of Concrete

And 2 is different date concrete from the ghi location and so forth.

When we examine acceptance standards,

IS says the commonality of Four non-overlapping consecutive check outcomes shouldn’t be lower than fck + 0.85 x standard deviation Or fck + 3 mpa (whichever is greater) for grades of concrete M20 and above.

What is implied by Four non-overlapping consecutive checks – it means while you common out Four check outcomes for acceptance standards,

They need to not overlap in calculations.

Acceptable averages

1,2,3&4, 5,6,7 & 8 and so forth serial quantity smart outcomes ought to be common out.

If you do like averaging beneath

1,2,3&4

If you’ve got low outcomes at 6 and eight and in case you attempt to make averaging like 3,4,5 & 6 – then it overlaps to make you profit by tweaking,

This isn’t permissible and that means of Four non-overlapping consecutive check outcomes.

If you’ve got good high-quality management at concrete,

Then your standard deviation will likely be lower than 2 or barely extra.

In these instances, or in most instances relevant acceptance standards will likely be all the time like fck + Three mpa.

What is consistency test of cement

Sometimes there’s a risk that, in one of many check patterns,

You would possibly get decreased outcomes and which makes that group of Four non-overlapping consecutive check-end results not in a position to meet acceptance standards.

In that scenario, IS 456 additionally specifies that individual check pattern outcomes shouldn’t be lower than

fck – Three mpa for M20 and above grade concretes.

So you also need to examine these standards when a single pattern have decreased outcomes.

Each check outcome ought to meet fck + 3mpa standards as a way to guarantee no failure and detect the issues at the earliest.

Also, it is very important to observe failure patterns to get clues on what is perhaps fallacious or OK.

Please Go Through The Link (Click Here) For More Updates on civil engineering

Quality of Cement-How to check

Quality of Cement-How to check
Cement Bags

Quality of Cement-how to check when it’s obtained at Construction site?

Do you understand, when concrete fails, one of many offender could be the Quality Cement.

It is necessary to test the Quality of Cement when it’s obtained at web site to make sure no failure and stoppage in undertaking resulting from dangerous high quality of cement.
Cement is transported within the luggage and bulkers.

When Cement attain at web site, do test following in an effort to make sure the cement is of fine high quality or not.

Check for ISI mark on the cement bag (This tells model is commonplace and follows the steps to make sure product high quality.

And in such instances third celebration testing report will not be necessary.

However you could get finished third celebration take a look at if shopper calls for otherwise you wish to do)

Check the Cement manufacturing particulars printed on aspect of bag for week,

Month and 12 months of producing to know the quality of cement initially

When week 1 begin and on which day in calendar (Quality of cement)➱

Week 1 begins on the first Jan of yearly.
The day on 1st date will adopted as a begin of week.
Say on 1st Jan, its Tuesday then week additionally begins on each Tuesday.

After checking the manufacturing particulars, do test how a lot previous is cement.
It is recommendation to eat the cement inside three months from manufacturing.
Because nobody is aware of the circumstances the place cement is stocked by a provider / dealer.

Insist your organization to purchase cement instantly from producer,

This make sure you get contemporary cement and no alteration

or damages to cement resulting from storage provider / merchants place.

Printing of Manufacturing week on bag occurs after bag is loaded with cement on a conveyor by which luggage are despatched both for stacking or instantly in wagon (at firm nobody use iron hooks)
Printing is robotically finished,

So someday you could get luggage on which the manufacturing particulars will not be printed accurately (Such instances you must inform the producer about this,

And get the written affirmation from them through e mail earlier than accepting it.

This may even make sure the rectification in printing course of and different engineers will obtain luggage with clear print on luggage)

Also i want to let you know that instantly order luggage haven’t on the market or not for retail printed on it.

A bag having worth written on it’s produced for retail sale.

And also you would possibly get a really previous luggage should you order it by retailer.

Do not settle for the cement which is greater than a month previous (Ensure you set this level in buy order to keep away from dispute in future).

Check the load of cement bags At Random To Know the Reality➱

In India Cement business wont look after the standard of cement, as soon as it’s dispatched from their manufacturing unit.

Cement is transported to their storage yards throughout India, max by means of prepare.

On relieving cement at unload level at railway station, buggers begin taking part in with that cement baggage with iron hook.

No Quality man from that producer will object this damaging of packing by these unskilled labours.
No producer have energy to switch these native labours at every station.

They can change the design and substitute all baggage as an alternative of making an attempt to switch labour which is inconceivable.

As a Engineer all of us ought to write to all cement producer to do one thing in an effort to safeguard the dealing with of cement.

Coming again to the purpose, on account of improper dealing with

And puncturing of cement baggage at a number of location,

There’s a chance that cement in baggage wont weight precisely or above 50 Kg and individuals who makes use of customary as bag for doing their daily work will get extra failure.because the bag might not be bag or 50 Kg.

So you will need to confirm the bag weight is above or equal to 50 Kg to keep away from failure in concrete as some one would possibly use a bag weighting lower than 50Kg as a bag

And do concrete which change an entire lot arithmetic and chemistry of concrete produced.

Manufacturers are privy to these losses on account of dealing with, as an alternative of correcting it,

that they had elevated the amount of cement in every bag to make sure 50Kg is delivered in regular transport loss.

After verifying the freshness on cement we will additional examine it for engineering properties.

Quality of Cement-How to check
Stacking Plane of Cement 

Check the temperature of cement in packed bag Only➱

Sometimes chances are you’ll obtain a sizzling cement in bag,

It doesn’t imply that the hydration course of is began in it.

When cement is immediately loaded after manufacturing, it might be sizzling as much as 50 degree,

In such instances retailer cement for two to three days earlier than utilizing in an effort to permit it for cooling.

This occurs when order is greater than provide of cement.

If we use scorching cement false set might happen in concrete produced with it.

Which means concrete will turn into stiff after mixing it, to regain the plasticity, remixing needs to be performed.

Or mixing time of such concrete have to be elevated.

Check for Physical Properties Of Cement(To Know The Quality Of Cement)➱

Color of The cement➱

It relies upon totally on the colour of lime stone which is used to manufacturing of the identical

and the opposite efficiency enhancer components like flyash.

Cement in the direction of off-white shade doesn’t imply it’s unhealthy or have extra flyash or some other components (Example – AAC Cement – it have whitish lime stone,so shade is barely faint than gray shade)

Color of cement usually from shade of gray could also be darkish or could also be faint.

You ought to know why it’s faint or darkish (Ask your organization to rearrange go to to producer plant in an effort to perceive manufacturing higher.Such visits are prepare by producer freed from value on demand by the shoppers).

Smoothness➱

When you’re taking some cement in your fingers and rubbed it, it’s going to really feel silky easy as a consequence of fineness of cement.

If grinding will not be performed correctly, you’ll really feel the roughness in it.
If roughness noticed, test the fineness of cement.

What is Consistency test of Cement

Properties of Concrete it’s mix and types

Lumps in baggage➱

Lumps kinds in baggage as a consequence of lifeless weight on it referred to as as gentle lump which get breaks once we roll the bag.

Hard lumps – kinds as a consequence of to hydration of cement as a consequence of moisture contact

or direct contact in water throughout transport corresponding to rain water entered in bag.

if that is so cement needs to be rejected.

Contamination➱

Take handful of cement and throw it within the water, it ought to float for someday after which sink in water.

If its immediately sinking in water, it exhibits cement is modified after dispatch from plant

and should lead to failure (In such instances cubes needs to be casted and checked for 1 day power,

if it fails in it, cement needs to be rejected)

Consistency of Cement➱

It exhibits usually the water demand by cement, extra it demand larger the water cement ration goes and vice a versa.

In common normal consistency ranges between 27 to 34%

Older cement might present decrease water demand as a consequence of partly hydration of cement.

Also much less finer cement tends to much less water demand (coarser materials have much less floor space than finer materials).

Take the checks of Conistency of cement at 27 +/- 2 degree with relative humidity of 65 +/- 5% as per IS 4031 half 4.

No want to fret in case your lab will not be setup with such a precision,

You may nonetheless do a consistency take a look at and report the consequence as per your lab temperature

and confirm every consequence with outcomes obtained in earlier identical setting.

Compressive Strength Of Cement Cubes➱

A great engineer all the time do test for the compressive power of cement for every obtained batch of cement.

This guarantee no failure in actual work.

As the lab circumstances aren’t normal in case of many of the websites,

engineer can evaluate his outcomes with earlier outcomes of identical cement beneath identical situation.

Do ask to offer a normal lab set as much as your organization proprietor,

this will likely save an enormous losses at fraction of restore value.

Cement obtained in bulker➱

Loose cement dispatched in bulkers should not have the manufacturing particulars printed on it. You must confirm it by studying the main points supplied on dispatch challan.
Dispatch challan do point out the seals numbers that are printed on seals mounted at bulker openings after feeding cement in it.

Before opening the seals on all opening do confirm the numbers written on seal and challan are identical.

After verifying it do the identical course of which we use for inspecting bag cement.

Quality of Cement-How to check
Cement Transportation and feeding bulker

Preserving the pattern from every lot before Unloading➱

A Sample of cement as acquired must be protect in air tight bag or container with all particulars about that batch.

This may assist in fixing the dispute in future which can happen as a result of failure of concrete at undertaking

And in addition allow you to to blacklist the producer if he doesn’t settle for the failure.

Preserve pattern provides you with correct results of precise manufactured cement.

Failure in concrete might happen as a result of many potentialities equivalent to

Storage situation of cement at Construction site.
Batching situation for concrete.
Cube casting errors and so on.

Mistakes might occur at plant as a result of carelessness of any person (Chances are much less as a result of advance programs and automation at plants, however human could make errors too)

If you could have any query on it or if i had miss one thing please do reply i’ll right it.

This will assist engineers to do right checking of cement.

Please click here for more updates on engineering topics

STRUCTURAL ENGINEERING

STRUCTURAL ENGINEERING

 


STRUCTURAL ENGINEERING


Problem-Solving Through Creative Approach in Structural Engineering
Structural Damage Assessments

In forensics, the knowledge and experience of all of us of structures plays a key role to understand how  environmental events and weather, building usage and gravity can affect the life of a structural part or the whole structure.

Experience and knowledge of structural engineering has reflected and shown also to us how construction and installation defects, deferred maintenance and substandard materials can result in any loss or damage. 

What is structural engineering exactly?

Building defects and deficiencies become more evident after weather and environmental events, such as flooding, tornados, and hurricanes. For example, wooden structural parts that has been exposed to long-term or repeated moisture contact may be structurally damaged from rot, microbial growth, potentially resulting in failure during what would otherwise be considered a non-damaging event.

Every region of the United States has its own geographical and climatic distinctions. The expert professionals at Stephens Engineering are well informed of the unique variables in construction and structural stability in your specific region.

Our professionals are knowledgeable in the building practices and process that results in sound construction and can investigate and identify construction defects readily. From years of experience, we understand the complex factors that need to come together to achieve a sound structure. We are uniquely qualified to complete structural-related damage investigations.

What is the work of structural engineering?

What are the basic structural elements?

You must Read about The Salary of Engineer

Flood Damage Investigations

Flood damage is a serious problem…one that needs to be addressed quickly and accurately. The experts at Stephens Engineering are experienced in investigating various types of structural- and foundation-related damage due to flooding. Flood damage investigations typically involve observation and assessment of the various building components
(foundations, pilings, framing, roofing and claddings, and inundated materials) that may have been removed, displaced or structurally compromised by the flood event.
Whether the damage is solely flood related or we are deciphering between flood vs. wind damage, we are prepared to evaluate the root cause and timeline of the damage.

What are the 3 types of structures?

What are examples of structure?

Building construction and process

Structural Collapse Examinations

Whether due to design or construction deficiencies, extreme wind loads from tornados and hurricanes, storm surge, earthquakes, tree or vehicle impacts, soil movement, material defects, decay/corrosion, or maintenance deficiencies, the Stephens Engineering experts can determine the proximate cause of the structural failure or collapse.
We primarily focus on the cause and extent of the damage and provide repair recommendations, if necessary. Each report is illustrated with photographs. Our report will locate and describe the claimed and unclaimed damage on the property and articulate a precise opinion based solely on the discovered evidence and research.


Construction Defects

The International Risk Management Institute (IRMI) defines a construction defect as “a deficiency in the design or construction of a building or structure resulting from a failure to design or construct in a reasonably workmanlike manner, and/or in accordance with a buyer’s reasonable expectation.” Deficiencies can result from design errors and/or omissions, the installation of defective, damaged, and/or inferior products or materials, and/or substandard workmanship.
Construction defects can cause physical damage to people or property or financial losses in the form of loss of use or value and/or increased expenses.


Roofing Damage

Stephens Engineering performs roofing damage assessments on residential and commercial buildings for all types of roofing (asphalt shingles, modified bitumen, roll roofing, metal, clay and concrete tile, EPDM, TPO, built-up roofing, and more).
From low-sloped roofs to elevated high-pitched roofs, our engineers can identify the difference between weather-related damage (hail and wind), installation defects, animal or man-made damage, new vs. old damage, or age-related deterioration.

Real Estate Foundation Inspections

Stephens Engineering Consultants, Inc. provides commercial and residential foundation inspections and assessments. Having a foundation inspection by an experienced structural engineer with help you to understand the real causes behind the damage and provide recommendations for remediation.
We know that a foundation inspection needs to be completed with great care and attention. For this reason, our foundation inspection service goes beyond the common “Level A” offered by home inspectors. In addition to a thorough visual inspection of the structure and foundation, our “Level B” foundation inspection includes:
  • A thorough, detailed foundation assessment that is accompanied by a computer-generated sketch of your foundation;
  • Interior observations of your interior floor plan, walls, and other areas;
  • Exterior drainage and damage inspection;
  • Review of the exterior landscaping and vegetative growth as it pertains to foundation performance;
  • A clear conclusion of our findings that is supported by quality photographs;
  • Engineering recommendations, if necessary, to assist with decisions concerning the best course of action.

Soil Exploration – Types and purpose,Soil Investigation

Soil Exploration - Types and purpose,Soil Investigation

Definition of Soil Exploration➪

➱Collecting data from site or field, Testing in laboratory and investigation of the samples collected for the purpose of design, and construction and structures is called the soil Exploration.

➱Many aspects , choice of foundation, settlement analysis of soil, the bearing capacity of soil and all other properties depends on various engineering properties of soil.

 these properties are to be determined by some field as well as the laboratory test . So, the here in this post,we will discuss mainly on the field test those are conducted to determine these required properties.

