PSD Installation Begins at Mumbai Metro Line-2A’s Stations

SHARING HELPS OTHERS



Starting with Borivali West Station, KTK group and their subcontractor this week started core cutting work for installing Platform Screen Doors (PSDs) at Mumbai Metro’s 18.6 Line-2A (Yellow Line)’s stations.

The installation of PSDs across Mumbai Metro’s early-bird elevated Line-2 and Line-7 have been planned with a single aim to prevent suicides and accidents due to passenger movement, especially since the platforms aren’t as wide as elsewhere around the country.

For Line-2A’s 17 stations – its combined 13.9 million USD and 117.17 crore contract was awarded to KTK Group in May 2019, through Package MS03 (Lot 1), after a lengthy tendering process by the Delhi Metro Rail Corporation (DMRC). The scope includes their design, manufacture, installation and commissioning.

Route of Line-2A’s northern section (Dahanukarwadi to Dahisar East) which’ll open first – view Mumbai Metro Yellow Line Info & Route Map

Here’s a video shot at Borivali West (formerly Don Bosco) Station this week:

Elsewhere in India, PSDs are currently operational across Chennai Metro’s underground stations, Delhi Metro’s Yellow (few stations), Pink, Magenta & Airport Express lines, Noida Metro, Kolkata Metro’s Line-2, and in the coming years are planned to be installed in Ahmedabad and Mumbai (Line-2, 3, 4 & 7), Pune and Nagpur.

NCRTC and BEL in November 2020 signed a MoU to develop indigenous platform screen doors (PSDs) under the Atmanirbhar Bharat, or self-reliant India, initiative for use across all transport systems such as bus rapid transit systems (BRTS), mass rapid transit systems (MRTS / metro), regional rapid transit systems (RRTS / commuter rail), high speed rail (HSR) systems, and mainline railway lines.

For more updates, check out my Home Page!

– TMRG





Source link


SHARING HELPS OTHERS