Soil Exploration - Types and purpose,Soil Investigation

What is the purpose of soil exploration ?


What detailed exploration ?.

The primary objective of a soil exploration are-

➱Determination of the nature of the deposit of the soil, depth and the thickness of the each soil layer Strata,

  As we know that soil is a layered material . So, what is the thickness of each layer and at what depth it starts and end. all of  these the information are necessary for designing a foundation .

➱The Determination of the Engineering properties of the soil and rock strata that affects the performance of the structure.

➱Determination of the in-situ properties by performing field tests.

Soil Exploration - Types and purpose,Soil Investigation

You must read about The building Construction process and Materials

Soil Strata Required➱

Soil Profile➱

➱The thickness of layer, the soil identification, the starting and the end date of the each layer is also very much important.

 Index properties➱

➱water content, atterberg limit etc.

The strength and comprehensibility characteristics-

➱Friction angle(phi), compression index (Cc), OCR (Over Consolidated Ratio).

What is OCR➱

The over consolidated ratio- I have mentioned about the normally consolidated soil and the over consolidated soil . for the over consolidated soil this OCR value is taken as 1. Because in the normally consolidated soil, you have the present stress which is greater than the maximum past stress, which is soil is experienced .

So, here we assume that for the normally consolidated soil, this OCR value is 1, but for the over consolidated soil where the present stress is less than the stress,which the soil is already experienced , here this ratio is the past maximums experience stress of the soil divided by the present stress that we are applying .

 So, I have already discussed that how we can determine the maximum past effective overburden stress or maximum past stress, that soil is experienced by casagrande  method, we can get that value from e log p curve, and applying the Casagrande method we can determine what is PC . So, that PC is the past maximum effective overburden stress that this soil is experienced.

The ratio between the maximum past stress the soil is experienced and the present stress.

➱Others things (the water table depth),

What are the methods of soil exploration ?

The direct method – test pits➱

➱The test pits or trench are open type or Accessible open type of exploratory method,

➱The soil can be inspected in it’s natural condition.

So, we can Obtain the soil sample from the site itself and those samples we can use to determine the soil properties in the laboratory.

The soil samples can be brought to the laboratory and for determining the properties of the soil.

➱The test pits are suitable up to 3 meters depth(very small depth) and the cost of the this increases proportionally with depth.

➱When The depth of strange is increased, Providing lateral support is must that is why the cost of this is increases with the increase in depth.that is why this method is suitable for sample small depth only up to 3 meter,

What is bituminous layer or Asphalt layer 

Semi direct methods – boring➱

➱Boring we have to do, to collect the soil sample for a particular specific depth and those soil sample we use for our laboratory test to determine the soil properties. Sometimes these boring are also required to conduct the field test for a particular depth .

What are the different types of exploration ?.

➱The common methods of boring are

➮Augur boring,
➮wash boring,
➮rotary drilling
➮and percussion drilling .

What is Wet mix macadam layer 

 Auger boring ➱

➱This soil auger(a device) we use for the advancing of a borehole in construction of a bore hole in the ground, it will also use to collect the soil sample and those soil samples we use for the laboratory test.

➱Auger may be hand operated or powered even If it is the hand operated then we can use it for relatively small depth up to 3 to 5 meter. If it is a power driven, then we can use this method up to a greater depth up to 60 to 70 meter in case of continuous light auger. Boring can be done up to 60 to 70 meters if The augur is a power driven augur.

➱Auger boring is easy and useful in case of partially saturated sand silts and medium to steep cohesive soil.

Soil Exploration - Types and purpose,Soil Investigation
Soil Exploration - Types and purpose,Soil Investigation

What is Granular Sab base layer (GSB Layers)

Wash boring➱

➱wash boring is generally used below the ground water table for which the auger method is not useful or suitable.

➱This method may be used for all kind of soil except those mixed with gravel and boulder .

➱A casing pipe is pushed and driven into the soil with the help of drop weight;

Soil Exploration - Types and purpose,Soil Investigation

 Rotary drilling➱

➱This is can be used for sand clay and rock (unless this is badly fissured),

➱This is very fast method,

 ➱Even rock course may be obtained by using a suitable diamond  drill bits.

Soil Exploration - Types and purpose,Soil Investigation

Percussion drilling➱

➱This method cannot be used for loose sand and is slow if this process is low in plastic clay,

➱The formation gets badly disturbed by impact .

Soil Exploration - Types and purpose,Soil Investigation

What is Consistency test of Cement

For More Updates please visit The main site 

find more updates on civil engineering 

Building Construction – Process, components and materials

Building Construction - Process, components and materials

In this post, we will study Building Constructionstep-by-step process and  building components,

Building Construction - Process, components and materials

 

BUILDING CONSTRUCTION PROCESS

Building a construction step involved in any type of construction is not an easy task perhaps it requires lots of effort and investment for building construction requires lots of time and it is tedious work yet its result is a permanent asset for us therefore care should be taken in Building construction process before planning Building construction projects must consider important aspects like the purpose of construction, utility, financial proficiency the demand for work, etc.

Construction of residential building required following paperwork before the start of actual construction.

These steps are of pre-construction phase➱

➱To acquire lend or plot.
➱Preparation of drawings as per requirements of consumers.
➱Estimation of material cost, labor cost and contingencies.
➱Approval of drawings and estimates from client.
➱Approval of drawings from City Development Authority.
➱Start of construction work either through contractor or laborer hired on daily basis.
➱Marking of plot boundaries.
➱Cleaning of plot.
➱Preparation of site layout as per drawing.

 To acquire lend or plot For Building Construction➱ 

➱It is the most important step in building construction.
➱Search for the location for the building which is best suited for building construction purposes.
➱Be careful while selecting land which has all the desired facilities available nearby and should be free from all land related issues.
➱It is suggested that do prior data collection before buying land or plot either by doing research online or seek help from real estate agents or concerned persons regarding the effective cost of the same.

 To seek technical help In Building Construction

 After selection proper land for Building Construction take the help of a Well known architect to make available building designs and drawing and take his/her Suggestion.

An architect will prepare the plan as per  requirement of building ,number of flats shops, According to your requirements and budget.

Then the Architect will meet and consult with An Engineer to get the details of the reinforcements and other materials to be used.How deep the foundation is going to be, width of pillar etc.

Preparing estimate and budget➱

The construction of a building Consumes a big amount of material and money. after, planning and structural detailing completed these details are transferred to the building estimator.

The building estimator will estimate the material quantity quantity of different items of work, and prepare an abstract sheet that shows the cost of building construction. if financial resources are limited we need to seek pre-approval for loans in advance or else you may end up in a cash crunch situation.

Permission from authorities For Building Construction

This is important work to do after the project is ready to be executed for that we have to take permission from the local municipal body before you could go for the construction.

Following are the list of document project required before applying for permission this document may differ from state, to state but some are essential for every building construction work.

➱Land survey:➮ survey of the land has to be carried out with the help of an authorized land surveyor.
➱Soil test report of the land.
➱Land documents.
➱Architecture / elevation / sectional drawings.
➱Structural report.
➱Architect certificate of undertaking on record and certificate of the undertaking of civil engineer on record.

Approach a builder For Building Construction➱ 

A builder or contractor for Building Construction must be chosen carefully because it is a mature for securing building construction quality and timely construction of work.

Pre-investigation must be done about the builder before handing work in the contract document, all the work related details must be clearly stated.

The Layouts and works details along with methods of payments time, cost and scale should be covered,

All The terms and conditions of contract should be check deeply before finalizing the deal of contract.

You must Read The Details about Pile load test click here

Building construction steps 

During Building Construction steps:➯
➱Site preparation or leveling work.
➱Excavation and PPC.
➱Foundation.
➱Plinth beam or slab.
➱Superstructure column.
➱Brick masonry work.
➱The lintel over door window gaps.
➱Floor slab or roof structure.
➱Door window framing and fixations.
➱Electrical and plumbing.
➱Exterior finishing.
➱Terrace and roof finishing.
➱Internal finishes.
➱Woodwork and fixture fittings.

 Site preparation or leveling For Building Construction

The construction site must be cleaned before the work is executed. this work involves the removal of roots of trees, debris and leveling ground area,

Earth work ➱

Generally excavation is carried out for the construction of wall foundations excavation should be carried out as per the drawings defined lengths and widths. after excavation, layout the foundation and back fill the remaining excavated area around foundation with soil.

In Residential buildings the floor levels is kept higher than the natural ground levels, Soil will be filled up to floor l levels and compacted,

Building Construction - Process, components and materials
Building Construction - Process, components and materials

Excavation and PCC➱ 

Excavation of foundation of building will be done with help of machines as per dimensions and measurements available in the drawing.

After Excavation, The Excavated area will leveled as per requirement and PCC (Plain Cement Concrete) Layer will be Laid Before Fixing the Reinforcements,

Foundation➱

The Base of the building is supported in the Lower most part of the building which is “foundation”.And the Foundation is directly connected with The earth soil. a building is load transferred from the superstructure to the soil and needs to be extremely strong to handle the load.


When the PCC layer is laid , The reinforcement work for foundation is started, After reinforcement is fixed , the bottom level must be checked before concreting, and The Gap between the foundation will be filled with earth soil.

Concrete work in foundation in Building Construction

It is too much necessary to check the levels of foundation prior to concrete. level the foundation base to same level now pour the concrete as per drawing specifications. Normally the concrete of ratio 1 : 4 : 8 is used for foundation, sometimes it is even Used the ratio of  1:5:10 or 1 : 6 : 20.

Here 1 : 4: 8 means,

1 Part cement per cubic
4 Parts of sand per cubic
8 Parts of coarse aggregates,

Depth of foundation is generally 9″ to 18″ and in the maximum cases it is taken as 12″. The foundation width is equals to the depth of foundation.

Damp-proof course (D.P.C)➱ 

To protect walls from moisture, a layer of damp proof course material is laid down at floor level. i inch thick concrete layer is used. material of damp-proof course layer consists of concrete ratio 1 : 1.5 : 3 with a mixture of waterproof material 1 kilogram per bag.

Plinth beam and slab:➮

After the foundation work is done ground beam form-work preparation is started and poured with concrete.over the plinth beam, masonry work is started.

Superstructure -column:➮

The superstructure is the portion above the plinth level of the building the main component of the superstructure is a column and beam.

Brick masonry work InBuilding Construction

➱ 

After Column and beam frame work is complete, Masonry works will be started with defferent materials like bricks, concrete ,blocks fly ash bricks etc. As per building drawing.

➱Masonry work is done using a cement mortar mix.
➱It is a mixture of cement and sand.

➱Masonry work is carried out with cement mortar.
➱Cement mortar is a mixture of cement and sand.
➱Ratio of cement mortar varies from 1 : 4 to 1 : 6 here 1 : 6 mean one part cement and 6 part of sand.
➱Dampen about 25 bricks with a hose pipe and clean away all loose dirt from the top of footing and moisten about a meter of surface at one end of the foundation with the hose pipe.
➱Throw a Matar line just behind the threaded level line and lay bricks on the mortar bed.
➱Make sure bricks exactly follow the threaded horizontal level line.

The lintel/door window gaps➱

➱The lintel is constructed on the door and window to support the masonry work over it . after this further masonry work is done.
➱Masonry work of buildings is carried out in one go till roof.
➱Openings for windows and doors are left during masonry Works.
➱Reinforced cement concrete beams are laid down on the top of openings so those loads of structure above openings not directly come on to the door frames.

Roofing➱ 

Roof slab of building is poured after completion of masonry Works nowadays roofing is of reinforced cement concrete slab.

Slab thickness and reinforcement details should be according to approved drawings.

Floor slab or roof structure in Building Construction➱ 

Then the form-work is started to construct slab resting on the column and beam. over slab form-work, slab reinforcement is placed as per slab detailed drawing.

Door window framing and fixations➱ 

After that door window frames are fixed at their specified position given in drawing.

Doors and windows➱

Traditionally, doors and windows of woods are used but steel and aluminum is also not a bad choice.

In case of wooden doors and windows, frames are fixed in walls during masonry work. panels are then fixed with hinges after plaster work.

Electrical and plumbing in Building Construction➱ 

Electrical and plumbings are fixed in the walls and slabs in such a way that they are concealed and not visible. after the finishing work is done. the point and pipe and left out such that later they can be finished with the electric fitting and plumbing fixtures.

Exterior finishing➱ 

Once this work is completed external plastering and finishing work is started waterproofing is also done to prevent rising dampness in the wall external cladding can also be done to enhance the elevation of the house.

Plastering and pointing:➱ 

Form-work will be  removed only after 14 days of casting of slab After removing Form work plaster work will be started, mortar for plaster work is normally of 1:3 or 1:4 to be used, thickness of plaster layers should not be greater than 0.75 inch cure the surface about 7 days so that plaster gain proper strength.

Terrace and roof finishing in Building Construction➱ 

On top of the slab waterproofing is done to prevent any leakage in the slab. generally, terrazzo tiling is done to prevent the slab from a weathering effect.

Internal finishing➱ 

Internal walls are plaster with smooth finish and flooring is done with tiles later on the walls are painted or textured.

Woodwork and fixture fittings➱ 

After completing the above work the furniture work will be started. side by side electrical fitting, switchboard, and plumbing fittings are complete in the bathrooms and kitchen areas too.

The final and the last process ofBuilding Construction is interior decoration work. Proper furnishing and fabric is used to complete the Building Construction.  

Services➱ 

There different types of services which provide are as following-

➱These are electricity supply, gas supply, water supply, sanitary etc Conduit’s for electric supply are fixed in walls before plastering.

➱Similarly water supply and sanitary lines are also laid before pouring of building floor note that gas lines are not fixed in walls or slabs.

➱Gas line remains open in air.

Structural components of the building and their standard dimensions➱ 

The structural components or essential elements of any building. without this structural building not able to stand and sustain its position on the ground. These components systems provide strength, stability, support and durability guarantee in structural component systems.

What is High performance concrete click to know

Following his list of building components➱ 

➮Foundation
➮Plingth
➮Earth filling
➮DPC(damp-proof course)
➮Flooring
➮Walls
➮RCC column
➮Sill level
➮Lintel
➮Ceiling
➮Chhajjas
➮RCC beam
➮Roof or slab
➮Doors
➮Windows
➮Parapet walls
➮Waterproofing on terrace
➮Coping

Building Construction - Process, components and materials

Structural components of building➱ 

Foundation➯ 

A foundation is the lowest part of building structure rested on soil below ground level. all loads of building transferred to foundation through beam and column arrangement. its main function is to distribute the load evenly and safely to the ground.

In frame structure, footings are generally used as the foundation to support the structural load of the building.

Building Construction - Process, components and materials

Following our various types of foundations and footings used in Building Construction: 

Shallow foundation➯ 

➮Individual footing or isolated footing
➮Combined footing
➮Strip foundation
➮Raft or mat foundation

Deep foundation➱ 

➮Pile foundation
➮Drilled shafts or caissons

Standard dimensions:➱ 

Foundation size depth totally depends on the structural and site ground condition so there are no standard dimension commendations for it.

But for small structures like rowhouses depth of the foundation should be at least 1.5 m from ground level.

Plinth level➱ 

The plinth level or plinth is the offset created between ground level and the superstructure of the ding. it is made by constructing a brick wall from ground level to the ring level of the building.

Its main function is to prevent the entry of moisture from the surface to the building superstructure.

Standard dimensions➱

Plinth height of any building must be at least 45 centimetres from the ground level.

What is Standard Proctor compaction test of soil 

Earth filling➱ 

An earth filling or soil filling is done between the plinth wall. it is essential to fill the open space left between the ground level to the plinth level earth filling must be very well compacted. so that the flooring gets sufficient hard surface base.

Standard dimensions➱ 

Earth must be filled to the top of the plinth level different materials can utilize as Earth fill like soil, coarse aggregate, waste materials brickbat etc.

DPC(Damp-proof course)➱ 

DPC is a lighter of waterproofing materials such as asphalt or waterproof cement at the plinth level the superstructure walls are constructed above the DPC layer so that no dampness rises from the ground surface into the walls.

In sort, DPC present the rise of water to superstructure if dampness rises in the wall of the superstore it reduces the strength of the walls and creates unhealthy living conditions. also it created defects in paint and plaster and ultimately increase maintenance cost.

In the case of plinth beams are provided above ground level DPC is not required because plinth beam itself performs as a DPC layer to restrict the entry of dampness.

Building Construction - Process, components and materials

Standard dimensions➱ 

generally, DPC is late on brick masonry construction up to the plinth level so the width of DPC is the same as the width of the brick wall and thickness may vary from 2.5 centimetres to 5 centimetres.

Flooring In Building construction➱ 

Flooring is an important component of the home it is one which provided an attractive and pleasant look to the house flooring is made by laying tile on it.

There are different designs and materials are available to make flooring.

➮Timber flooring
➮Laminated flooring
➮Vinyl flooring
➮Porcelain or ceramic tile flooring
➮Natural stone flooring marble granite etc.

Standard dimensions➱ 

Flooring is provided above earth filling with base made of cement concrete 1 : 2 : for flooring material should have sufficient thickness and strength.

Walls➱ 

Walls are the vertical component in any structure it can be constructed using stones, bricks ,concrete blocks etc the different types of bonds are used for constructing walls .bricks walls are essential to enclose the inside area and protect against wind, sunshine, rain, etc. doors and windows are provided in the walls for ventilation and access to the building.

Standard dimensions➱

walls may be made single brick walls or double brick walls the single brick wall has a thickness of 100 millimetres in the double brick wall has a thickness of 230 millimetres.

RCC column➱ 

Columns are vertical members constructed to support any structural frame load coming from the slab, beam transferred to column and column transfer a load to the footing safely.

Building structure may have two types of columns architectural columns and structural columns architectural columns primly used to increase the aesthetic appearance of building while a structural column takes the load coming from the slab above and transfers safely to the foundation.

Standard dimensions➱ 

column may have various sizes as per the structural load requirements but for minimum dimension for any structural column is restricted to 9 X 9 or 225 mm X 225 mm.

Building Construction - Process, components and materials

Sill level➱ 

It is the base point of any window in the house or it is a level where windows are placed. sill level is very important to ensure evenness in all window level sill is a height which is ensuring that the proper amount of light enters in the house it also provides easy to habitat to look outside through the window without any discomfort dotted provides a solid base for window installment.

Standard dimensions➱

Sill level of any house should be around 3 feet or 900 millimetres.

Building Construction - Process, components and materials

 

Lintel➱ 

Lintels are constructed from reinforced cement concrete it is provided above the wall openings like doors, windows etc. the lintel actually takes the load coming on window and door openings.

In sort, lintel safeguard the door and window from excess load coming from above in residential building lintel can be constructed from concrete or brick masonry,

Standard dimension➱ 

Generally, the lintel width is the same as the width of wall and thickness between 4 inch to 6 inch.

Ceiling➱ 

Ceiling is not a separate part but is a bottom face of any slab ceiling is most important part of any room because it can be decorated to increase aesthetic appearance POP(Plaster of Paris) is a material used for making false ceilings. it is a location where we can hang decorative items. fan etc to increase architecture view of room.

Standard dimension➱ 

Ceiling height is kept 9′ 6″ to 10′ 6″ it can be more or less as per requirement.

Chhajjas➱

Chhajjas is also called as weather shed this is a structure which is constructed above window projected outside from window face the main function of weather shed to restrict the direct entry of rainwater and sunlight hatches are constructed from reinforced cement concrete.

Standard dimensions➱ 

The length of chhajjas = width of window + 0.15 M bearing on both side

Width of chhajjas = 0.45 M to 0.60 m

RCC beam

RCC beam is an important component in any frame structure beam is a horizontal member which connects columns on both side. it main function is to take load from upper structure and transfer it to the column.

Generally column to beam connection is called direct support while the beam to beam connection is called indirect support in most of cases the beam supported by two columns and the most rarely used is the cantilever beam.

Standard dimension➱ 

Minimum Beam dimension is 9″X 9″

Building Construction - Process, components and materials

Roof or RCC slab➱ 

Roof is an Important and essential  component for any building structure which provides protection against environmental factors such as Sun, wind and rain.normally all roof rests on sidewalls and required anchoring so that wind and another mechanical  impact cannot destroy it.

Roof may have different shapes but flat and sloped roofs are more popular typically most of roofs are constructed from RCC, stone slab,tiles etc.

Standard dimension➱ 

Generally RCC slab thickness can have minimum dimension 4″ to 6″ as per requirement.

Doors➱ 

Doors are the main entry and exit point of any house without doors there will be no security in house they are one which separates the one room from others doors have locked key facility, so we can lock the house by locking the door and go out freely they are made of strong material like steel, wood, iron ,therefore, they are not easily breakable.

There are different types of doors used in house.
➮Hinged doors
➮Dutch doors
➮Roller doors
➮Bi-fold doors and many more these are discussed below

Standard dimension➱

Main door of the drawing-room, bedroom, kitchen may have a width up to 2’6″ to 3′ and other rooms like bath, W / C is 2′ to 3′ height of doors is almost 7′ every time or up to lintel level.

Windows➱ 

Windows are one of an essential component of any house or building it is one that allows fresh air and light to enter into the house without window house becomes darkroom or jail.

Windows are provided at sill level and their height extended up to lintel level there are various types of windows used in house like

➮Single hung windows
➮Arched windows
➮Awning windows
➮Bay windows
➮Bow windows
➮Casement windows and many more are discussed below

Standard dimension➱ 

Window opening width may change depending as per requirement but its height generally kept 1.4 m From sill level or up to the bottom of the lintel.

Parapet walls➱ 

It’s a Low height wall built along the edge of the roof, terrace, walkway, balcony etc. it is generally constructed with single brick wall.It can be constructed using RCC, Steel, aluminium, glass etc.

Standard dimensions➱ 

Parapet wall height is 3 feet-0.9 m

Building Construction - Process, components and materials

Waterproofing on terrace➱ 

Damp proof course is the protective layer to restrict the movement of moisture water through roof slab. for DPC on roof flexible materials are used which provide a lesser number of joints like mastic, asphalt, Bitumen felts, plastic sheets etc.

Building Construction - Process, components and materials

Copping➱ 

Coping is structure which is constructed on top of boundary walls and parapet wall etc to protect rain water directly store on brick masonry wall.

The main function of coping is to drain off rainwater during the rainy season end improves the aesthetics of the structure/wall.

Building Construction - Process, components and materials

 

The standard room size and location in residential building➱

What are the standard room size and location in residential buildings in this video you come to know about the various standard dimensions of different elements of residential houses.

Area limitations➱ 

The limitation of area and height of the buildings of different types of construction and occupancy is achieved by satisfying floor area ratio (FAR). FAR is taking into account the following aspect.

➮Occupancy class
➮Type of construction
➮Width of the street fronting the building and the traffic load
➮The density and locality where the building is proposed
➮Parking facilities
➮Local firefighting facilities
➮Water supply and drainage facilities

Floor area ratio(far) = total cover area of all floors / plot area 

The floor area ratio is generally in between 1.0 to 2.0 depends on the type of construction.

For example, if a plot measures 15 m X  20 m and building bay- laws stipulates permissible FAR as 2.0 , then the maximum built-up area which can be put on the plot is 600 square meters. if the area covered at ground floor is 150 square meters, the total number of floors that can be constructed is (600/150)= 4,

Height of the building➱ 

The height and number of the story for a building are related to FAR and the provisions of open spaces are already explained earlier dot where the building height is not covered by FAR, the maximum height should be limited to the width of the street as follows,➮

➱The maximum height of the building shall not exceed two times the width of road abutting plus the front open space.

➱If a building abuts on two or more streets of different widths, the building shall be deemed to face upon the street that has the greater width and the building height shall be regulated by the width of that street and may be continued to this height to a depth of 24 m long the narrower street subject to the conformity of open spaces.

➱In the vicinity of aerodromes, the maximum height fixed in consultation with civil aviation authorities.

 Appurtenances is like a water tank on the roof ventilating and air-conditioning appliances, lift room, chimneys and parapet walls not exceeding 1.2 m height are not included in the height of the building.

Standard room size and location in residential building➱ 

The minimum Room size and location for different types of room:➮


➱Bed room, Living room, Drawing room, Dining room, Study room.

Minimum area: 9.5 sqm 

standard living room size 9 feet x 10 feet.

Minimum size of side: 

1- For single room the Minimum width should be 2.4 meter.
2-Where there are two rooms one of these shall not be less than 9.5 square M and others not less than 7.5 square m with a minimum width of 2.1 m.

The height of room: the of all room for human habitation shall not be less than 2.75 m

Other requirement: For air conditioning room height should not less than 2.4 m.

The recommended standard room size and location for the living room of various sizes are as below-



Size Dimension in meter + (Area) Dimension in Feet + (Area)
Large 6.71 X 8.53(57.24) 22 28(616)
Medium 4.88 6.01(29.33) 16 20(320)
Small  3.66 5.49(20) 12 18(216)
Very Small 3.05 3.66(11.16) 10 12(120)



Kitchen➱ 

Minimum Area: 5 sqm.

Minimum size of side: the width of the room should not be less than 1.8 meter and where is a separate store, the area of the kitchen may be reduced to 4.5 square meter, a kitchen that is intended to use as dining also shall have a floor area of not less than 7.5 sqm with minimum width 2.1 m.

The height of room: the kitchen height shall not less than 2.75 square m.

The recommended standard room size and location for the kitchen of various sizes are as below

 

Size Dimension in meter + (Area) Dimension in Feet + (Area)
Large 3.65 6.09(22.23) 12 20(240)
Medium 3.05 4.87(14.85) 10 16(160)
Small  3.05 2.44(6.10) 10 08(80)
Very Small 2.13 2.70(5.85) 07 09(63)

 

What is Consistency test of Cement click to know

Bathroom in water closet➱ 

Minimum area: 1.8 square meter (bathroom) 1.1 square meter (WC)

Minimum size of side: if bath in water closet are combined its floor area shall not be less than 2.8 square meter with minimum side width of 1.2 m.

The height of the room: shall not less than 2 M.

Other requirement 

It should be located such that at least one of its walls open to the external wall.

It should not be directly over or under any other room than another latrine washing place bath or Terrace in case of multi-storied buildings unless the floor is watertight.

it should have a platform or seat of watertight non absorbent materials.

it should be provided with the impervious floor sloping towards the drain with a suitable grade and not towards veranda or any other room.

The recommended dimensions of common bathroom of different sizes are as below: 

Size Dimension in meter + (Area) Dimension in Feet + (Area)
Large 2.13 3.66(7.8) 12(84)
Medium 1.83 3.05(5.6) 10(60)
Small  1.52 2.75(4.20) 9(45)
Very Small 1.06 1.98(2.04) 3.5 6.5(22.75)

 

Storeroom➱ 

Minimum area: the minimum area of storerooms should not be less than 3 sqm.

The height of store room: The store room’s height should not be less than 2.2 meter.

The recommended standard dimensions off storeroom of various sizes are as below:- 

Size Dimension in meter + (Area) Dimension in Feet + (Area)
Large 3.65 4.2615.55) 12 14(168)
Medium 2.44 3.05(7.42) 10(80)
Small  1.52 1.83(2.80) 6(30)
Very Small

 

Garage➱

Minimum area: The minimum area of garage should not be less than 12.5 square Meter.

The height of room: The garage should not be less than 2.4 Meter.

Staircase➱ 

Minimum size of side: The Minimum standard width of the stair is  taken 1 Meter.

The height of stair: The Minimum Standard clear Headroom’s height  shall be 2.2 meter.

Other requirement: 

➯The minimum width of tread without nosing shall be 250 millimetres for residential buildings.
➯The maximum height of rising shall be 190 millimeters for residential buildings.

Plinth height➱ 

The height of the plinth shall not be less than 450 millimetres from the surrounding ground level. a height of 600 millimetres is the best from drainage or other considerations.

Parapet wall➱ 

Parapet walls and handrails provided on the edges of roof terraces, balcony, veranda, etc shall be not less than 1.05 m and not more than 1.20 m in height from the finished floor level.

Boundary Wall➱

The requirements for the boundary wall are as following-

Except with special permission of the authority, the maximum height of the compound wall shall be 1.5 m above the center line of the front street.

Compound wall height up to 2.4 meter height may be allowed if the top 0.9 meter is of an open type construction of a design should be approved by the concerned authority.

Minimum ceiling height standards for residential house➱ 

However, if there is no rule to follow contractors and development both public and private sectors tend to reduce the size of dwellings being developed whilst trying to avoid any reduction in value.

Bye- law for minimum height and size standards allows well-planned and systematic construction of house and towns, and provide proper utilization of space.

How ceiling height is decided➱  

Human height in different position

Before deciding the minimum ceiling height we need to understand human height in different positions in a room as seen in the figure the average human height is around 5 feet 5 inches but, we raise our hand upward it’s around 6 feet 6 inch maximum. so considering this fact the minimum height of the ceiling is taken.

Minimum ceiling height inhabitable room➱  

As we know that the minimum height of door height is about 7 feet for all doors in the house each door of the house. must have a minimum height of 7 feet this is because of the fact that human average height is about 5.5 feet and when we raise hand upward is about 6 feet 6 inches.

So, there must be a gap between our hand and door frame bottom of the top frame.

Nowadays, architects and engineers keep the floor to ceiling height about 10 feet in most cases. again let’s understand this fact also.

Total floor top to ceiling top is about 10 feet. deducting the thickness of the slab becomes 9 feet 6 inches.

Let’s consider fan handing from the bottom of the ceiling is about 1.5 feet downward sight and when any men raise its hand toward ceiling straight as height becomes 7 feet. So The gap remains between men’s hand and bottom of the ceiling fan will be

 = 9 feet 6 inches -7 feet -1.5 feet = 1 foot or 12 inches. 

Therefore from the above fact we can conclude that the minimum ceiling height should at least 9 feet 6 inches for any habitable room in residential building.

Minimum ceiling height in sunken slab of bath and w / c➱ 

Generally, sunken slab for bath and w / c is about 1 to 1.5 feet sunken below the slab. so, if total ceiling height is about 9 feet 6 inches then space left below we’ll be around 7 feet 6 inches.

Therefore the minimum ceiling height for Beth and W / C sunken slab should be 7 feet 6 inches.

Minimum ceiling height for various rooms in house➱  

living room / drawing-room➱ 

the living room of any house is a place or area where the homeowners and family members gather to spend time together dot it’s an area designed for recreation but also for entertainment space where guests are welcomed when visit the living room also termed as drawing-room.

The minimum ceiling height for the living room from the top of floor to bottom of the ceiling should be not less than 2.75 M or 9 feet 6 inches.

In the case of an air conditioned room the minimum height should not less than 2.4 m or 7 feet 8 inches. measured from the top of the floor to the lowest point of a/c duct or the fall ceiling should be provided.

Kitchen➱ 

The kitchen is the most important and essential room in any house because it is the center of your family’s day-to-day living. everyone’s day starts in your kitchen with a cup of coffee or energizing breakfast to start your day.

kitchen space used to make meals for your family in your kitchen and probably even eat in your kitchen.

As the kitchen area is a continuously used area of any house. its ceiling height should not be less than 2.75 M or 9 feet 6 inches.

Bedroom➱ 

A bedroom of any house is one of a private room where people usually sleep for the night or relax during the day it is estimated that humans spent our one-third life by sleeping and most of the time we are asleep we are sleeping in a bedroom.

The minimum ceiling height of the bedroom should not less than 2.3 m or 7 feet 6 inches measure from top tiles to the bottom of the ceiling.

Storeroom➱  

The storeroom sometimes attached to the kitchen is the place for storing grains foodstuff and/or junk in the house for their ready availability and use in an emergency.

The minimum ceiling height of the storeroom should not less than 2.3 m or 7 feet 6 inches measured from top tiles to the bottom of the ceiling.

Bath and water closet➱   

It is an area sometimes attached soiled and often a bathtub in a shower.

The minimum ceiling height of the bath and toilet should not less than 2.3 m or 7 feet 6 inches measured from top tiles to the bottom of the ceiling.

Garage➱  

It is a place where house owner vehicle repaired, perked, serviced and also used for storing used parts and accessories of the vehicle,

The minimum ceiling height of the garage should not be less than 7 feet. but generally, it is kept more than 7 feet.

mezzanine floor➱ 

A mezzanine floor is an extra floor between two main floors, and therefore it is not counted on the main floors of any building.

The minimum ceiling height of the room with the mezzanine floor from ceiling to top flooring of the ground floor is about 14 feet 4 m.

Minimum ceiling height basement➱  

the minimum ceiling height of the basement should be at least 7 feet to 9 feet.

Standard height of window from floor level➱ 

The standard height of the window from floor level is an important point of discussion while constructing a new house or renovating an old house.

The proper height of the window is very important for comfortable living as it permits the Sun and natural air entry from the exact level.

What is window ?➱ 

A window is one type of opening in the wall which provides passage to pass light sound and sometimes air modern windows generally have glazed or covered with transparent or translucent material.

The windows are the most important part of any house which provides light, fresh air, and ventilation in the house. windows are also useful for the purposes of architectural decoration.

The windows provided allows light into the room enhance your wall colors or furniture it provided seasonal utility like allows Sun heat into the room and close the opening during summer to avoid outer heat to enter the house.

Types of window➱ 

there are different types of windows available in the market you can choose from them as per your requirements.

The windows can have different shapes like square rectangular, and even triangular, some windows open outward, some slide up-down, or slides one side to open these types are available in different materials like wood, steel, aluminum and PVC also used to make a window.

Following are the 18 popular types of the window as listed below- 

➱Single hung windows
➱Double hung windows
➱Arched windows
➱Awning windows
➱Bay windows
➱Bow windows
➱Casement windows
➱Egress windows
➱Garden window
➱Glass block windows
➱Hopper windows
➱Jalousie windows
➱Picture windows
➱Round circle windows
➱Skylight windows
➱Sliding windows
➱Storm windows
➱Transom windows

What is standard size of window➱ 

Windows are a very essential part of any house. for a simple residential building or house, a minimum of 15 percent area of the room is allowed to provide for window openings.

That means we can provide a window opening area around 15 percent of the room area if the area of the room is 100 square foot then we can provide one window with size 4 feet x 4 ft for public and commercial building this is around 20 percent allowed,

Width of the window depends on the factors like- 

➱The dimension of the room
➱Use of the room
➱Location of the room
➱Direction and speed of prevailing winds
➱Climatic conditions of the region and
➱Local trends, aesthetic, view, etc

Following are some standard size of windows is mostly used in the house- 

The height of the window generally fix, but it can changed as per architectural and owner requirements windows height is fixed around  feet or up to the level of the door frame or a lintel level,

Standard height of window from floor level➱ 

 There are two levels that are important while placing the window in position.

sill level: – The level or distance from the floor to the bottom of the window frame is called the sill level it is generally kept about 900 millimetres or 3 feet.

Lintel level:- The level from the top of the floor level to the top of the door frame on which lintel is placed is called the lintel.

Level the lintel is generally provided to avoid direct load on the wall and distribute above wall load to below load the lintel is generally made up of reinforced concrete or cement mortar lintel level is provided as same as the height of the door which is generally 2.1 m or 7 feet.

So, the standard height of the door from floor level is 2.1 meter or 7 feet ,it can be simply calculated by following calculations,

The height of window from level of floor = door height – window height 

in case the height of the door is taken 7 feet and the height of the window is taken 4 feet then the

Height of the window will be = 7 feet – 4 feet = 3 feet 

The standard height of window from floor level is 900 millimetres or 3 feet it can vary depending upon the size of the window, ceiling height,and owner requirement.

Types of doors for your perfect house➱ 

What is door➱ 

Doors are defined as “the movable structure used for opening and closing an entrance or forgiving access in or out of something”

A frame used for given access to indoor or outdoor as to a building or room or giving access to a closet, cupboard etc most doors turn on hinges, slide in grooves, or revolve on an axis

Importance of doors

We all know the proverb that the first impression is usually the last and this is true especially for entrance to our homes the entrance of any house creates a lasting impression on visitors mind but somehow doors remain unnoticed unless either they are elegantly done or completed in Bad shape.

Doors are the major important element of any home they do not only provide aesthetically pleasing but also have features like durability, strength, water and heat resistance, and it should not warp with time.

Past days have been gone now doors were used for the mere purpose of maintaining privacy and security. nowadays doors become important aesthetic appearance structure an integral part of a home’s interiors.

Types of doors➱ 

Following are that major types of doors:- 

➱Hinged doors
➱Dutch doors
➱Pocket doors
➱Roller doors
➱Bi-fold doors
➱Sliding doors
➱Pivot doors
➱French doors
➱Panel doors
➱PVC doors
➱Flush doors
➱Battened and ledged doors
➱Bamboo doors
➱Glass doors
➱Aluminum doors
➱Fiberglass door
➱Fiber reinforced plastic doors
➱Steel doors
➱Louvered doors
➱Swing doors
➱Collapsible doors
➱Sliding doors
➱Rolling shutters
➱Glazed Slash
➱Revolving doors
➱Wooden or timber door

Hinged doors➱ 

A hinged door generally made of either a solid wooden panel door or hollow core door affixed to a doer jamb with two or more hinges.

These types of doors are too common and are useful in almost any application in which a doer is required these doors are generally located as front entry rear entry interior and wardrobe doors.

Dutch doors➱ 

A Dutch door also nose is double hung or half door sometimes and is a doer that split in half horizontally allowing the top half to open while the bottom half stays shut secure tight bolt holds the two halves together and it operates as a normal door.

Nowadays Dutch doors popular for their practicality as well as their old-world feel. these doors are the prime choice for interior doors as well allowing you to keep an eye and ear on children and animals while keeping them in or out of a certain part of the house

Pocket doors➱ 

The special feature of pocket doors is that it gets disappear into a special cavity inside the wall when opened.

These doors generally have top hung and slide along a track mounted on the ceiling many house owners choice for pocket doors simply because they like the style. the pocket sliding door is sometimes used to separate two rooms so that they may be joined as needed.

Roller doors➱ 

Roller doors mostly used for garages and storage facilities however they are an extremely trendy addition to a living room for instance.

Bi-fold doors➱ 

Bi-folding doors are generally used for seamless connections between inside and out side of any house. bi-folding designs are not like Dutch or French but they give stacked neatly out of the way providing gloriously open access to the garden and an expansive feeling inside.

Sliding doors➱ 

Sliding doors are also known as bypassed doors and are generally used for locations including large opening as that discovered in a bedroom or closets.

Sliding doors do not swing open and rather you have to move them on the track and that’s why they do not disrupt other components of the space therefore just a part of the opening is accessible at a time.

Pivot doors➱  

The pivot doors are simply designed to rotate about its vertical axis these doors are available with or without a stopper this door can effortlessly rotate 360 degrees in its own axis.

The pivot doors are made with complicated hinges hidden on the top and bottom of the door which forms the center from where the door Tate’s these types of doors.

French doors➱ 

A French door generally made up of one piece and has the light construction with glass panes extending for most of its length dot they are also known as French windows.

If you are searching for something different and eyes catching French doors would be the ideal choice these types of doors have hinges set up on each side of the opening and they swing to each other in full fill in the center they provide an unblocked view when both side doors are opened.

Panel doors➱  

The past panel doors are very popular for quite some time its name gives the idea about its making that the door is crafted not of one single piece of wood or other material.

Generally panel doors are most suitable for exterior doors but if you want a hey ah fire door that can better deaden sound then you can have panel doors installed as interior doors as well.

PVC doors➱ 

PVC or polyvinyl chloride is a very popular material choice for doors in your bathroom these lightweight doors minimize your work while maximizing your investment.

These doors look like painted wooden doors that do not need any maintenance which is for the absorbent natural fibers of the wood if you go for PVC shower doors you’ll find that they’re simple to install and easy to clean.

Flush door➱ 

A flush door is made of solid block board core vertical Stiles and horizontal rails that create a pre fixed frame and block board is composed of wooden strips.

They bonded under high pressure and temperature using a synthetic resin so we can say that the flush door is a Dewar that is made of a timber frame covered with ply from both sides the hollow part Left on is filled with rectangular blocks of softwood.

Afterward the final decorative finish is given by fixing the veneer on the top it is named as a flush door because it has an entirely smooth surface and if water splashed on its surface it would simply flow off its surface without accumulating.

Battened and ledged doors➱ 

These types of doors composed of vertical boards called battens which are nailed or screwed to horizontal members called Ledger’s the battens used are generally 15 to 18 centimetres wide and 2 to 3 centimetres thick normally narrow battened doors have a better appearance.

These doors can be either braced or braced and framed to offer rigidness in a much better look such doors are mostly utilized for toilets, baths, WC and other rooms as well as in homes where the economy is the prime factor to consider.

Bamboo door➱ 

Bamboo strip can be used in doors and windows, including their frames and so on one common option to the wood item is the jute coir composite board which can be made use of for the manufacture of doors.

Doors composed of bamboo Jude have the benefit of being water resistant, rust resistant, termite resistant, environmentally friendly, biodegradable and expense efficient.

Glass door➱ 

Glass is most commonly used for windows and doors primarily for paneling it depends on owner weather like to use glass doors can be made out of glass for particular areas generally glass doors most suitable location is on the back side as it offers an unblocked view of the yard or garden.

Front doors made of glass also look gorgeous however care needs to be required to guarantee both personal privacy and sturdiness fixing one panel of glass set into wood frames are irregular and gorgeous alternative for front doors.

Glass door is more expensive compared to others and needs more effort to upkeep these doors have more weight than other doors besides being pricey.

Aluminum doors➱ 

When you plan to give elegance look to your house what types of door do you prefer ? perhaps the best choice for you would be aluminum aluminum doors already first choice option for contemporary architecture because of the security, aesthetics and insulation properties it gives.

As it well known fact that aluminum is a durable and sturdy material that doesn’t need too much maintenance there is no doubt about the quality of aluminum.

It has already been tested through a bit expensive it’s actually one of the best choices in the door market aluminum doors can be used for both residential and commercial purposes it’s perfect for glazing and glass fronts providing you with a high quality frame.

Fiberglass door➱ 

Generally glass fiber is manufactured by bonding fiber with resin that can be utilized to produce a variety of products consisting of bathtubs, doors, and windows and so on.

Fiberglass is proven to be one of the most solidified products with fairly low upkeep expenses as compared with wood and steel fiberglass doors are well-known as steady as they do not warp, bow or twist.

Windows and doors made up of fiberglass can be offered with wood panels on the surface to surpass the visual Appeals doors manufactured out of fiberglass can be utilized for both outside and interior areas.

Fiber reinforced plastic doors➱ 

Fiber reinforced plastic has high strength it can be put to numerous usages consisting of manufacture of doors FRP doors are available in many colors and surfaces consisting of natural wood surfaces in the market.

These types of doors may have 2 leaves of 1.5 millimetres density and Leafs are molded over a core product forming a sandwich panel FRP doors are one of the popular choice for modern day house construction.

Collapsible doors➱ 

The collapsible doors are composed of vertical double channels (20 X 10 X 2 millimetres) join together with hollows on the inside to create an artificial gap.

Channels are spaced about 100 mm to 200 millimetres apart and braced with diagonal iron flats which allow the shutter to open close giving an appearance of a steel curtain.

The doors shutter operates within two rails one fixed to the floor and the other at the lintel roller fixed on top supports the equivalent movement in both directions for easier operation.

Sliding glass doors➱ 

These doors are generally utilized where there is space limitation for the swing of a hinged door or for aesthetic purposes these doors are commonly used in commercial structures.

The doors shutters slides horizontally along the tracks with the help of runners and rails generally the door is hung by two trolley hangers at the top of the door running in a concealed track.

While at the bottom rollers are provided to slide the shutter in the channel track for providing easy movement plastic rollers are fixed at top bottom.

Rolling shutters➱  

Rolling shutters are generally used for shops /go downs this shutter works as a barrier and provides protection against fire and theft’s wind and hails.

The rolling shutter is made of steel slabs called laths or slates which are around 1.25 centimeters thick interlocked with each other and coiled upon a specially designed pipe shaft called drum mounted at the top.

Such an arrangement is made that shutter moves in two vertical steel guide channels mounted at the ends the channels may be made of steel sheets deep enough to accommodate shutter and to keep it in position.

The rolling door is raised to open it and lowered to close it on large rolling shutter doors more than 10 square meter the action may be motorized.

Glazed / Slash➱ 

Glazed or Slash doors are the same as framed paneled doors except one of the panel’s is replaced with a glass to improve visibility of the interior room.

Revolving doors➱ 

This door has a central shaft with four wings that hang on it the shaft rotates around the vertical axis within around enclosure.

The doors central shaft is fitted with a ball bearing arrangement at the bottom which allows the shutters to move without any jerk and making noise.

These types of doors may be fully penalty glazed or partly glazed.

Wooden or timber door➱ 

These types of doors are primarily used for interior door applications timber is the oldest material used for the doors and timber never seems out of fashion.

There are many good reasons for using wood such as wooden doors provide soundproofing insulation and security. they are easy to install and clean.

They have a long life being a natural material they have a different appeal. they do look elegant they are very costly.

How to reduce construction cost➱ 

Building a dream home is everyone’s aspiration everyone person wants to construct Dream Home .

Where they can cherish their memories but when people want to make their dream into reality.

It is very hard to fulfill it is because house construction cost is not cheap nowadays for the middle class family is about investing their whole life income in building a home.

That’s why many people find it a large investment in their life for this reason they try to save as much as possible to get the optimum value of their price also some people go for loans that are why it is necessary to effectively use the money to get maximum benefit it is not a big task.

Selection of plot➱ 

Because that can reduce your transportation cost for a lifetime but many sellers are there who take the opportunity of high demand and sell the roadside plots at a very high price so be careful while choosing the plot if you are getting it a little far from the main road then it is okay.

Conduct soil test➱  

While selecting a plot just not focus on the communication facility but do soil test which is a much essential part of the construction because there are different types of soils are available and each soil behaves differently before buying the plot check the soil if it is a paddy field agricultural field or soil with hard soil.

Because if the soil is not good or if it is a loose soil then there you will have to expense a huge cost and after if it comes to know that plot having paddy field then the foundation cost is huge and again to get permission to make the home is huge.

Confirm electrical and water supply an area➱ 

If there is no electric and water connection near your plot then you have to apply for a separate pole connection near your home and have to make a separate connection for plumbing which is again expensive so look after these factors before buying a plot.

Choosing construction materials➱ 

In any type of construction building materials play a major Cost effective role among all the construction material bricks, cement, rod and sand make a large part of the construction material if you purchase material.

In the lot main one order for whole material manner then there will be less expenditure regarding construction material. because the dealer will give you more discount as you purchase more amount of material.

Prepare structural drawings➱ 

Preparing structural drawings for the house is essential the majority of people ignore this and don’t know about the structural drawings of buildings.

They only thought about the architectural drawings of the building but structural drawing is all about foundation plan detail framing plan detail column and beam plan detail and other structural components of buildings.

From this structural drawing how much amount of rod send cement and bricks will be required can be calculated in advance and if this is done accurately then there is a chance of saving lots of money.

Saving and finishing materials➱ 

Not only is the construction material only responsible for rising costs along with that finishing the material is also responsible while we consider finishing work there is flooring material doors and windows and especially wooden works for interior absorbs a huge cost.

But this can be reduced if you are choosing proper material and buying material in bulk amount at a time if you are purchasing this material in phase by phase manner the shopkeeper may not give you a discount but if you are purchasing in a bulk amount and from one shopkeeper then you can save your money.

Do not make change after construction starts➱ 

Sometimes people approve one plan before construction and during construction they suddenly change their plan this is one of the major reasons which again increases the construction cost dot try to avoid this thing unless and until it is necessary.

Go for pre-fabrication work➱ 

To minimize the cost of house construction you use modern technology use prefabricated parts for the construction of your home in this type of construction a part of the building is constructed at the factory or in a separate place.

And then combined to a site to make the house it has a lot of benefits it not only reduces the cost but also reduces the time of construction.

Use fly ash instead of red bricks

 If you want to reduce the cost then choose to fly ash bricks instead of red bricks or other bricks fly ash bricks are less costlier than red bricks but have good strength for construction . it can reduce the cost of construction in a considerable amount.

Select good color and putter➱ 

If you wish to reduce color cost then go for lime based color put the color twice to make the color brighter .

don’t use putty generally putty is often used when we need a smooth wall surface or the wall is very rough or there are larger sand particles showing to avoid extra cost for putty always purchased the standard size of sand for the purpose of plastering.

Saving in labor cost➱ 

Labor cost is also a large part of the construction which cannot cut easily but try to calculate the works in hours how much labor will be required to finish work and how much time in this way you can save your cost by estimating the labor cost otherwise the labor will work according to their time and you have to expense more.

Saving in machinery cost➱ 

Construction machines are always hired on a rental basis and their rental cost is too high so try to take maximum advantages of construction machinery in a calculated way by which construction cost can be saved.

Saving and flooring

flooring can be done both costly or economically tiles come in odd pricing range select one of them according to your budget also cement flooring is a great option. to reduce the construction cost and one of the long-lasting flooring.

Saving in wooden work➱ 

As far as possible if there is no essential need for wooden work try to avoid it you can also try to avoid the use of costly woods for construction instead you can use a jack fruit tree while Jack jungle jack and similar wood most available in your place to reduce the total cost of wood up to 50%.

Selecting good shape of house➱ 

The shape of the house also contributes to increasing the cost of construction when the size of home increases it increases the surface area and ultimately the cost of construction so try to sign house such a way that it will reduce the surface area and reduce the cost.

Reduce numbers of wall➱ 

Make the home more spacious by reducing the number of walls it ultimately reduces the surface area and also decreases the cost it also permits natural light to enter the house and decreases the number of electricity expenses.

Click here for more civil engineering knowledge
For Current Government jobs Click here

Pile Load test

Pile Load test

PILE LOAD TEST


INTRODUCTION➱

Something relevant for onshore and coastal areas where the possibility of load testing is feasible whereas for offshore conditions full-scale load testing is not feasible because of several constraints In any case to understand what involves such load test will be very useful so that you can see what alternatives can be worked out for offshore conditions.

But in the near shore around less than 20-25 meters we have done pile Load testing but quite cumbersome quite expensive and time-consuming So the pile Load test if you look at the design of foundation you know there has always been a debate because of the uncertainty associated with the soil parameters.

Always it is understood that design is verified by testing to full scale at the side of the final construction If you look at many of the international course obviously they state that in the engineering based design is not hundred percent sure.

So if you go back to British course or European course including Indian course specially for pile foundation, you will see that every pile needs to be tested to its capacity ,

So if you have seen in a construction site several hundred piles testing every one of them becomes you know elaborate as well expensive time-consuming it puts the whole project in a different schedule of construction activities,

So you select critical piles or piles that may represent actual site conditions So among hundred number of piles may select say 2 piles or 3 piles which may represent actually the site conditions ,So normally most of the modern-day projects we take about 3 to 5 percent of the piles,

That means if you have hundred piles you do the testing of 5 piles So you select them in randomly to distribute all around the site in such a way that you can extract information from this pile testing so that you can represent them in the design process,

But by doing that what you are actually going to do is you take this so-called test parameters and then that calculate and go back to the design revisit the design and adjust the design parameters to suit the tested pile information,

So if the tested file is giving the design or the failure load is lower than the design load means your design parameters what you have used in your calculations are on a higher side or vice versa So you can go back and then adjust the parameters until that you get the design capacity versus failure,

Load is almost close by so this adjustment is even now many of the projects we try to do this so that in the future installation become almost reasonably correct So that means this testing has to be done up front before the construction starts so that is the idea behind pile load testing,

That means you get a comfortable level of confidence which is very essential for foundation system,because you cannot have an uncertainty on a foundation for structure which may actually pose a big threat So the pile Load test has been there for several decades for onshore and offshore projects of near coastal areas,Several kinds I would say So since,

What is the purpose of pile load test?

PROCEDURE OF PILE LOAD TEST➱

Now you see the procedure how we want to start the project with low testing we want to do the load tasting up front before the actual construction starts so you can say sacrificial testing that means once you do the testing of this piles the piles will never be able to use it because you already have failed the pile to ultimate load capacity that means you have a different category of testing

Or you can actually test the same pile which you want to use it as a part of the structure that means you cannot fail the pile but you can actually apply the loading until the load that it may get during its service You know so you can see here now planning is required what type of testing is planned for that particular site whether you want to do a full-scale failure to load test or you want to a working load test,

The test that may actually take you to the level of working load and stop then you actually construct the structural system on top of it So this pile Load test is quite useful in a sense so we will look at various test and the procedures available for us So we will be looking at both horizontal load test and vertical load test,

You know we have specially the coastal areas and the berthing structures and offshore structures we have considered amount of horizontal load compared to onshore structures And then we will look at some of the testing some special testing by which you could actually get the similar information,

But that kind of empirical method you do some testing and extract the information and prorate it to obtain the axial failure load which nowadays seems to be very economical and is quick specially the dynamic testing and some of these are commonly used,

Pile Load test

So if you select 5 percent of the piles for testing using gravity method the remaining 95 percent you know still uncertainty exist because if you look at a site your construction site say 1 kilometre by half kilo meter wide industrial construction and you select only 5 remaining 95 percent of the pile is distributed all along this site,

Now you may conclude based on 5 piles that these remaining piles are safe we have adjusted the design but what surety you have over the distribution of soil within a 1000 meter length it may be very difficult decision So instead you go for the remainder of the pile with simplified method instead of going and putting a big weight and then measuring the displacement and strain you do a simplified method of pro rating the capacity based on certain small scale testing which is what we used in dynamic testing and which is very useful in many cases,

It proved to be So if you do a full-scale testing and on the same pile you do a dynamic testing compared capacity then you can actually get a very good feel how the dynamic testing is fairing with regards to the full-scale gravity testing and your design your theoretical design you have 3 numbers to compare and then you can come to a conclusion,

 And then the remainder of the piles you go and do a So you can see the correlation is very important from gravity testing to a dynamic testing to a engineering design then you go back and do the remainder of the pile you have only engineering design adjustment plus the dynamic testing ,

So this procedure is adopted in most of the large-scale projects but of course if you look at only some projects were only 5 piles 10 piles are there and subject and dimensions of the structure is so small like 50 meter by 50 meter the variability may not be that great so you can do only one pile test and you can leave it,

 And in the application of such simplified methods for pile monitoring for offshore structures is very much useful like what we have learned about your medical scheme to calculate the number of blows required to drive a pile to a particular depth of penetration using a particular hammer,

You can back calculate and it is called pile monitoring system that means you will use the information during driving and then calculate what resistance it would have been offered by the the soil during driving,

And then you just adjust it to long-term capacity using several parameters and then you can predict or at the end of driving you can say the pile would have achieved this much capacity,

Now what you did avoiding here you are not going to place a big weight and try to do a measurement of displacement which is quite cumbersome especially when the pilot very large and the load is huge ,

And that is why the pile monitoring system is one of the indirect means of getting pile capacity in offshore condition and that is what we are going to discuss at the last And in the recent times in the last 10 years,

Or so another method of permanent implant of device into the pile system which is adapted for concrete piles at least You know basically before you install the concrete pile you would a load cell at the bottom of the concrete pile itself,

And just cause the pile and afterwards you have a activation system a wire will come to the ground so you can activate the hydraulics and you just push the pile against the soil resistance And this can be done for ultimate test,

Or it can be so this O-cell test is also employed in some of the onshore projects bridge projects in US but very in this part of the world because it is quite expensive you need to embark a complete load cell inside the pile itself,

Permanently you cannot extract them afterwards so it is just left over there So this O-cell is basically Oster berg cell name after the person the professor who found this method for one of the bridge project in US,

It is in use for quite very useful and few projects we have used it for offshore or coastal so we will go through each one area by little bit detail So the purpose of pile load test is to find out the install pile capacity and verify and remove the uncertainty of associated with the assessment,

That we have gone through do during boring taking Sample and then to laboratory test and then properties and unknown properties are calibrated using past you know information So all those things will be removed once you have the actual capacity versus the displacement,

And to assess the load displacement basically there is no critical information that easy to relate the capacity versus displacement You might have already got the methodology to evaluate the bearing capacity,

 A multi layer site what you saw was basically a single soil layer giving a theoretical relationship between the capacity and the displacement whereas when we have a multi layer soil the behavior itself is going to be complex and the only way to get the load displacement relationship is to carry out complete load test,which will be a prototype in nature you are not doing a scale model like our laboratory,

So the primary purpose is to link and assess the load displacement characteristics of a particular pile at a site So the test can be of in fact 3 categories basically the one that normally carry out is the static load test the load is static in nature and that the dynamic load test which is what we were talking about,

The quicker and the cheaper methods Then we have the bidirectional method using O cell you can actually do this way or the other way In the static load test we have got variety of load application methods,

One is the constant rate of penetration imagine if you have the pile already installed and try to do the loading the displacement is not under control so that means if you go by this method whatever displacement comes you will actually note down whereas if you actually control the displacement by changing the load according to the displacement characteristics,

The rate of petition can be controlled So but the first one is quite obviously very difficult to do because you have to continuously having a monetary system of displacement and adjust the loading according to the rate of penetration,

Not many of the contractors have this facility because you need a feedback loop so that when the displacement increases you have to decrease the loading and it is only feasible by hydraulic means where as normally most of the most load test,

You see in the field they all just put big weights so removal of weight is going to be very difficult So most of the time we do maintained the load test you put one weight weight for several hours according to the procedure and monitor the displacement,

If the displacement become constants that mean for that particular load soil has achieved its maximum possible displacement Then go to the next load displacement and apply the loading wait for several hours and vice versa you remove the loading and look at any elastic rebound happening or is a plastic failure,

So basically this maintained load test is commonly used in most of the projects very rarely we go for this particular method Dynamic load testing we have very similar idea like you know the pile hammer when you take a hammer and drop onto the pile and you see the stress waves travel through the pile and get reflected,

If the absorption is not enough and you measure the statistics of the transmitted stress waves and reflected stress waves and depending on the reflection and the transmission you back calculate using the same principle,

What we were looking at the the dynamic equation and calculate that what would have been the resistance offered by the soil because this much waves has reflected back from the soil itself So that is indirect means but before going and doing the actual testing at the site you may have to actually do a calibration in a known material which is easy to do,

After that you can compare with the known material versus actual pile at the site this is you got 2 types of tests one is the high strain dynamic testing the other one is the low strain dynamic testing just the weight of the hammer and the low strain dynamic testing is normally preferred because for concrete piles,

If you do a high impact the pile itself will actually fail Pile monitoring I think we will talk about it little later it is a simple idea of using the driving information or driving records number of blow counts and you know the duration between the blow,

Sometimes you will have major stresses at the pile tip at the top and calculate back the resistance which is also is dynamic because you are using the pile the hammer impact loading Bidirectional method is quite useful only for the O cell testing which is you can do testing in both directions, because the load cell itself is planted into the the pile foundation,

So you can do vertical load test you can do compression tension I think obviously some of the piles in coastal areas for example berthing structures you will have compression loading and tension loading depending on the magnitude of horizontal load,

So the pile needs to be tested for compression and tension as we calculate the capacity you know pile capacity we calculate using skin friction pleasant bearing that is for compression For tension you will have only skin friction depending on whether the pile is plugged or unplugged,

You will see the internal and external So in this case the tension testing is required for only few number of files for example even if you design a structure the whole structure does not have any tension loading that you do not need to do this type of testing,

But most of the berthing structures will have tension because the gravity loading is very less and it is predominantly going to resist the horizontal loads like ship berthing structures so you will see a huge amount of tension coming at you have to make sure that the pile has sufficient penetration to take the tension loading,

It is not the whole structure will pulled off In many cases what we normally do is if you are unable to penetrate that much longer than you actually do a anchoring of the pile into the ground means you will do a smaller hole we will talk about one of the days,

I think later in one of the sessions about encourage files only for tension loading which is very essential for such type of design Then we have also lateral test static and cyclic and you can see here static test is going to give you certain capacity which will degrade when you apply the same loading,

Several times because the top layer of the soil as we have learned from our P-Y curve near the seabed you can see the soil gets disturbed quite a bit because of the repeated nature of loading and degrade the displacement or increase the displacement degrade the capacity,

So we need to see after how many cycles the capacity gets that means you would see that displacement would be more Then we have loading limit whether to load to the ultimate failure stage that means the pile will go into permanent deformation and the soil or you want to do a routine test by which you will not destroy the pile,

You will only do a extend of maximum working load the structure may get and stop it so that the same pile can be used for permanent construction as part of the structure so either way we can decide Only problem is there is an uncertainty in the second one you know you do not know what behavior,

It will go through after it achieves that so-called working load limit because it can fail straight away plastic deformation can happen or it can have a redundancy after that which will not be revealed when you do the working load test,

Whereas when you do this you will be able to find out at what load the pile is failing then you know what is the factor of sifting because the factor of safety is defined as the ultimate load by working load or ultimate capacity by working load,

So you will only be able to ascertain the factor of safety if you are able to find the ultimate load of what you will not be ascertain that factor of safety because in the working load test you only have that level it may actually fail after just going slightly higher than the working load which will not give you the comfort-ability of the factor of safety,

So that is why the working load test is normally not preferred but then cost versus your factor of safety and design requirements You have to decide how many number of piles you want to do ultimate load test and how many you will do a working load test,

But of course if the test result so large scatter then you will increase the number of piles that you do testing If you do a 5 piles and all 5 of them are shows very reasonable matching of results and you may have actually conclude that no further testing is required but each one of them shows different results and different variations in displacement characteristics you may actually decide to do,

Furthermore addition to the pile testing which again is is actually an procedure is decided by the the site representatives I think we have discussed the performance is design validation I think the primary purpose is design validation whatever corruption you have made during your bore holes and to the design stage,

You would like to validate that those assumptions are nullified so that your process of construction can go Quality control for sure in concrete pile is one of the biggest worry in fact steel pile you do not have such issues but the quality control of concrete pile construction,

Because everything goes underwater you have to displace I think we have discussed about the construction of concrete pile you have to displace the slurry which was poured inside by means of good quality concrete but the quality could not be ascertained because nobody can go inside So when you do this kind of low strain dynamic testing you could also assess the concrete the honey combing structure,

If the concrete is not done properly you will see that the reflected waves will differ from the solid concrete that if you have you can actually have uh testing of pile itself whether the pile is sound enough to reflect and transmit the waves or if the pile has got low honey combing inside also can reveal Similarly for steel piles if the file has been broken during driving and if you do this testing and it will reveal that if the stress waves are not coming you could easily find out where is the fault,

So that is the idea behind this the low strain dynamic testing So basically quality control of the construction itself can be verified by means of carrying out cross correlation test Sometimes you do a design development you know you basically you have a large number of some projects of thousands of piles like if you go to some of the large-scale industrial projects,

You may have several hundred piles So you do a representative pile testing and use that information to further develop and then come up with a design procedure In many cases if you if you look at some of the large-scale projects they actually develop new design procedures specific to the site using the design data collected from the pile load test plus the portable information,

And they come up with their own design strategy and the you know you do not need to follow the standard procedure given in either any of the codes or regulations because it is proved by testing at the site so that will be done sometimes And in many cases always you will use it for further refinement of academic interest,

I think these these are secondary but of course insufficient site investigation normally you do not do a construction without the site investigation but then all depends on you know the the owners intention sometimes some government organisations may not be able to do a site investigation,

Before the hour of contract to the contractor because of the nature of limitations they have They may not be able to allocate funds separately for site investigation and separate for construction it is part of the construction itself So what happens is when a contractor comes to the site they have no clue what is the site so they will be doing the site investigation so that is the time when the design becomes difficult the design has to be evolving based on the available information,

But not actual site information Many cases that happens so you do that at that time when the project starts you have assumed certain parameters during design and then you proceed with the construction but then do the testing 1st Once you do the testing your assumed information verified and several other limitations on you know basically cost is one of the primary parameters,

Nobody wants to do testing if they can live an engineered design I think everyone will be happy but that will not be the Now guidance from Handbook of pile load testing this is just give you an idea of how to decide how many piles is good for a particular site,

You know just of course this is only a guidance it will need to be decided by the site engineer and the and the owner of course for sure depending on how much of time and money is located for that purpose,

But typically you can see the complex or very much unknown ground conditions you know it is isolated place no one has constructed in the vicinity so then probably you can go for a large number of So you see here they recommended is 1 preliminary pile test per 250 piles so that means preliminary means this pile will not be allowed to be used in the permanent construction,

So you do a separate file at an isolated location within the periphery of the the boundary where the structure is going to be built It will not be within inside because what you do not want you do not want to fail the soil between close vicinity of a working pile,

For example you have a pile here and just half a meter away or 1 meter away you want to construct a pile and fill it which is not very good because you cannot install another pile in the because the soil already have mobilized its full strength and failed,

So normally you will go little bit away but not very far you cannot do the testing several kilometres away it does not represents the actual site conditions So within the parameters probably representative location you will do a 1 preliminary test for 250 piles,

So you can see here it is only a guess there is no rule book or it is not representing some kind of you know relationship it is only a guess that it may actually give you some information plus 1 working pile test for every hundred piles,

That means among the remainder of the piles every hundred piles you select one and then do a where the the ground conditions are very much unknown probably not very clear No previous pile test data is available in the site new piling technique is used in case in that area every time,

They were using a concrete pile but suddenly you are going to use a test you are going to use a steel pile then it is an unknown experience very limited information available in such cases you do this Where as if it is the other cases you know your risk is reduced with reasonable information then you can increase or decrease the number of piles per testing,

So you see here 1 preliminary test for 500 piles which and then for very low or in fact you got plenty of data then you can also use 1 in 500 1 in 100 or 1 in 200 In fact codes are not suggesting any of these numbers because they leave it to the,

You know the owners or consultants who are representing the design validation So normally we design something very similar like this 1 in 250 but not very projects will have 250 piles you know maybe 10 20 50 so if you do one pile that itself is good enough,

So this is only a guidance which if you are representing your company for pile testing or if you are writing a specifications for pile testing you can put that kind of number Rabbit load test versus dynamic load test you know the kind of capacity that you expect you know 30 mega Newton is $ 3000 tonnes and what kind of hammer,

You will be using just information that you can use it that much is practically possible to do the testing So if you remember we were talking about pile capacity in offshore pile system I think we were talking about 20 to 30 mega Newton for each pile which is something like this,

So it is not that we cannot do it can be done but at a very expensive system design because water depth is more and you want to design a reaction pile for such type of testing will become costlier than your jacket so that is why we avoid,

I think we just discussed about static maintained load of test versus static penetration test or the so-called constant penetration test you can read some of the information about the past history of what was done the maximum load of what was achieved in the previous several years it can be done to that much of load 3000 times,

So you will see if you go around some of the the pile way construction I think MRT construction is going on I think 6 months back so many places they were doing pile testing for the pillars the big pillars you will see that a use platform is built and concrete blocks are stacked upon each was about 600 tonnes,

So you can see that the bulkiness of that platform to load this 600 tonnes because you calculate a 600 tonnes by either by sandbags or by concrete blocks you will get 3 to 4 layers of concrete blocks will come So safe working load ultimate load and design verification load sometimes differ from we discussed about safe working load is a working load of the pile as per the design requirement Ultimate load includes the factor of safety that means either 2 or 2 and half or whatever the design factor of safety,

As per the design code If it is a IS code you normally use 2 or 2 and a half whereas API code we use 1.51 through and so this is the test load that you will apply if you do ultimate load test Sometimes design verification load is in between these 2 we go 50 percent overload instead of failing the pile,

We do a pile load test taking between the working load and the ultimate load sometimes 25 percent higher than the working load Still the pile can be reused because you are not failing it but it is slightly overloaded just to see that how the behavior goes,

Because if the pile fails immediately after reaching the working load after say 5 percent the the factor of safety is not there anymore So design verification load it can be any one of them or it can be in between also A typical onshore pile load test we will just read the methodology how it is carried out,

So you can here this is a good ground condition means the ground at the surface is reasonably good So we have a gravity based support system something like this you construct pillars sometimes we actually use concrete blocks,

You know simply put on 4 Corners make a steel beam something like this and just you have your pile previously installed which is going to be tested and then with a prepared pile head it could be a concrete piece or steel piece placed on top and then you start stacking up your weight because while you are stacking up because people have to go up and load,

It or you your Crane has to bring material and then just keep stacking up And then you will place a hydraulic jack or Jacks 1 or 4 of them normally 4 of them is used and just jack it up So what happens is previously when it was loading is done at that time no load is going to the pile and safe because for a longer duration,

You do not want to keep this condition because it will topple or slides down to sideways you will be putting big danger on the pile itself as well as the system So normally you have this is called Cantalage weight distribution system this is feasible only when the ground conditions are good number 1 and also the the distance from the pile should be sufficient enough that the load does not actually alter the soil conditions in the vicinity of the pile,

Imagine if you do this and if the soil gets actually squeezed and get compressed the pile capacity that you are actually going to measure is not going to be represented in the actual site condition because already the soil has been compressed and consolidated,

So that is why you have to keep this support system quite away from the pile itself so you have to keep it 3 diameter to 4 diameter away so this cantalage becomes actually very large depth girders normally you will see 2 meter-3 meter girders spanning between the supports something like this you have to keep 10 meters away if it is a 2 meter-3 meter pile,

So they will be away so that that influence of the reaction is not coming back to the soil So this is a typical onshore pile load test that using you know spread footing type reaction system so that is the idea put behind So this test can be repeated if it is a working load test you just load-unload load-unload,

But load will not be applied in one single stage normally because then you you will only get one load one displacement relationship So you actually divide the total load into say several steps if it is a 300 times divided into say 5 or 6 steps and put 300 into say 6 steps means 50 tonnes and just look at the displacement then go to hundred tonnes wait for some time and till the displacement becomes constant,

Then you take the displacement reading go and put the further loading so it is just done in steps And then similarly you can do a unloading so from 300 you come to 250 and 200 and so on so you can see whether the loading path and unloading path is same or different,

If there is a plastic deformation then you will see that there is a different load path from loading to unloading so that also can be verified If it is a soil condition that the top surface soil is not good or it is going to distribute the load very close to the the pile that is being tested then you may actually look at installing additional piles and this is the case most of the cases it happens like this So install additional number of piles in and around the test pile,

Normally 4 number of piles are installed and you prepare a cantalage which is nothing but a just a grid of beams which will support these weights to re stacking during unloading process and then when you want to do the testing you simply use the hydraulic jacks to activate,

And then lift it up So you can see the difference between soft bound you know soil condition at the surface to good soil condition the expense increases several folds You can see here here just only a simple pedestal support quick to make easy to remove where as when you go to this one you can see here for one pile load test,

You are installing 4 number of piles so you can see the the multiplication of the time and the cost and the removal you have to remove these piles you cannot leave them there itself unless it is isolated place,

So basically the procedure is same only the difference is depending on pile condition you will do the support reaction and cantalage according to the requirement And if you are going to do the same testing in coastal waters 5 meter 10 meter 15 meter 100 meter water depth can we do this,

So that is where we bifurcated into a different idea if it is a 20 meter water depth yeh probably you can design a pile which will be directed around the other load testing pile and make a platform something like this and then construct this frame load and unload can be done up to say 10 meter 15 meter 20 meter,

But when you go beyond 25 meters will easily see that the diameter of the pile tested and diameter of the support frame the diameter 0 becomes too large If you actually have to do a pile test in say jacket location 100 meter water depth because jacket is still not there because jacket will come only after you complete all your design and everything,

You cannot do testing of a pile through a leg for sure it is impossible So when you want to do this 100 meter water depth imaging you may have to actually specially fabricate a jacket vertical in nature is not it something like this and keep the frame there and put the pile inside and do the testing,

That means, it becomes another project so that is why this pile testing is completely not feasible so maximum pile testing I think for coastal areas people have done up to 20-25 meters maximum beyond which you will see that the design of the system itself becomes a problem,

Specially when you are doing so much loading coastal areas 300 400 500 tonnes But for jacket type of structure if you want to mobilize weight of 3000 tonnes which is becoming a bigger problem so how to avoid even in coastal areas even in land based structures can we do testing without this weight,

This is one of the very good idea so that you can avoid for example if I go and connect this beam with this pipe so what will happen I do not want to put the weights here so instead of using this weight as a reaction what we want to do is we have simply weld this this beam with this pile So what happens,

When you are actually putting up the hydraulic jack the reaction will come from soil itself so that is basically the idea in the recent times no one wants to do a this this is called Dead weight method of testing,

And you can just look and eliminate the so much of weight bringing the weight stacking upon and removal can be removed provided these piles which were installed as a reaction pile or a support pile has sufficient pullout capacity otherwise that pile will come,

You do not know whether you are measuring the this displacement of this pile or whether you are measuring the pullout of the other pile which will become a very complicated situation,

Pile Load test

PILE LOAD TEST PART -2

Let us continue with the pile testing so by this I think you could understand the 3 concepts concept 1 foundation by means of simple spread footing for the cantalage itself And basically pile foundation where the ground condition does not permit Load distribution around the test pile the primary concern is we should not put undue load to the pile soil interface which is being tested,

So that is why we have to space it larger enough so that the pressure from the thus upload pile cantalage support pile does not affect or influence the result of the test pile itself that is one concern The 2nd concern you know when you are doing measurement of a displacement of the pile being tested you need to have a firm ground or a darter line by which you will be able to measure the the settlement,

For example in this case the ground condition is good and also you have accessible ground so you just put the darter line which is not going to change over period of time during the testing So if there is a easy way of putting a dial gauge with respect to the ground and then measure the movement of the pile,

Now if you go to the offshore condition what happens if you have no firm condition or firm ground you have to use only the the pile which is supporting the cantalage but at the time of testing it is not loaded anymore,

So you can use that as a reference and use a beam or some welded connection so that you can use the dial gauge So what we need is the the firm place it is not moving during the testing so that is one of the 2nd concern And then when you are doing the testing,

In any case it is not influencing the soil-pile interface or the capacity of the test pile which is being done the now-that is one of the idea so you need to keep it faraway 3 to 4 diameters so your cantalage anyway will require a larger space to stack up the waste and things like this Very rarely in coastal areas we do this because,

It is very expensive one of the tests could take months to set up and do it and bring back A typical cantalage test which is just on land so you can see here even in this particular case it was done in one location in Kakinada where last year before you can see piles were driven so this ground condition was so bad that even you cannot spread the load which coming from so much of sandbags,

So we need to have piles going down to a firm ground because the total top 15 meter of soil is play soft clay and if you try to put some spread footing it will definitely think under this kind of support reaction load during stacking and then you cannot retrieve and every time when you just load and unload the foundation becomes no use,

So that is the picture that you are seeing the pile is being tested which is at the middle and basically the pile will be provided with a pile cap steel plate and these are the jacks which are just placed between the cantalage and pile head just to stack of you know And the dial gauge can see here is placed at this place and this is the reference to the pile head itself,

And this is the bottom line which is not moving So when the pile is moving up the dial gauge will show the displacement every time when your how much pressure you are applying The alternate ways also because instead of instead of going for cantalage with self weight or dead weight,

We can actually use this method by using the pile itself as a reaction frame So you do need to stack up weights only thing is the load is produced onto the test pile by means of the compression load because you are just holding this cantalage frame on the sides using the pile so this is being a welded connection,

So always this anchor pile will be under tension so you need to have sufficient capacity of the anchor pile so that so that means if you are testing a 3000 tonnes here each one of them will have to be divided by 4 and recently have designed with the adequate penetration because it is only tension At least this pile have the N bearing whereas the anchor pile will not have N bearing so you need to have sufficient penetration sometime it may become very large,

And basically bigger bigger than the test pile because you need bigger capacity in tension than the test pile is being a compression capacity so you have to be little bit So that is where this method becomes little bit difficult because it might become very expensive,

When you compare with this maybe better because you do not need to mobilize so much of material movement every time because it is not one-time you will see that later on the sandbags have gone back and forth several times because you have to do loading sequence and unloading sequence and you have to repeat the test at least 2 times,

And that is where you find this is a time-consuming process and also very expensive Anchor pile seems to be very good but then caution needs to be taken in terms of design make sure that when the pile is being tested this is the anchor that you have designed it is not going too much,

Otherwise you will be measuring actually relative movement of the pile anchor pile and the pile being tested Typical reaction pile setup so you can see here this is the pile being tested pile requires to be tested otherwise you have the jack being placed at the and these are the pile heads the left side and right side you see the pile heads which the piles are being driven with the pile head,

And when you just push this hydraulic jack upwards the reaction being applied to the test pile and these the reaction piles on the left side and right side should have sufficient capacity and basically that should be designed And just a closer view of how the hydraulic jack is placed in the girder,

So that it reacts against the test pile as well as the reaction pile Another load test using concrete blocks instead of sandbags many times people use this because it is easy to handle and can be used in multiple places only require storage,

But in any case in construction sites you will find many of these concrete blocks uhh spare capacities available there but many times people use these sandbags because easy to dispose because they can be used for construction work no extra storage space is required and each one of them will be weight before placing it on the top so that you know the weight what it is only the stability of them,

Sometimes bit of a worry because even a small eccentricity caused by either placement or by you know stability the whole thing can be turned In many places if you notice pile load test failed because of the cantalage tilted or cantalage failed which will cause quite a bit of problem,

Whereas using concrete blocks is quite useful because it is very stable sometimes these concrete blocks will come with a sheer case so you can have an opening at the bottom and you can when you place it it will not go anywhere and horizontal stability is well-established,

We can have precast blocks specially for testing not just for any other purpose So the ultimate load test is basically done to the load which is taken to the maximum failure capacity of the pile which will be 2 times or 3 times depending on what the factor of safety used in the particular project of particular core of design,

It is most of the time for IS codes we design for factor of safety for 3 which is for concrete piles which actually says 2 to 3 but then mostly we use factor of safety of 3 that means you find out what is the load that is designed for for working conditions take it to factor of safety of 3 and then find out So typically,

If you look at 300 tonnes is a working load most of the 1 meter-1 and half meter diameter piles then you multiply by 3 you will take to nearly thousand tonnes so imagine thousand tonnes what could be the requirement for dead weights Working load test is typically one and a half times safe working load so we want to go for slight overloading,

But not to the ultimate stage As long as you want to see passing of the working load and also have little bit of budget get depends on how much design margin is available at sometimes be reduced to 25 percent we normally call it overload test Even mechanical devices nowadays everyone of them the working load test is not acceptable,

You have to go for slightly overload because if the load exceeds the working load even by slight amount it should not fail so that is why overload test is about 25 to 50 percent So the 2 methods of testing that we were discussing the other day is constant rate of penetration or maintained load constant rate of penetration is just you can see here 0.75 mm per minute,

So it is a quite slow process and that eventually required by the British code 800 is for design of foundations And maintained load test typically used in most part of this construction site in India is very easy to carry out you do need a sophisticated loop back system simply put the weight and get the whereas the constant rate of penetration,

You need a good amount of instrumentation to read the the penetration backward and adjust the pressure accordingly and it can only be done by hydraulic system not by dead weight and cantalage method it is just not feasible,

Whereas the maintained load test even in a very simple method which you need a dead weight and a jack And the load shall be maintained constant until settlement rate is decreased to 0.25 mm per hour so what we normally do is use you set up your cantalage put the weights safer example 900 tonnes divided into say 5 steps or 6 steps,

So the step 1 of the load and this activates hydraulic jack to transfer the load to the test pile relieving the Anchorage piles or support system and then monitor the displacement Initially displacement of the pile may be larger slowly  reducing indicating that the soil has achieved its failure state at that load and then it will go constant or may slightly increase in a very low implement,

So once you see that it becomes flat the displacement graph is flat that means you are not expecting any more images settlements you may actually expect long-term settlement which may be several years which is we are not interested in that So basically then how do you decide when to stop the or when to restart,

The unloading process because every time you are going to unload it bring to 0 then stack up to the next increment So 1st time say you arriving 200 tonnes and bring to 0 that means you have to take out the load and load it again to 400 tonnes so that process when you want to start as soon as you see the displacement relationship is going flat,

That will be better but if the rate is still within this then you can go that means when the displacement is happening you cannot do unloading process So maintained load test is quite simple we will see the procedure later on something like this so you see here you put the 200 tonnes and then that the displacement is increasing,

So what you will see is when you are doing unloading process if there is elastic part it will come back There is permanent deformation of the soil that will not come back that will be residual so it will keep on stacking up so that is what we are interested in Similarly we go to the 2nd 2nd step so when the 200 ton weight is placed on the cantalage,

When you relieved the hydraulic jack the load will go back to the support stock then put another 200-300 tonnes on top of it It will become 400 ton take the hydraulic jack and load it on to the pile and just repeat the procedure until you reach the total test load it could be ultimate test load or it could be working test load,

And every time you do this you will see a loading-unloading curve you can see so basically you will be taking this as a displacement 9 mm 8.5 mm for 200 tonnes so you can go and plot here load displacement in a different relationship,

And typically we will take several hours because get this flat curve sometimes you may have to wait longer time depending on type of soil if it is a sandy material you will get the displacement quickly after that it will just become flat If it is a clay it might take little bit longer time but then instead of setting this criteria IS codes actually gives the time to wait for one hour depending depending on  type of soil,

You may only vary little bit So if you look at the procedure given in IS codes it will give you the timing every time step how much time you need to wait and then start the process of loading-unloading In fact this this particular procedure is taken from pile testing manual which I was talking about day 1,

So the design specifications load all it is basically the test load if it is ultimate test design verification load will be your total load multiplied by the fact of safety 25 percent 50 percent 75 percent so this procedure is just segmented into 4 subdivisions 30 minutes so once you load 25 percent load wait for 30 minutes and 100 percent load wait for little longer time,

And then during the unloading process only because relieving of elastic compression will take just like this it is not going to take time so unloading time they are just allowing you to only little time 10 minutes And then again we start the process  100 percent and you are going to do a overloading test,

There you are going to wait for little longer time beyond the design verification load if it is a working load test and then repeat the procedure So basically this is just typical time versus increment of load,

I have just taken from the you know the manual of pile load testing from the Association of civil engineering contractors every everywhere they used this but if you look at the IS codes they may actually gives slightly different numbers and different timings,

You know so depending on which jurisdiction you want to use So if you look at this graph load displacement curve for ultimate load test up to failure So you can see depending on type of foundation material you will see 3 types of so if you look at the blue one N bearing and V crock basically it increases and then suddenly fails,

So you will see a certain capacity reaching the rock is trying to fail so almost like elastic and perfectly plastic so something similar like this And if you look at the black one friction pile in soft clay or sand you will see that highly nonlinear it keeps increasing and then the failure rate will be slow down achieving certain capacity,

Or else if you have a fiction pile in stiff clay also will be very similar but then there will be a downgrade effect because the stiff clay broke down when it is achieving the so typically you will see something similar when you plot the when you extract the displacement from  such plots,

Nowadays you can automate these kinds of things so automatically we will get a time bound graph then you can later take the displacement come up with the displacement versus the applied load graph is something like this and basically you need to decide,

Now what capacity is to be taken as ultimate or working load So depending on what the allowable all ultimate reflection that you want to permit remember when we were doing the TZ curve for clay and sand we were talking about 0.1 inch for sand and then 1 percent for clay something like this,

So that corresponds to the ultimate failure whether you want to consider here for steel piles has to be decided by what is your ultimate failure to state you want to define So once you define that limiting load or limiting displacement then you can go onto the graph you can take this is my ultimate failure load of the pile beyond which we will not be able to take it Saturday is the idea behind construction of this diagram is just to make sure that your TZ graph you have made is going to be reflected here,

And if you get a representative from here and that will be realistic because this is based on test where as the other one is based on historical data and empirical methods So you see here in this particular one the ultimate capacity at 25 mm settlement is taken as 425 tonnes,

So though it is highly nonlinear some amount of plastic deformation have happened compared to when you go to the blue if you look at it this is completely elastic and after that only becomes the plateau so you can see the difference So that is the way we want to determine,

When you do a testing I want to determine what is the ultimate capacity The thing is you have to sum up what is the displacement at which you would like to take for example when you are designing a structure you will always have a limiting deflection in both horizontal and vertical working load conditions,

So then if you are allowable capacity you want to find from this then suppose your fix rate 10mm is the allowable displacement during service life of the structure then 10 you just go to 10mm the pile has achieved a 350 tonnes,

Pile Load test

Now if you take the ultimate capacity apply a factor of safety of 3 or 2 you will only get something like 120 tons so that is what will be revealed here If you do not know about this graph is going what you are trying to do is if you take 420 tons join from here straight away to 0 make a straight line that is what you are doing by means of factor of safety 420 divided by factor of safety of 3 on load,

Whereas if you have this this graph you know very well that you can allow maximum of 10 mm during its service life with the factor or on factor load then you can decide how much margin you have almost large margin is available,

When you take 10 mm and restrict to 10 MM is the displacement 420 decided by factor of safety of 3 you will get around 130 tons that is what you are going to permit But actually the pile has got deserved capacity up to 350 at the same 10 MM displacement,

So that will be the difference when you have nonlinear load deflection curve especially after testing So this will give you a picture how much extra margin you have because of the soil behavior and if you take this one you will not get anything better is not it Because you are grabbing almost linear relationship,

If you take that will be the capacity of say 550 tonnes divided by straight away factor of safety of 3 you will get somewhere around 180 tonnes Whether it is 10 MM or 5 MM you are going to just linearly prorate so does not matter So that is the idea of constructing or establishing load displacement characteristics up to failure,

If we have only established up to for example some lower displacement because you are not going to do a failure test you are going to do a working load test just up to the linear portion then you may not actually reveal how the behavior after this this is why at least one or 2 piles at the site you have to do up to failure to see how much margin,

You have It can behave this way which we do not know unless you do the testing Then we also move onto horizontal load test basically similarly you can do horizontal load test One of the biggest problems is doing reaction she just now we have learned about vertical load test with support arrangement,

Somehow we can make it because it is similar piles can be driven but when you do horizontal load test you need to have some ground or firm support condition just to measure the horizontal displacement of the pile and also to transfer the reaction from the jacks which is going to be a big challenge So doing it onshore itself is a challenge,

Then when you are doing it in coastal or offshore conditions it is even a challenge because you have to design a system stronger than the test pile itself and install it And also you can carry out cycling load test in cases of coastal structures where cyclic behavior is required for degradation effects So typically you see here some working platform is required,

And I would have just straightaway gone to the coastal areas where some of the berthing structures we still do this lateral load test to establish the capacity in horizontal direction but most of the structure on land normally we do not do you know horizontal load test not really required,

Because predominantly it is not so much problem so far for buildings and bridges predominantly gravity load So you see here we have a test pile which is in yellow colour and we have a reaction pile and just the jack,

Now you see here the jack is placed in between attached to both the pile heads and the jack is trying to expand by giving horizontal load through the test pile the reaction is transferred to the reaction pile Noise they reaction pile stable the reaction pile displacement is smaller or ignoble then what you are measuring is the pile head displacement otherwise he will be measuring the relative displacement,

Because this pile is also moving the other pile also moving and how much we have to find out So you need a chili credit system to find out what will be the displacement which will be quite tough,

Because you can theoretically calculate but then it may not be correct A reference will be used another few numbers of piles is required or system is required to support all this as well as access to these places,

So you will see that horizontal load test becomes reasonably expensive because you have reaction frame and you also have a reference frame the reference frame the green colour what you see is a reference frame against which you will do the measurement of displacements,

And they are need to be placed sufficiently you know wider spacing otherwise what happens when you are doing when you are doing reaction here when the pile is trying to bend it puts undue pressure on the soil and that soil gets affected by this particular location and behavior of the lateral capacity is going to be affected to some extent and that is why you have to have minimum of 3 diameter or 4 diameter or 5 diameter,

Once it become wider spacing mounting of the jack becomes a problem you need to design a frame and that is going to put you onto support system together it has to be mounted onto the 2 piles which needs to be free to move so that is one of the challenge A typical cyclic load test results or plot how you carry out loading and unloading process basically horizontal load versus lateral load displacement,

You take it one cycle at particular load level bring it to 0 repeat it few times just to get the repeatability and again increase the higher load repeat it again load and unload since there is no dead weights are involved it is only hydraulic jack doing such load test is very easy then you repeat it again and again for various loads and stop,

When you actually reach the expected displacement for example ultimate load test you are trying to do for 100 mm maximum If you are doing a ultimate horizontal failure load test then you can go up to failure of the pile and stop otherwise you have a predetermined load by which it will not be a larger capacity,

Most of the pile if you look at 50 tonnes or maybe maximum 70-80 tons unlike the vertical capacity where you have thousands of tons or sometimes very large number Here it all be you know restricted by the pile horizontal shear because if the soil does not fail what will happen the pile will fail,

So if you look at the Shell capacity of the pile that will give you the maximum magnitude by which you can test in fact will apply factor of safety on it What you do not want you do not want the system to fail before the soil fails system means the pile itself or the anchor pile itself,

So you will find out what is the bending capacity of the pile or structural capacity and shear capacity Make sure that you have got sufficient factor of safety available on the structural system prior to go to ultimate load test,

Because you do not want the system to fail when there will be a catastrophe And in some cases in the coastal structures like berthing structures we may require pullout test because some of the piles are actually going to have tension capacity requirement especially when you build a berthing structure the front pile will be in tension the back pile will be in compression,

When you are having shift or berthing against the berthing structure So such you may require a pullout test instead of a compression test it is exactly opposite of it only the cantalage placement and the hydraulic jack placement is in the reverse condition,

If we just go back to our the this test somewhere here I think something like this so this this one is anchor pile method you are doing a compression test just reverse the process and placement of the hydraulic jack you will get the So basically the cantalage arrangement is attached to the reaction pile,

And there will be stress blocks and you have hydraulic jacks and then you attach your brackets welded to the test pile itself So what you are trying to do is you are compressing the reaction pile and pulling up the test pile so basically you are just reversing the reaction just to get what tension capacity is available Many times you will require this for coastal structures but magnitude will be not very big,

Few hundred tons So what are the things that we need to note down when you are doing a compression load test the support frame needs to be designed appropriately because you you have such a large weight to be placed Support piles needs to be placed away by 3 diameter that makes the so if you have 2 meter diameter pile you need to go for either side 3 meters 3 times 2 meters 6 meters so the frame becomes 12 by 12 or 15 by 15 Structural capacities of test pile,

As well as the support piles leads to be made sure that it has good adequate capacity Special care must be given to the test pile because it is a cantilever whereas actually the same pile when it is working in the actual structural system it may not be a cantilever it may be combined pile heads with the other structures,

Whereas when you are doing testing it is a pure cantilever you must remember what is the difference between pile in a temporary condition which is a cantilever to a supported pile in the permanent condition because of high level buckling The load capacity will come down drastically,

So you cannot think about always you have pile 1 meter diameter in a permanent system which is connected to a bigger structure which may not behave as a pure cantilever so the effective length and the conditions are different you are 1 meter diameter pile may work there whereas the same 1 meter diameter pile,

When you bring to the test category it becomes a pure cantilever number 1 high-level buckling load will be definitely half or less than the actual buckling capacity When you are doing the same ultimate load test here you do not want the pile to fail So what we really need to do is keep the diameter same because you need you do not want to change the pile-soil interface is not it Because we want to test the 1 meter diameter,

But what you can do is you can increase the wall thickness to increase the bending stiffness buckling capacity shear capacity in such a way that structure does not fail but the soil pile interface is being tested,

You understand the idea know so you need to make sure this otherwise if you bring the same pile and testing before the soil fails the pile collapses and then it puts the whole system into problem that is what you have to make sure So what IS codes are suggesting instead of what we saw was 25, 50, 75 they have divided into 5 sub-segments of loading 20, 40,60.80 to 100 so it is just a little difference,

And basically loading-unloading cycles almost similar I am not very sure whether I have copied the time cycle You can look at the code the time is also given 30 minutes up to 6 hours so you can refer to the code but what the criteria,

I wanted to look at it is basically when do we decide it has achieved its ultimate capacity and it is applicable only for concrete piles you cannot apply this one to steel tubular piles uhh it is not under that particular code So if you look at this graph,

I have just plotted one of the recent last year test two thirds of final load at which the total displacement attains value of 12 MM So you just look at the graph and just go around apply the criterion number 1 the safe load on a single pile for initial test should be least of the following,

So the criteria is given Do the testing comeback here plot the graph and look at these criteria whichever is lower that is your safe working load so that is the criteria that you are going to apply And of course this is written on the basis of onshore structures you know 2911 is a code for both the concrete piles for onshore applications not even for coastal applications that is why you cannot blindly apply this principle to a coastal structure on or offshore structure where displacement get area are different from dawn show structures,

You will see that they are very strict in terms of displacement because these are applicable to buildings and bridges or to some extent industrial structures on land where they are controlled by deflection Whereas if you go to coastal structures and offshore structures the displacement are definitely going to be larger,

You cannot even think of the criteria here because here they are talking about 25 MM When you think about coastal or offshore structure you are going to have several hundred millimetres of displacement because of the the magnitude of horizontal load you have to be a bit cautious and apply the principle differently 50 percent of final load at which the total displacement equal to 10 percent of the pile diameter,

So these are the 2 criteria so if you see there the criteria 1 and criteria 2 you can find out whichever is giving you the capacity I think even the lateral load also similar crater is given 50 percent of the final load at which the total displacement increases to 12 MM final load at which the total displacement corresponds to 5 MM and then any load corresponds to any specified displacement this is some at least some option is given for horizontal load,

So according to your project specific requirement so you specify I can go out to 50mm then I can look at so that if that is the thing that we need to have a decision-making process just doing load test alone will not be good enough you do not know what to do with that what you need is the demarcation what will be the acceptable displacement for that particular type of structure and applicable code in force,

What the API says we do not have a procedure to restrict the displacement unfortunately there is no requirement because we do not need because offshore structures are subjected to so much higher loading that if you restrict 25 mm displacement for example your structure will be so much bigger and may not be practical,

So that is why the the adapted method by API is to design by the factor of safety which gives you an adequate safety against pile failure or premature failure and at the same time you have a ductile material which is steel,

And you are not worried about failure by other means of fracture because the worry in concrete structure is larger displacement either in vertical direction or in horizontal direction can cause superstructure failure by fracture because the concrete cannot fail by the tail,

So that is one of the reasons why most of these concrete cores they restrict the displacement to smaller where as the offshore structures we never build using it except the concrete gravity platforms all the fixture types of structures are built by steel material has higher tensile capacity and also have a ductile characteristics In that reason we go by the method of engineering-based design based on soil properties with adequate factor of safety and we leave that we do not want to apply the restricting displacement,

The reason why we developed TZ all that is to make sure that pile is actually subjected to the actual load load displacement behavior and the bending stresses are calculated So if we have a larger displacement what happens is the pile is subjected to larger bending and larger bending means the requirement of section and the diameter and the thicknesses are going to increase,

So you design for it rather than trying to limit the displacement of the pile to lower value and increase the larger diameter so that is exactly the the design method adapted by API so so far I do not think any problem with that idea One of the issues with concrete pile supporting concrete structure is the architecture and finishers,

And serviceability requirement that is why it restricts the displacement to a very small value in fact the reason why we restrict to 1 inch is because of that You know if you have the structural system capable of taking the architectural finishes and service functions will be seriously disturbed that is why buildings are designed for smaller displacement,

For other post please click here
Click here of govt jobs

STANDARD PROCTOR COMPACTION TEST

STANDARD PROCTOR COMPACTION TEST

STANDARD PROCTOR COMPACTION TEST
PROCTOR COMPACTION TEST

 

STANDARD PROCTOR COMPACTION TEST

hello, In this post we will be going over The Laboratory procedure is used for a standard Proctor compaction test this Post will demonstrate how to conduct a standard Proctor compaction test in accordance with ASTM (American Society for Testing and Materials) specifications.


This test was developed to evaluate the level of compaction in the field of compacted soils In the proctor compaction test the soil is compacted into a mould as specific energy ➵➵➟comparable to the energy used in the field the laboratory practice is performed at varying moisture contents to establish a dry density versus moisture content plot.


From this plot, the maximum value not weight and optimum moisture content can be determined the practical application of this test in geotechnical engineering is for compacted specification of soils the maximum dry unit weight obtained from this test can be used to determine the relative compaction of soils in the field.

EQUIPMENT’S FOR STANDARD PROCTOR COMPACTION TEST



The equipment required for the standard Proctor compaction test is➯


➱4-inch mould having
➱volume of one-thirtieth of a cubic foot
➱collar,
➱standard Proctor compaction hammer measured weighing five-and-a-half pounds and dropping 12 inches to moisture content cans,
➱steel straight edge,
➱large mixing pan,
➱graduated cylinder capable of holding up to 250 millilitres
➱spray bottle,
➱metal spoon
➱knife we’ll also be needing
➱digital balance
➱oven for moisture content determination


In a sample extractor the soil that we will be performing the standard proctor compaction test on as a low clay silt obtained from the Mississippi River Valley the soil has been mechanically pulverized than air dried the lab documents pertaining to today’s lab can be found on blackboard the handout is posted there and is titled C 215 laboratory number five Proctor compaction testing in addition an ASTM standard pertaining to this lab is also posted ASTM the 46 98 pertains to practicum passion testing also available is today’s datasheet

PROCEDURE OF STANDARD PROCTOR COMPACTION TEST



The standard Proctor compaction test consists of mixing soil with water to a predetermined moisture content the soil water mixture is then compacted into a mold of a specific volume with a standardized energy at low moisture contents. inter-particle friction will hinder compaction resulting in a low unit weight as moisture increases the friction in between the particles reduces and the particles will compact into a more dense pattern.

STANDARD PROCTOR COMPACTION TEST
PROCTOR COMPACTION TEST





At past a certain moisture content notice the optimum moisture content water will start to take the place of dry soil particles and the dry unit weight will again go down by conducting several standard Proctor tests at varying moisture contents.


 This curve can be established in the maximum dry unit weight and corresponding moisture content can be determined to perform the proctor compaction test.


Start by weighing the empty Proctor mould without the collar, and record the empty weight on your data sheet also weigh the two moisture content cups and record their weights as well, with a calliper record the dimensions of the mould so the volume can be calculated average three equally spaced diameter dimensions in three equally spaced Heights dimensions so that an accurate measurement of volume can be established way out approximately 2,000 grams of the provided air-dried soil,


Now that we have our soil weighed out the desired amount of water to add to the soil must be determined the weight of the water that needs to be added to our soil can be determined from this equation,


The weight of the water equals the weight of the soil 2,000 grams in this case times the final moisture content minus the initial moisture content the final moisture content is the target moisture content which I have selected to be 15% the initial moisture content is all the water that is trapped inside the air-dried soil,


This has been predetermined to be 2.5% with 2,000 grams of soil and an initial moisture content of 2.5% in a target moisture content of 15% it can be determined that I need to add 250 grams of water to my soil or 250 millilitres to obtain the correct amount of water from the tap and pour the water into the spray bottle using the spray bottle,


Add the water to the soil and start mixing it till it becomes a uniform colour and consistency when all the water is gone and the soil has been mixed to an even and uniform consistency it is time to place the soil in the proctor compaction mould,


Start by placing the collar back on the proctor mould spoon enough soil into the mould that when compacted the soil mould will be filled approximately one-third of the height of the mould,


Now you want to place the mould on a hard surface such as a concrete floor and compact with the Proctor hammer compact the soil using the standard Proctor hammer use 25 blows spaced evenly throughout the layer for proper compaction,


After 25 blows take the mould back to the table scarify the surface and add more soil for the next lift scarify the surface of the first compacted layer with a spoon this will ensure that the second layer will bind to the first layer,


Well spoon enough soil into the mould so that when compacted approximately 2/3 of the height of the mould will be filled again take the mould to the concrete floor and compact it with the standard Proctor hammer,


The soil should fill the mould and extend past the top of the mould an eighth inch using the straight edge trim smooth the top of the soil mould using the leftover material fill any voids that might appear in the surface of the soil,


Remove all this loose soil around the mould and way the mould without the collar loosen the soil mould from the base with two hands carry the soil in the mould into the extractor and extract the soil from the mould,


Insert the soil and mould into the extruder with two hands carefully pick up the soil specimen and carried it into the other room,


After the sample has been extruded split the sample with your knife take samples from the top and the bottom and place them in the moisture cans,


For moisture content determination weigh the cans on the scale and record the weights place the cans in the oven for 24 hours,remove the cans and record the dry weights the dry unit weight of the compacted soil specimen,


The moisture content can be calculated from several iterations of this test a plot of the dry unit weight vs. moisture content can be determined from this plot the maximum dry unit weight and corresponding optimum moisture content can be determined.


You must read The Consistency Test of Cement  click here

Read in Detail About STANDARD PROCTOR COMPACTION TEST Click here